Chennai Bypass

From Bharatpedia, an open encyclopedia

Chennai Bypass
Chennai Bypass.jpg
Chennai Bypass in red
Route information
Part of AH20
Maintained by National Highways Authority of India (NHAI)
Length32 km (20 mi)
Existed2010–present
Major junctions
FromPuzhal, Chennai district
ToPerungalathur, Chengalpattu district
Location
Major citiesMaduravoyal, Ambattur, Porur
Highway system

The Chennai Bypass is a full-access controlled expressway that interconnects four radial Indian National Highways around Chennai, India covering a distance of 32 km (20 mi) from Perungalathur (near Tambaram) on NH45 to puzhal on NH 5 via Maduravoyal at a cost of 4.05 billion. Constructed as part of the National Highway Development Project to decongest the city of transiting vehicles, the expressway interconnects NH45, NH4, NH205 and NH5. This expressway now forms a part of the circular transportation corridor.

Phases[edit]

Phase I[edit]

The first phase is 19 km (12 mi) six-lane fully access controlled carriageway from Perungalathur on the Grand Southern Trunk Road (NH 45) to Maduravoyal which lies on the ChennaiBangalore NH-4. A 3-tier trumpet interchange has also been constructed at the starting point at Irumbuliyur. It was inaugurated in April 2008. The Road runs through Thiruneermalai, Pammal, Anakaputhur, Tharapakkam, Kovur, Porur, Vanagaram to reach Maduravoyal.

Phase II[edit]

The second phase include extending the bypass by 13 km (8.1 mi) from Maduravoyal to Puzhal on the Chennai–Kolkata NH5 and four-laning it. It also includes two interchanges. A clover-leaf grade separator at Maduravoyal Junction and a trumpet interchange at puzhal where the bypass phase II ends.

Elevated Road[edit]

A 3.2 kilometres (2.0 mi) elevated six-lane corridor forms the part of the Phase II being executed currently. This elevated road cuts through the Industrial Estate in Ambattur. This corridor ends with a Road over bridge (RoB) crossing the ChennaiJolarpet railway line. The elevated corridor was completed in June 2009 at a cost of 1000 million.

Interchanges[edit]

Gallery[edit]

See also[edit]

References[edit]

  1. "PIB Foundation stone for Phase II of Chennai Bypass". Archived from the original on 28 September 2007.

Template:Rapid Transit in Chennai


Information red.svg
Scan the QR code to donate via UPI
Dear reader, We kindly request your support in maintaining the independence of Bharatpedia. As a non-profit organization, we rely heavily on small donations to sustain our operations and provide free access to reliable information to the world. We would greatly appreciate it if you could take a moment to consider donating to our cause, as it would greatly aid us in our mission. Your contribution would demonstrate the importance of reliable and trustworthy knowledge to you and the world. Thank you.

Please select an option below or scan the QR code to donate
₹150 ₹500 ₹1,000 ₹2,000 ₹5,000 ₹10,000 Other