Delhi–Mumbai Expressway

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Delhi–Mumbai Expressway
दिल्ली–मुंबई एक्सप्रेसवे
Route information
Maintained by National Highways Authority of India (NHAI)
Length1,350 km (840 mi)
ExistedMarch 2023–present
Major junctions
North end1. DND Flyway, Delhi
2. Sohna, Haryana
South end1. JNPT, Maharashtra
2. Virar, Maharashtra
Location
StatesDelhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra
Major citiesNew Delhi, Faridabad, Ballabgarh, Sohna, Alwar, Dausa, Sawai Madhopur, Kota, Mandsaur, Ratlam, Dahod, Vadodara, Bharuch, Surat, Navsari, Valsad, Virar and Mumbai
Highway system

The Delhi–Mumbai Expressway is a 1,350 km long, 8-lane wide (expandable to 12) under-construction access-controlled expressway connecting India's national capital New Delhi with its financial capital Mumbai.[1][2][3] The under-construction Vadodara–Mumbai Expressway has been subsumed in this project.[4] Foundation stone of the project was laid by union minister Nitin Gadkari in presence of Sushma Swaraj & Arun Jaitley on 8 March 2019.[5] The total project value including the land acquisition cost is around 1,00,000 crores.[6] An additional 30 km long spur will also be constructed by the NHAI from Noida International Airport in Jewar to Ballabgarh on this expressway.[7] Upon completion in March 2023, it will become India's longest and busiest expressway, as well as world's longest expressway.[8]

Delhi–Mumbai Expressway will connect DND Flyway in Delhi to Jawaharlal Nehru Port in Maharashtra via Dausa,Sawai Madhopur,Kota, Ratlam, Vadodara and Surat. It passes through the states of Delhi (9 km), Haryana (129 km), Rajasthan (373 km), Madhya Pradesh (244 km), Gujarat (426 km) and Maharashtra (171 km). The main length of the expressway is from Sohna to Virar only i.e. 1,198 km. Additionally, it has two spurs: DND–Faridabad–KMP (59 km) and VirarJNPT (92 km), which increases its length to 1,350 km.[9]

Initially, the expressway will be 8-lane wide with the greenfield-alignment route in backward areas, which will reduce the current 24 hours travel time to 12 hours.[10][11] Land for an additional four lanes shall be reserved in the middle of the road for future expansion, along with the space for utilities, plantation and public transport on both sides. This expressway, along with Western Dedicated Freight Corridor (Western DFC) will be a vital backbone of the Delhi–Mumbai Industrial Corridor.

Route alignment[edit]

At the Delhi end, the Delhi–Mumbai Expressway has two main entry/ exit points: DND Flyway in Delhi and Alipur village, north of Sohna in Haryana.[12] Traffic coming from both ends and moving towards Vadodara/ Mumbai will merge at the cloverleaf interchange with KMP Expressway in Nuh district of Haryana. The greenfield alignment is as follows:[13][14]

Section 1: DND–Faridabad–KMP[edit]

NCT of Delhi (09 km)[edit]

Haryana-I (50 km)[edit]

Section 2: Sohna–KMP–Vadodara[edit]

Haryana-II (79 km)[edit]

Rajasthan (373 km)[edit]

interchange on sikri naugaon road near bas burja village(bharatapur district)

Madhya Pradesh (244 km)[edit]

Gujarat-I (149 km)[edit]

Section 3: Vadodara–Virar[edit]

Gujarat-II (277 km)[edit]

Maharashtra-I (79 km)[edit]

  • Gujarat-Maharashtra border
  • Virar (Palghar district)

Section 4: Virar–JNPT[edit]

Maharashtra-II (92 km)[edit]

Formation of SPV[edit]

The National Highways Authority of India (NHAI) has formed a Special purpose vehicle (SPV) to finance the construction and operation of the Delhi–Mumbai Expressway. The SPV has been registered on 29 August 2020 by the name of DME Development Limited (DMEDL) and it will be wholly owned by the NHAI.[22] By floating SPV specific to a corridor, NHAI is aiming at diversifying its resource base to develop a sustainable and self-liquidating approach to raise finances. The toll on the projects housed in SPV shall be collected by NHAI and SPV shall get the annuity payments without any construction and tolling risks. On 1 March 2021, DME Development Limited received the highest 'AAA' credit ratings from CRISIL, Care Ratings and India Ratings.[23]

Construction[edit]

Construction Phases[edit]

The entire 1,350 km long Delhi–Mumbai Expressway has been divided into 4 sections with a total of 52 construction packages/ tenders, where the length of each package is between 8 km to 46 km.[24][9]

Section Length in km No. of packages State-wise packages
DND–Faridabad–KMP 59 03 1 in Delhi and 2 in Haryana
SohnaKMPVadodara 844 31 3 in Haryana, 13 in Rajasthan, 9 in Madhya Pradesh and 6 in Gujarat
VadodaraVirar 354 13 10 in Gujarat and 3 in Maharashtra
VirarJNPT 92 05 5 in Maharashtra
Total 1,350 52 06 States

List of Contractors[edit]

The NHAI has awarded the construction work in 52 packages to around 20 construction companies. Around 15,000 hectares of land has been acquired for this project. The list of contractors is as follows:

Sr. No. Name of Contractor Length in km No. of packages
1. Apco Infratech[25] 47 2 in Haryana
2. Ashoka Buildcon[26] 13 1 in Gujarat
3. CDS Infra Projects 61 2 (1 in Haryana & 1 in Rajasthan)
4. Dhaya Maju – Crescent EPC JV 57 2 in Rajasthan
5. Dilip Buildcon – Altis Holding JV[27] 08 1 in Rajasthan
6. Dineshchandra R. Agrawal Infracon (DRA) 84 4 (1 in Delhi, 2 in Haryana & 1 in Rajasthan)
7. Gawar Construction 31 1 in Rajasthan
8. GHV India[28] 80 3 (1 in Madhya Pradesh & 2 in Gujarat)
9. G R Infraprojects 224 8 (1 in Rajasthan, 5 in Madhya Pradesh, 1 in
Gujarat & 1 in Maharashtra)
10. HG Infra Engineering[29] 116 3 in Rajasthan
11. IRB Infrastructure[30] 52 2 in Gujarat
12. Ircon International 32 1 in Gujarat
13. JiangXi Construction – MKC Infrastructure JV 62 2 in Madhya Pradesh
14. KCC Buildcon[31] 67 2 in Rajasthan
15. Larsen and Toubro (L&T)[32] 37 2 (1 in Madhya Pradesh & 1 in Rajasthan)
16. Montecarlo Construction 26 1 in Maharashtra
17. Aditya Enterprise (Surya) 53 2 in Gujarat
18. PNC Infratech[33] 42 2 in Gujarat
19. RKC Infrabuilt 26 1 in Maharashtra
20. Roadway Solutions India Infra 87 3 in Gujarat

Note: As of 16 August 2021, Tender for 122 km length is pending i.e. for 1 package in Gujarat and for 5 packages in Maharashtra (VirarJNPT section).

Project financing[edit]

The project is being executed in 52 packages, out of which 31 are under Engineering, Procurement and Construction model or EPC projects (Sohna–Vadodara segment) while the remaining 21 are Hybrid Annuity Model or HAM projects. The HAM Model is a hybrid or mixture of EPC Model and BOT Model in which the Government of India will pay 40% of the project cost in trenches linked to milestones, while the balance 60% cost will be arranged by the contractors.

World record for construction[edit]

In Gujarat, contractor Patel Infrastructure created a world record by laying Pavement quality concrete (PQC) in 2.58 km length in 4-lane width (4x2.58 =10.32 lane km) within 24 hours. The work of laying PQC started on February 1, 2021 at 8 am and ended the next day at 8 am. An 18.75 metre wide German-made Wirtgen concrete paving machine was used in this stretch.[34]

Special features[edit]

The various special features of the Delhi–Mumbai Expressway are as follows.

Wayside Amenities[edit]

The expressway will have Wayside Amenities at 93 places having facilities like ATM, hotels, retail shops, food courts, charging stations for electric vehicles and fuel stations. It will also be the first expressway in India to have helipads and fully equipped trauma centers at every 100 km for accident victims.

Electric Highway[edit]

On 25 March 2021, Union Minister Nitin Gadkari said in Lok Sabha that there is a plan to develop a stretch of this expressway as an e-Highway (electric highway) where trucks and buses can run at a speed of 120 km/hour which will bring down the logistics cost by 70% as heavy vehicles will run on electricity instead of diesel. National Highways Authority of India (NHAI) has started the construction of this project, and is expected to be completed by March 2022.[35][36]It will also have 4 dedicated lanes for electric vehicles in the entire expressway, out of 8 lanes.[37]

Environment friendly[edit]

It is being developed as an environment-friendly expressway with a tree cover of 20 lakh trees, watered with drip irrigation along the entire stretch with a rainwater harvesting system at every 500 metres. Expressway will be lit using a mix of power supply from state grids and Solar energy.[38]

Wildlife crossings[edit]

A combined length of 2.5 km of this 8-lane wide expressway will have run under 5 natural-looking wildlife crossings on the stretches identified as the known wildlife corridors between tiger reserves. One of these crossings will be a tunnel in Mukundara Hills National Park, which will be the country’s first 8-lane wide tunnel. This will be the first expressway in India to have wildlife crossings. The crossing over the expressway will have 8 meters tall noise barrier walls on either side, and the uncovered stretch of expressway passing through the wildlife corridor will have 6-foot tall walls on both sides of the expressway to prevent animals and pedestrians from entering to minimize the impact of traffic zipping past at speeds up to 120 km/hour. This expressway runs through Aravalli Wildlife corridors especially affecting corridors between four Tiger Reserves of Rajasthan, namely Sariska Tiger Reserve, Mukundara Hills National Park, Ranthambore National Park and Ramgarh Vishdhari Wildlife Sanctuary, all of which are important Tiger reserves of India.[39][40][38] There is overcrowding at Ranthambore, and tigers have migrated to other sanctuaries and reserves via the Aravalli wildlife corridor, for example, at least 3 tigers have migrated out of Ranthambore to Ramgarh since 2013.[41]

Wildlife experts have expressed concerns as there are not sufficient wildlife crossings on this very wide 8-lane expressway, especially between Sariska and Ranthambore reserves as well as Sariska reserve and leopard habitat forests of Delhi-Gurugram-Faridabad-Nuh in Delhi NCR. Area is also part of leopard corridor of NCR. Additional wildlife crossings are needed at several locations, such as on alignment near Faridabad (alignment near Nimot-Kot-Dhouj forested hills), hills east of Bhadas (hill from Devla Nagli to Rithat to Khanpur Ghat), Hills near Firozpur Jhirka (crossings near Kheri Kalan, Regarh, Bhakro Ji, Bas Burja), Naugaon, Dohli, near Alwar and Sariska (Ghata-Chirawanda-Kalakha), Nangal Todiyal, Bandikui, Dausa, Chhateda, etc.

Connectivity[edit]

The Delhi–Mumbai Expressway will be directly connected with various other expressways like Delhi–Noida Direct Flyway (DND Flyway) in Delhi, Kundli–Manesar–Palwal Expressway (KMP) in Haryana and Ahmedabad–Vadodara Expressway in Gujarat. In Maharashtra, it will be connected with Mumbai–Nagpur Expressway and Mumbai–Pune Expressway.

Side spur[edit]

The expressway will have multiple side spurs in the future, which will help commuters to connect with other major cities which are not directly connected on the main route. In October 2021, the NHAI has started the construction of a 30-km long addition side spur connecting Noida International Airport in Jewar with Ballabhgarh (Faridabad), Haryana on this expressway.[42]

Status updates[edit]

See also[edit]

References[edit]

  1. "The importance of Delhi-Mumbai Expressway & how it will reduce travel time to just 12 hours". Dainik Jagran. 16 September 2021.
  2. "Land acquisition complete in Haryana for Delhi–Mumbai Expressway". The Times of India. 24 November 2018.
  3. "Govt announces plans to build Delhi-Mumbai expressway for Rs 1 lakh crore". Hindustan Times. 17 April 2018.
  4. "Land acquisition cost for new Delhi-Mumbai expressway to be lower by Rs 20k crore". Economic Times. 17 April 2018.
  5. "Union ministers lay foundation stones for Rs 1 lakh crore Delhi-Mumbai, Dwarka expressways". The Economic Times. 8 March 2019.
  6. "From Delhi to Mumbai in 12 hours flat? Expressway to be ready in 3 years". Business Standard. 17 April 2018.
  7. "Jewar International Airport will be linked to Delhi-Mumbai Expressway". News18. 16 September 2021.
  8. "World's longest expressway between Delhi and Mumbai to open in March 2023: All you need to know". The Indian Express. 18 September 2021. Retrieved 22 October 2021.
  9. 9.0 9.1 "Contract award status of Delhi–Mumbai Expressway as of May 2021" (PDF). NHAI. 28 May 2021.
  10. "12-lane Delhi-Mumbai Expressway will ease traffic on Mumbai-Pune expressway, other westerly highways". India TV News. 13 February 2021.
  11. "Delhi–Mumbai Expressway: New route map, road alignment planned; 5 exciting things to know". Zee Business. 15 September 2018.
  12. "Villagers seek KMP & Delhi-Mumbai expressway link". The Times of India. 27 November 2020.
  13. "New Gurugram-Mumbai expressway to be ready in 3 years: Nitin Gadkari". The Times of India. 17 April 2018.
  14. "Delhi-Mumbai Expressway new route to save ₹ 16,000 Crore: Nitin Gadkari". NDTV. 14 September 2018.
  15. 15.0 15.1 "Soil testing for Delhi-Mumbai Expressway link begins in Faridabad". The Times of India. 26 October 2020.
  16. "Faridabad bypass will be broadened for the Delhi-Mumbai Expressway". Dainik Jagran. 18 January 2019.
  17. "NHAI to connect Delhi-Mumbai Expressway with KMP Expressway". Hindustan Times. 2 March 2020.
  18. 18.0 18.1 "Delhi-Mumbai Expressway: Five flyovers planned on Sohna-Ferozepur Jhirka stretch". The Times of India. 15 April 2021.
  19. "Picnic spot to come up at Ferozepur Jhirka on Delhi-Mumbai Expressway". Amar Ujala. 5 April 2021.
  20. "Delhi-Mumbai Expressway will cross Kota-Lalsot highway at 3 places". Rajasthan Patrika. 12 July 2021.
  21. "Delhi to Kota in 4 hours by Delhi-Mumbai Expressway". Rajasthan Patrika. 17 July 2021.
  22. "NHAI forms special purpose vehicle for Delhi-Mumbai Expressway". ANI News. 13 August 2020.
  23. "NHAI unveils funding pattern for Delhi-Mumbai Expressway". Financial Express. 17 March 2021.
  24. "Information and status of Delhi–Mumbai Expressway project". The Metro Rail Guy. Retrieved 29 May 2021.
  25. "Construction firm official shot dead near Sohna in Haryana; 1 held". The Tribune. 24 February 2021.
  26. "Ashoka Buildcon update on Vadodara–Mumbai Expressway project". Business Standard. 9 October 2018.
  27. "Dilip Buildcon – Altis Holding Corporation JV receives LoA for new EPC project". United News of India. 23 December 2020.
  28. "GHV India wins 2 packages of Delhi-Mumbai Expressway". The Metro Rail Guy. Retrieved 27 May 2021.
  29. "HG Infra Engineering bags 2 NHAI projects worth Rs 2,100 crore in Rajasthan". The Economic Times. 10 February 2020.
  30. "IRB Infra wins NHAI contract for executing Vadodara-Mumbai Expressway". Business Standard. 2 August 2020.
  31. "Ardent Infra to work with KCC Buildcon on Delhi-Mumbai Expressway". Construction Week Online. 23 June 2020.
  32. "L&T Construction bags order worth Rs 1,425 crore". The Economic Times. 23 March 2018.
  33. "PNC Infratech bags two projects worth Rs 1,548 crores from NHAI". Outlook India. 23 July 2020.
  34. "Patel Infrastructure creates World record for laying pavement quality concrete". ANI News. 3 February 2021.
  35. "Delhi-Mumbai Expressway: Modi government plans to construct e-Highway". Financial Express. 26 March 2021.
  36. "Delhi-Mumbai Expressway with a separate e-lane to be completed within a year". Live Mint. 25 March 2021.
  37. Desk, India com News (13 September 2021). "Delhi-Mumbai Expressway: 4 Dedicated Lanes For EVs; Travel Time To Reduce To 13 Hours". India.com. Retrieved 14 September 2021.
  38. 38.0 38.1 38.2 38.3 "In 2 years, drive from Delhi to Mumbai in just 12 hours". The Times of India. 18 April 2021.
  39. In a first, India to get five ‘animal bridges’ on Delhi-Mumbai highway, Times of India, 6 Oct 202.
  40. Delhi-Mumbai expressway: The proposed project may be a threat to tiger species in India, Finheadlines.com, 28 December 2018.
  41. Ramgarh Vishdhari to be the fourth tiger reserve in Rajasthan, Hindustan Times, 5 July 201.
  42. Service, Tribune News. "NHAI begins work on corridor to link UP airport, expressway". Tribuneindia News Service. Retrieved 22 October 2021.
  43. "IRB Infra bags road project worth Rs 2,043 cr from NHAI in Gujarat". The Hindu Business Line. 19 March 2018.
  44. "Work on Delhi–Mumbai Expressway to begin from December 2018: Nitin Gadkari". The Economic Times. 24 August 2018.
  45. "Ashoka Buildcon creating history with India's first 8-lane Extradosed Bridge". NBM & CW. March 2021.
  46. "Delhi-Mumbai e-way work to start in March 2019". The Times of India. 5 January 2019.
  47. "Gadkari lays foundation stone for 90,000 crore E-way". The Hindu. 9 March 2019.
  48. "Union ministers lay foundation stones for Rs 1 lakh crore Delhi-Mumbai Expressway". The Economic Times. 8 March 2019.
  49. "Budget 2020: Delhi-Mumbai Expressway to be completed by 2023, says FM". mint. 1 February 2020. Retrieved 17 September 2021.
  50. "Budget 2020: Delhi-Mumbai Expressway to be completed by 2023, says FM". HT Mint. 1 February 2020.
  51. "Impressive progress on Delhi-Mumbai expressway gets analysts attention". Outlook India. 9 June 2020.
  52. "Work awarded for Delhi-Mumbai Expressway Link". The Times of India. 3 August 2020.
  53. "All efforts being made to complete Delhi-Mumbai Expressway project expeditiously: Nitin Gadkari". The Economic Times. 19 July 2021.
  54. "UP to bear half of cost of link road connecting Delhi-Mumbai Expressway with Jewar Airport". The New Indian Express. 16 August 2021.
  55. "UP, Haryana to share cost of Delhi-Mumbai Expressway link to Jewar Airport". The Times of India. 15 August 2021.
  56. "World's longest expressway coming up in India, gets finish date: 7 points". Live Mint. 18 September 2021.
  57. Service, Tribune News. "NHAI begins work on corridor to link UP airport, expressway". Tribuneindia News Service. Retrieved 22 October 2021.
  58. "अप्रैल 2022 तक खुल जाएगा दिल्ली-मुंबई एक्सप्रेसवे का पहला हिस्सा". Hindustan (in hindi). Retrieved 20 December 2021.{{cite web}}: CS1 maint: unrecognized language (link)