Line 12 (Mumbai Metro)

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Mumbai Metro Orange Line 12 Extension
Maha Mumbai Metro.png
Overview
StatusApproved
OwnerMumbai Metropolitan Region Development Authority
Line number12
LocaleNavi Mumbai and Thane, Maharashtra, India
TerminiKalyan
Taloja
Stations18
Service
TypeMetro
SystemMumbai Metro
Operator(s)MMRDA
Technical
Line length20.75 km (12.89 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Route map
Template:MM Line 12

Orange Line 12 (Extension), or the Kalyan-Dombivli-Taloja Line is a proposed line of Mumbai Metro. It will be an extension of Orange Line. The total length of the line is planned to be 20.75 kilometres (12.89 mi), and the route will be completely elevated. The total cost of the construction is planned to be Rs 4,132 crore. MMRDA approved the Kalyan-Dombivli-Taloja Metro line. There will be 18 stations. This line will connect Navi Mumbai city with Kalyan-Dombivali city.[1]

Delhi Metro authority show red flag to Kalyan-Dombivli-Taloja Metro line.[2] However the construction work started on 01/11/2019 and is expected to be completed on 31/10/2024 with Revenue Opening Date (ROD) as 01/11/2024. MMRDA in its 138th Authority Meeting held on 26/08/2015 vide Resolution No. 1340 has granted In-principle Approval to develop growth Centre in Kalyan Taluka (area approx. 1089 Ha.) through implementation of Town Planning Schemes (TPS).

Stations[edit]

Line 12 will have 18 stations, all elevated.

Orange Line 12
# Station Name Status Connections Layout
English Marathi
1 Kalyan APMC कल्याण एपीएमसी Approved  Orange Line 5  (Under Construction) Elevated
2 Ganesh Nagar (Kalyan) गणेश नगर (कल्याण) Approved None Elevated
3 Pisavali Gaon पिसावली गाव Approved None Elevated
4 Golavali गोलावली Approved None Elevated
5 Dombivali MIDC डोंबिवली एमआयडीसी Approved None Elevated
6 Sagaon सागांव Approved None Elevated
7 Sonarpada सोनारपाडा Approved None Elevated
8 Manpada (Dombivali East) मानपाडा (डोंबिवली पूर्व) Approved None Elevated
9 Hedutane हेदुतने Approved None Elevated
10 Kolegaon कोलेगाव Approved None Elevated
11 Nilaje Gaon निळजे गाव Approved None Elevated
12 Vadavali वडवली Approved None Elevated
13 Bale बाळे Approved None Elevated
14 Waklan वाक्लन Approved None Elevated
15 Turbhe तुर्भे Approved None Elevated
16 Pisarve Depot पिसार्वे आगार Approved None Elevated
17 Pisarve पिसार्वे Approved None Elevated
18 Taloja तळोजा Approved Line 1 (Navi Mumbai Metro) Elevated

References[edit]

  1. "Mumbai Metro 12 Approved".
  2. "Delhi authority red-flags Kalyan-Taloja Metro line". dna. 2 December 2018.