Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Mumbai Metro Green Line 10 Extension
Maha Mumbai Metro.png
Overview
Other name(s)Gaimukh To Shivaji Chowk (Mira Road)
StatusApproved
OwnerMMRDA
Line numberMetro Line 10
LocaleWestern Suburbs
TerminiGaimukh (Thane)
Shivaji Chowk (Mira Road)
Stations4
Service
TypeRapid Transit
SystemMumbai Metro
Operator(s)Mumbai Metro
Depot(s)Owale & Gaimukh
Daily ridership2024 0.8 million 2031 1.2 million
History
Planned opening2024; 0 years ago (2024)
Technical
Line length9.2 km (5.7 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed90 km/h (56 mph)
Highest elevation3.90 m (12.8 ft)
Route map
Template:MM Line 10

Green Line 10 (extension) of the Mumbai Metro, also referred to as the Gaimukh-Shivaji Chowk (Mira Road) corridor, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

In February 2017, the MMRDA announced that the DMRC was preparing a detailed project report (DPR) on Metro 10. Preliminary plans prepared jointly by MMRDA and DMRC. The line will run parallel to Thane - Bhayandar Highway, and will joint with metro route no 9 at Chhatrapati Shivaji Maharaj Chowk. The project is estimated to cost ₹3,600 crore (US$530 million).[1][2][3]

Prime Minister Narendra Modi in Mumbai on September 7 laid the foundation stone of Mumbai Metro Lines 10 the 9.2-km long Gaimukh to Shivaji Chowk (Mira Road) Metro-10.It is expected to be completed in 2022 and is expected to provide interconnectivity among Mira-Bhayander, Thane, Borivali and rest of Mumbai. It will reduce the current travel time by between 50% and 75% depending on road conditions.

Planning[edit]

The Government of Maharashtra is keen to implement expeditiously the Master Plan Corridors recommended by DMRC on a fast track mode and to complete them in the next 3-4 years. To start with, it is decided to take up the task of updation of DPRs and also preparation of new DPRs for the following potential elevated metro corridors

1. Gauge (Nominal)::- 1435 mm

2. Route Length::-

# Name of Extension Elevated (km) Underground (km) At-Grade (km) Total Length (km)
1 Gaimukh to Shivaji Chowk (Mira Road) 8.414 km 0.68 km 0.115 km 9.209 km

3. Number of stations::- 4 (All Elevated)

4. Traffic Projection: :- Extension from Gaimukh to Shivaji Chowk (Mira Road)

Year Daily Ridership
2021 2,64,188
2031 4,66,551

5. i. Design Speed 90 km/h

ii. Maximum Operating Speed 80 km/h

iii. Schedule Speed 35 km/h

6. Traction Power Supply: :- a. Traction system voltage 25 kV AC

b. Current Collection Over Head Catenary

c. Receiving Sub Stations One near Kashimira/ Shivaji Chowk (Mira Road)

7. Maintenance facilities: :- No additional depot has been proposed for this extension. Same depot of Gaimukh to CSMT metro corridor, either at Owale or Gaimukh shall be used for this extension also after due augmentation.

8. Structure: :-

i. Elevated: Viaduct with Precast twin „U‟ girders on Single pier with pile foundations upto radius 300m and flatter, for sharper curves and location of Points & Crossings I-Girder. Station structure with viaduct columns supporting the concourse girders by a cantilever arm.

ii. Underground section with New Austrian Tunneling Method (NATM).For the small underground section running under the hills, New Austrian Tunneling Method (NATM) of the underground construction can be employed.

9. Terminals :- Since this is an extension of Gaimukh to CSMT metro corridor on Gaimukh end. Thus this section has only one terminal station as mentioned below:

Shivaji Chowk (Mira Road) This is an elevated station. It is proposed parallel to proposed Kashigaon Station of Metro Line-9. Scissors cross overs are proposed at the rear end of this station. Scissors Crossovers will be provided at the terminal station viz. Shivaji Chowk (Mira Road) station.

10 Depot :- No additional depot has been proposed for this extension. Same depot of Gaimukh to CSMT metro corridor, either at Owale or Gaimukh shall be used for this extension also after due augmentation.

Planning[edit]

The proposed Metro Rail at Mumbai has one corridor covering an approximate distance of about 9.209 km. The corridor is having 4 stations, all are elevated. Some sections of the corridor are underground/below the hill. Almost all the stations are on the road stations.

The stations have been located so as to serve passenger requirements and to enable convenient integration with other modes of transport. Efforts have been made to propose station locations at a uniform inter-station distance as feasible. The average inter-station distance is ~2 km, though it varies from 0.873 km to 4.34 km due to land-use and topographic reasons. The Minimum Inter-station distance is between Shivaji Chowk (Mira Road) Station and Kashimira Metro Station i.e. 872.941 m. The Maximum Inter-station distance is between Gaimukh Reti Bundar and Varsova Char Phata i.e. 4342.345 m.

Station Type

The stations have been planned with side platforms to avoid the viaduct structure from flaring in and out at stations, which obstructs the road traffic below. Care has been taken to locate stations in straight alignment. However, in some stations, site constraints have become the deciding criteria and a curve of 1000m radius has been introduced in the platform.

List of Stations[edit]

Mumbai Metro line 10 Map
# Station Name Inter-station Distance (m) Type of the station
1 Gaimukh Reti Bundar 0 Elevated
2 Varsova Char Phata 4342.34 Elevated
3 Kashimira 2684.64 Elevated
4 Shivaji Chowk (Mira Road) 872.941 Elevated

Train Operation Plan

The underlying operation philosophy is to take the MRT System more attractive and economical, the main features being:

  1. Selecting the most optimum frequency of Train services to meet sectional capacity

requirement during peak hours on most of the sections.

  1. Economical & optimum train service frequency not only during peak period but also

during the off-peak period.

  1. Optimization of the train's reliability for achieving the best possible availability online.
  1. A train consists of 6 coaches for the year 2021 which will be augmented to 8 coaches to

meet the future demand.

  1. Multi-tasking of train operation and maintenance staff.

Mumbai Metro Line 4 with Line 10 and Line 11 Extension plan:-

List of stations of Line-11 & Line-4 (CSMT to Gaimukh) and Line-10 (Gaimukh to Shivaji Chowk (Mira Road)) which is the extension of Mumbai Metro is given below: -

S. No. Name of Station Station Type Connections
1 Shivaji Chowk (Mira Road) Elevated Line 9 (Mumbai Metro)
2 Kashimira Elevated None
3 Varsova Char Phata Elevated None
4 Gaimukh Reti Bunder Elevated None
5 Gaimukh Elevated Line 4A (Mumbai Metro)
6 Gowniwada Elevated None
7 Kasarvadavali Elevated Line 4 (Mumbai Metro)
8 Vijay Garden Elevated None
9 Dongripada Elevated None
10 Tikuji-ni-wadi Elevated None
11 Manpada Elevated None
12 Kapurbawdi Elevated Line 5 (Mumbai Metro)
13 Majiwada Elevated None
14 Cadbury Junction Elevated None
15 Mahapalika Marg Elevated None
16 RTO Thane Elevated None
17 Teen Haath Naka (Thane) Elevated None
18 Mulund Naka Elevated None
19 Mulund Fire Station Elevated None
20 Sonapur Elevated None
21 Shangrila Elevated None
22 Bhandup Elevated None
23 Bhandup Mahapalika Elevated None
24 Naval Housing Elevated None
25 Gandhi Nagar (Kanjurmarg) Elevated Line 6 (Mumbai Metro)
26 Surya Nagar Elevated None
27 Vikhroli Elevated None
28 Godrej Company Elevated None
29 Shreyas Cinema Elevated None
30 Laxmi Nagar Elevated None
31 Pant Nagar Elevated None
32 Garodia Nagar Elevated None
33 Amar Mahal Junction Elevated Line 2 (Mumbai Metro)
34 Siddharth Colony Elevated None
35 Suman Nagar Elevated None
36 Anik Nagar Bus Depot Elevated None
37 Wadala Truck Terminal Elevated None
38 Bhakti Park (Wadala) Elevated Line 1 (Mumbai Monorail) & Line 11 (Mumbai Metro)
39 Ganesh Nagar Elevated None
40 BPT Hospital Elevated None
41 Sewri Underground None
42 Hay Bunder Underground None
43 Coal Bunder Underground None
44 Darukhana Underground None
45 Wadi Tower Underground None
46 Clock Tower Underground None
47 Carnac Bunder Underground None
48 Chhatrapati Shivaji Maharaj Terminus Underground Line 3 (Mumbai Metro)

The car depot will be located at either at Owale or Gaimukh shall be used for this extension of Metro Line 10, Line 11 and Line 4.

Stations[edit]

Line 10 connects Gaimukh in Thane to Shivaji Chowk in Mira road. The line covers four stations in 9.2 kilometers and will be running on elevated stations. The stations on this line include

Metro line 10 Map
Green Line 10
# Station Name Status Connections Layout
English Marathi
1 Shivaji Chowk (Mira Road) शिवाजी चौक (मिरा रोड) Approved  Red Line 9  (Under Construction) Elevated
2 Kashimira काशिमिरा Approved None Elevated
3 Varsova Char Phata वर्सोवा चार फाटा Approved None Elevated
4 Gaimukh Reti Bandar गायमुख रेती बंदर Approved None Elevated
5 Gaimukh गायमुख Approved  Green Line 4  (Under Construction) Elevated

This line is expected to cost Rs. 4,476 crore. This line will also connect Borivali, Mira-Bhayander, Thane, and rest of Mumbai.

References[edit]

  1. "Mira-Bhayander to be connected with Metro". The Times of India. Retrieved 25 February 2017.
  2. "Plans to extend metro stations to Bhayander may be implemented soon". dna. 25 February 2017. Retrieved 25 February 2017.
  3. "Dahisar metro extension work to begin in December 2017". Asian Age. 25 February 2017. Retrieved 25 February 2017.