Kannur International Airport: Difference between revisions

Created by Ajay Kumar
Last edited March 10, 2026
Created a new article
 
enhance section as per guidelines and added references
 
Line 1: Line 1:
{{short description|International Airport in Kannur, Kerala, India}}
{{short description|Airport serving Kannur, Kerala, India}}
{{Use Indian English|date=April 2016}}
{{Use Indian English|date=April 2025}}
{{Use dmy dates|date=May 2020}}
{{Use dmy dates|date=April 2025}}
{{Infobox airport
{{Infobox airport
| name                = Kannur International Airport
| name                = Kannur International Airport
| image              = Kannur-airport LOGO.png
| image              = Kannur International Airport Ltd Logo.svg
| image-width        = 150
| image-width        = 150
| image2              = ptb kannur.jpg
| image2              = Kannur airport long view.jpg
| image2-width        = 250
| image2-width        = 250
| IATA                = CNN
| IATA                = CNN
Line 16: Line 16:
| type                = Public
| type                = Public
| owner-oper          = Kannur International Airport Limited (KIAL)
| owner-oper          = Kannur International Airport Limited (KIAL)
| city-served        = [[Kannur]]
| city-served        = [[Kannur district|Kannur]]
| location            = [[Mattanur, Kerala|Mattanur]], [[Kannur district]], [[Kerala]], <br/>[[India]]
| location            = [[Mattanur]], [[Kannur district]], [[Kerala]], [[India]]
| opened              = {{start date and age|2018|12|09|df=y|p=n|br=n}}<ref>{{Cite web|url=https://indianexpress.com/photos/india-news/come-lets-fly-from-kannur-kerala-fourth-international-airport-to-open-on-dec-9-5388833/|title='Come..let's fly from Kannur': Kerala's fourth international airport to open on Dec 9|date=8 October 2018}}</ref>
| opened              = {{start date and age|2018|12|09|df=y|p=n|br=n}}<ref>{{Cite web|url=https://indianexpress.com/photos/india-news/come-lets-fly-from-kannur-kerala-fourth-international-airport-to-open-on-dec-9-5388833/|title='Come..let's fly from Kannur': Kerala's fourth international airport to open on Dec 9|date=8 October 2018}}</ref>
| hub                = [[Go First]]
| hub                = [[Air India Express]]
| focus_city          = *[[Air India Express]] 
| focus_city          = *[[IndiGo]]
*[[IndiGo]]
 
| built              = <!-- military airports -->
| built              = <!-- military airports -->
| commander          = <!-- military airports -->
| commander          = <!-- military airports -->
Line 29: Line 27:
| metric-elev        = yes
| metric-elev        = yes
| coordinates        = {{coord|11.92|N|75.55|E|type:airport|display=inline,title}}
| coordinates        = {{coord|11.92|N|75.55|E|type:airport|display=inline,title}}
| website            = {{url|kannurairport.aero}}
| website            = {{URL|kannurairport.aero}}
| pushpin_map        = India Kerala#India#Asia#Earth
| pushpin_map        = India Kerala#India
| pushpin_label      = '''CNN'''
| pushpin_label      = '''CNN'''
| r1-surface          = [[Asphalt concrete|Asphalt]]
| r1-surface          = [[Asphalt concrete|Asphalt]]
Line 42: Line 40:
| h1-surface          =  
| h1-surface          =  
| stat1-header        = Passengers
| stat1-header        = Passengers
| stat1-data          = 1,257,086 ({{increase}} 57.3%)
| stat1-data          = 1,344,021 ({{increase}} 14.1%)
| stat2-header        = Aircraft movements
| stat2-header        = Aircraft movements
| stat2-data          = 12,024 ({{increase}} 22.6%)
| stat2-data          = 11,555 ({{increase}} 5.3%)
| stat3-header        = Cargo tonnage
| stat3-header        = Cargo tonnage
| stat3-data          = 3,912 ({{increase}} 39.8%)
| stat3-data          = 4,151 ({{increase}} 25.6%)
| stat-year          = April 2022 - March 2023
| stat-year          = April 2024 - March 2025
| footnotes          = Source: [[Airports Authority of India|AAI]]<ref>{{cite web|title=Annexure III – Passenger Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k23Annex3.pdf|website=aai.aero|access-date=24 April 2023}}</ref><ref>{{cite web|title=Annexure II – Aircraft Movement Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k23Annex2.pdf|website=aai.aero|access-date=24 April 2023}}</ref><ref>{{cite web|title=Annexure IV – Freight Movement Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k23Annex4.pdf|website=aai.aero|access-date=24 April 2023}}</ref>
| footnotes          = Source: [[Airports Authority of India|AAI]]<ref>{{cite web|title=Annexure III – Passenger Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k25Annex3.pdf|website=aai.aero|access-date=28 April 2025}}</ref><ref>{{cite web|title=Annexure II – Aircraft Movement Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k25Annex2.pdf|website=aai.aero|access-date=28 April 2025}}</ref><ref>{{cite web|title=Annexure IV – Freight Movement Data|url=https://www.aai.aero/sites/default/files/traffic-news/Mar2k25Annex4.pdf|website=aai.aero|access-date=28 April 2025}}</ref>
}}
}}


'''Kannur International Airport''' {{Airport codes|CNN|VOKN}} is an [[international airport]] serving the city of [[Kannur]] and the [[North Malabar]] region of [[Kerala]], [[Kodagu district]] of [[Karnataka]] and [[Mahé district]] of [[Puducherry (union territory)|Puducherry]] in India. It is located {{cvt|28|km}} east of [[Kannur]], and {{cvt|24|km}} east of [[Thalassery]], near the municipality of [[Mattannur]] in Thalassery taluka of [[Kannur district]]. It is owned and operated by Kannur International Airport Limited (KIAL), a [[public–private partnership|public–private consortium]]. The airport opened for commercial operations on 9 December 2018.<ref name="manoramaonline1">{{cite web|url=https://english.manoramaonline.com/news/kerala/2018/12/09/kannur-airport-inauguration-first-flight-kerala.html|title=Kannur airport inauguration|website=OnManorama|language=en|access-date=2018-12-09}}</ref>
'''Kannur International Airport''' {{Airport codes|CNN|VOKN}} is an [[international airport]] serving the city of [[Kannur]], the [[Mahé district|Mahé district of Puducherry]] and the rest of northern [[Kerala]] in [[India]]. It is located in [[Mattanur]], {{cvt|28|km}} east of Kannur and {{cvt|24|km}} east of [[Thalassery]]. It is owned and operated by Kannur International Airport Limited (KIAL), a [[public–private partnership|public–private consortium]]. The airport opened for commercial operations on 9 December 2018.<ref name="manoramaonline1">{{cite web|url=https://english.manoramaonline.com/news/kerala/2018/12/09/kannur-airport-inauguration-first-flight-kerala.html|title=Kannur airport inauguration|website=OnManorama|language=en|access-date=2018-12-09}}</ref>


The airport served one million passengers in just nine months since commercial operations began.<ref>{{Cite web|url=https://www.thenewsminute.com/article/kannur-airport-has-served-one-million-passengers-nine-months-108717|title=Kannur airport has served one million passengers in nine months|date=11 September 2019|website=The News Minute}}</ref><ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/kozhikode/kial-records-1m-passengers-with-15-yr-old-singapore-girl/articleshow/71071775.cms|title=Kannur airport records 10 lakh passengers with 15-yr-old Singapore girl &#124; Kozhikode News - Times of India|website=The Times of India}}</ref> Amidst the [[COVID-19 pandemic]], the airport could maintain stable growth, and it achieved the milestone of two million passengers in the twenty-third month of operations in November 2020.<ref>{{Cite web|url=https://kannurairport.aero/two-million-passengers-kannur-international-airport|title=Two million Passengers at Kannur International Airport &#124; kannurairport|website=kannurairport.aero}}</ref>
The airport served one million passengers in just nine months since commercial operations began.<ref>{{Cite web|url=https://www.thenewsminute.com/article/kannur-airport-has-served-one-million-passengers-nine-months-108717|title=Kannur airport has served one million passengers in nine months|date=11 September 2019|website=The News Minute}}</ref><ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/kozhikode/kial-records-1m-passengers-with-15-yr-old-singapore-girl/articleshow/71071775.cms|title=Kannur airport records 10 lakh passengers with 15-yr-old Singapore girl &#124; Kozhikode News - Times of India|website=The Times of India|date=11 September 2019 }}</ref> Amidst the [[COVID-19 pandemic in India]], the airport could maintain stable growth, and it achieved the milestone of two million passengers in the twenty-third month of operations in November 2020.<ref>{{Cite web|url=https://kannurairport.aero/two-million-passengers-kannur-international-airport|title=Two million Passengers at Kannur International Airport &#124; kannurairport|website=kannurairport.aero}}</ref> Though several international airlines have reportedly shown interest in operating from Kannur, they are unable to operate regularly scheduled flights from Kannur International Airport as the airport lacks ''point of call'' status.<ref>{{Cite web |last=Sajit |first=C. p |date=7 December 2019 |title='Point of call' status still eludes KIAL |url=https://www.thehindu.com/news/national/kerala/point-of-call-status-still-eludes-kial/article30233335.ece |work=The Hindu |via=www.thehindu.com}}</ref><ref>{{Cite web |last=Nair |first=Vinod |date=19 December 2018 |title=SalamAir will fly to 19 cities next year |url=https://www.omanobserver.om/salamair-will-fly-to-19-cities-next-year/}}</ref><ref>{{Cite web |date=31 July 2016 |title=Airline companies queuing up for Kannur |url=https://english.mathrubhumi.com/news/kerala/airline-companies-queuing-up-for-kannur-english-news-1.1244498 |website=Mathrubhumi}}</ref><ref>{{Cite web |date=23 January 2019 |title=Gulf airlines blocked from flying to India's Kannur Int'l Airport |url=https://www.arabianbusiness.com/travel-hospitality/411885-gulf-airlines-blocked-from-flying-to-new-kerala-airport.}}</ref><ref>{{Cite web |date=1 September 2019 |title=Kerala government pushes for foreign airlines at Kannur airport |url=https://www.thehindu.com/news/national/kerala/govt-pushes-for-foreign-airlines-at-kannur-airport/article29311381.ece |work=The Hindu |via=www.thehindu.com}}</ref><ref>{{Cite web |last=Athira |first=Lakshmi |date=2025-03-19 |title=Kerala's Kannur airport reports Rs 742.77-crore loss over six years |url=https://www.newindianexpress.com/states/kerala/2025/Mar/19/keralas-kannur-airport-reports-rs-74277-crore-loss-over-six-years |access-date=2025-07-02 |website=The New Indian Express |language=en}}</ref><ref>{{Cite news |last=PTI |date=2024-10-11 |title=Centre yet to grant 'point of call' status to Kannur airport despite representations: Kerala govt |url=https://www.thehindu.com/news/national/kerala/centre-yet-to-grant-point-of-call-status-to-kannur-airport-despite-representations-kerala-govt/article68744247.ece |access-date=2025-07-02 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref> The airport handled 1.5 million passengers in 2025, marking the highest annual passenger traffic since it began operations. The previous record was 1.47 million passengers in 2019.<ref>{{Cite news |last=Bureau |first=The Hindu |date=2026-01-12 |title=Kannur airport recorded highest ever passenger traffic in 2025 |url=https://www.thehindu.com/news/national/kerala/kannur-airport-recorded-highest-ever-passenger-traffic-in-2025/article70502485.ece |access-date=2026-01-12 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>


The first aircraft to land was an [[Indian Air Force]] (IAF) aircraft that touched down at the airport on 29 February 2016.<ref>{{Cite web|url=https://www.timesnownews.com/business-economy/real-estate/article/kerala-gets-its-4th-international-airport-at-kannur-10-point-cheat-sheet/296082|title=Kerala gets its 4th international airport at Kannur: 10-point cheat-sheet|website=www.timesnownews.com}}</ref> The first trial passenger flight operation was conducted on 20 September 2018, using a [[Boeing 737 800|Boeing 737-800]] aircraft from [[Air India Express]].<ref>{{Cite web|url=https://www.thenewsminute.com/article/watch-first-trial-passenger-flight-lands-new-kannur-international-airport-88678|title=Watch: First trial passenger flight lands at new Kannur International Airport|date=20 September 2018|website=The News Minute}}</ref><ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/trial-landing-at-kannur-airport/article24993034.ece|title=Trial landing at Kannur airport|first=Mohamed|last=Nazeer|date=20 September 2018|via=www.thehindu.com}}</ref> On the inaugural day, 9 December 2018, an [[Air India Express]] flight IX 715 ([[Boeing 737 800|Boeing 737-800]]) took off to [[Abu Dhabi International Airport|Abu Dhabi]] at 10:13 (IST), becoming the first commercial passenger aircraft to depart from Kannur International Airport.<ref>{{cite web|url=https://indianexpress.com/article/india/kannur-international-airport-inauguration-live-updates-suresh-prabhu-air-india-express-pinarayi-vijayan-5485065/|title=Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced|date=2018-12-09|website=The Indian Express|language=en-IN|access-date=2018-12-09}}</ref><ref name="manoramaonline1"/><ref>{{cite web|url=https://english.mathrubhumi.com/news/kerala/first-flight-from-kannur-airport-flagged-off--1.3379442|title=First flight from Kannur airport flagged off|website=Mathrubhumi|access-date=2018-12-09}}</ref><ref name="flightstats1">{{cite web|url=https://www.flightstats.com/v2/flight-tracker/IX/715|title=IX715 - Air India Express IX 715 Flight Tracker|website=FlightStats|language=en|access-date=2018-12-09}}</ref> The airport was inaugurated by then [[Ministry of Civil Aviation (India)|Minister of Civil Aviation]], [[Suresh Prabhu]] and [[Chief minister of Kerala|Chief Minister of Kerala]], [[Pinarayi Vijayan]].
The first aircraft to land was an [[Indian Air Force]] (IAF) aircraft that touched down at the airport on 29 February 2016.<ref>{{Cite web|url=https://www.timesnownews.com/business-economy/real-estate/article/kerala-gets-its-4th-international-airport-at-kannur-10-point-cheat-sheet/296082|title=Kerala gets its 4th international airport at Kannur: 10-point cheat-sheet|website=www.timesnownews.com|date=8 October 2018 }}</ref> The first trial passenger flight operation was conducted on 20 September 2018, using a [[Boeing 737-800]] aircraft of [[Air India Express]].<ref>{{Cite web|url=https://www.thenewsminute.com/article/watch-first-trial-passenger-flight-lands-new-kannur-international-airport-88678|title=Watch: First trial passenger flight lands at new Kannur International Airport|date=20 September 2018|website=The News Minute}}</ref><ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/trial-landing-at-kannur-airport/article24993034.ece|title=Trial landing at Kannur airport|first=Mohamed|last=Nazeer|work=The Hindu |date=20 September 2018|via=www.thehindu.com}}</ref> On the inaugural day, 9 December 2018, an Air India Express flight IX 715, operated with a Boeing 737-800, took off to [[Abu Dhabi International Airport|Abu Dhabi]] at 10:13 (IST), becoming the first commercial passenger aircraft to depart from Kannur.<ref>{{cite web|url=https://indianexpress.com/article/india/kannur-international-airport-inauguration-live-updates-suresh-prabhu-air-india-express-pinarayi-vijayan-5485065/|title=Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced|date=2018-12-09|website=The Indian Express|language=en-IN|access-date=2018-12-09}}</ref><ref name="manoramaonline1"/><ref>{{cite web|url=https://english.mathrubhumi.com/news/kerala/first-flight-from-kannur-airport-flagged-off--1.3379442|title=First flight from Kannur airport flagged off|website=Mathrubhumi|date=9 December 2018 |access-date=2018-12-09}}</ref><ref name="flightstats1">{{cite web|url=https://www.flightstats.com/v2/flight-tracker/IX/715|title=IX715 - Air India Express IX 715 Flight Tracker|website=FlightStats|language=en|access-date=2018-12-09}}</ref> The airport was inaugurated by then [[Ministry of Civil Aviation (India)|Minister of Civil Aviation]], [[Suresh Prabhu]] and [[Chief minister of Kerala|Chief Minister of Kerala]], [[Pinarayi Vijayan]].
{{multiple image
{{multiple image
| align            = right
| align            = right
Line 63: Line 61:
| alt1              =  
| alt1              =  
| caption1          = Terminal building of the airport
| caption1          = Terminal building of the airport
| image2            = Kannur International Airport - during LGFC - VOF 2019 (14).jpg
| width2            = 220
| alt2              =
| caption2          = Terminal Interior
}}
}}


==History==
==History==
Kannur had an airstrip used for commercial aviation as early as 1935 when [[Air India|TATA]] airlines operated weekly flights between Bombay and Trivandrum – stopping at Goa and Cannanore.<ref>{{cite web|author=Sudhakaran, P|url=https://timesofindia.indiatimes.com/city/kozhikode/Kannur-flew-way-before-its-first-airport/articleshow/48951701.cms|title=Kannur flew, way before its first airport - Times of India|publisher=Timesofindia.indiatimes.com|access-date=2017-12-24|url-status=live|archive-url=https://web.archive.org/web/20170518022943/http://timesofindia.indiatimes.com/city/kozhikode/Kannur-flew-way-before-its-first-airport/articleshow/48951701.cms|archive-date=18 May 2017}}</ref> This airstrip was located within the [[Kannur Cantonment]] area at Fort Maidan.<ref>{{Cite web|date=2018-12-10|title=Kannur saw flight landings even before Independence|url=https://indianexpress.com/article/india/kannur-international-airport-flights-before-independence-tata-airlines-5486624/|access-date=2020-11-24|website=The Indian Express|language=en}}</ref> The operator started service to Kerala on 29 October 1935 but service did not last long.<ref>{{Cite news|others=PTI|date=2010-10-29|title=Kerala celebrates 75th anniversary of civil aviation|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/kerala/Kerala-celebrates-75th-anniversary-of-civil-aviation/article15796809.ece|access-date=2020-11-24|issn=0971-751X}}</ref>
[[Kannur]] had an airstrip used for commercial aviation as early as 1935 when [[Air India|TATA]] airlines operated weekly flights between [[Mumbai|Bombay]] and [[Thiruvananthapuram]] – stopping at Goa and Cannanore.<ref>{{cite web|author=Sudhakaran, P|url=https://timesofindia.indiatimes.com/city/kozhikode/Kannur-flew-way-before-its-first-airport/articleshow/48951701.cms|title=Kannur flew, way before its first airport - Times of India|work=The Times of India |date=14 September 2015 |publisher=Timesofindia.indiatimes.com|access-date=2017-12-24|url-status=live|archive-url=https://web.archive.org/web/20170518022943/http://timesofindia.indiatimes.com/city/kozhikode/Kannur-flew-way-before-its-first-airport/articleshow/48951701.cms|archive-date=18 May 2017}}</ref> This airstrip was located within the [[Kannur Cantonment]] area at Fort Maidan.<ref>{{Cite web|date=2018-12-10|title=Kannur saw flight landings even before Independence|url=https://indianexpress.com/article/india/kannur-international-airport-flights-before-independence-tata-airlines-5486624/|access-date=2020-11-24|website=The Indian Express|language=en}}</ref> The operator started service to Kerala on 29 October 1935 but service did not last long.<ref>{{Cite news|agency=PTI|date=2010-10-29|title=Kerala celebrates 75th anniversary of civil aviation|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/national/kerala/Kerala-celebrates-75th-anniversary-of-civil-aviation/article15796809.ece|access-date=2020-11-24|issn=0971-751X}}</ref>


The long-standing demand for a full-fledged airport was only conceptualized in 1997, when [[C. M. Ibrahim]] the then union minister of civil aviation, backed the proposal for an airport in the district. The vast extent of land at Moorkhanparamba near Mattannur was identified for the project a few months later following a hectic search for land for developing the proposed airport. The then Chief Minister of Kerala [[V. S. Achuthanandan]] laid the foundation stone for the airport at the project site marking the formal commencement of construction activities on 17 December 2010 at a function attended by the then Civil Aviation Minister [[Praful Patel]].<ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece|title=VS lays foundation stone for Kannur international airport|date=17 December 2010|via=www.thehindu.com}}</ref> Though the State government accorded sanction for the Kannur International Airport project in January 1998 and appointed [[Kerala Industrial Infrastructure Development Corporation]] (KINFRA) as the nodal agency for its implementation, it had to wait for a decade until it was finally approved by the Central government in January 2008. During the period, a private agency appointed by [[Kerala Industrial Infrastructure Development Corporation]] (KINFRA) to study techno-economic feasibility report submitted its report.<ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece|title=Kannur airport set to be a dream come true|date=21 November 2010|via=www.thehindu.com}}</ref> The earlier site proposed at Madayipara was dropped owing to ecological concerns. Two vast plateaus near Mattannur were identified for the airport, namely Moorkhanparamb and Velliyamparamb, with about 1300 acres and 800 acres of land to be acquired from each respectively.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece |title=Kannur airport set to be a dream come true |work=The Hindu|date=2010-11-21 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece |archive-date=7 January 2018}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-land-acquisition-process-on/article16141118.ece |title=Kannur airport: land acquisition process on - KERALA |work=The Hindu|date=2010-08-22 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-land-acquisition-process-on/article16141118.ece |archive-date=7 January 2018}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/land-for-airport-new-rates-sought/article2690968.ece |title=Land for airport: new rates sought - KERALA |work=The Hindu|date=2011-12-06 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/land-for-airport-new-rates-sought/article2690968.ece |archive-date=7 January 2018}}</ref><ref>{{Cite news|url=http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece|title=airport land map|date=2012-11-26|work=The Hindu|access-date=2017-12-08|archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece|archive-date=7 January 2018|url-status=live|language=en-IN|issn=0971-751X}}</ref>
The long-standing demand for a full-fledged airport was only conceptualized in 1997, when [[C. M. Ibrahim]], the then Union Minister of Civil Aviation, backed the proposal for an airport in the district. The vast extent of land at Moorkhanparamba near Mattannur was identified for the project a few months later following a hectic search for land for developing the proposed airport. The then Chief Minister of Kerala [[V. S. Achuthanandan]] laid the foundation stone for the airport at the project site marking the formal commencement of construction activities on 17 December 2010 at a function attended by the then Civil Aviation Minister [[Praful Patel]].<ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece|title=VS lays foundation stone for Kannur international airport|work=The Hindu |date=17 December 2010|via=www.thehindu.com}}</ref> Though the State government accorded sanction for the Kannur International Airport project in January 1998 and appointed [[Kerala Industrial Infrastructure Development Corporation]] (KINFRA) as the nodal agency for its implementation, it had to wait for a decade until it was finally approved by the Central government in January 2008. During the period, a private agency appointed by [[Kerala Industrial Infrastructure Development Corporation]] (KINFRA) to study techno-economic feasibility report submitted its report.<ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece|title=Kannur airport set to be a dream come true|work=The Hindu |date=21 November 2010|via=www.thehindu.com}}</ref> The earlier site proposed at Madayipara was dropped owing to ecological concerns. Two vast plateaus near Mattannur were identified for the airport, namely Moorkhanparamb and Velliyamparamb, with about 1300 acres and 800 acres of land to be acquired from each respectively.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece |title=Kannur airport set to be a dream come true |work=The Hindu|date=2010-11-21 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Kannur-airport-set-to-be-a-dream-come-true/article15701070.ece |archive-date=7 January 2018}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-land-acquisition-process-on/article16141118.ece |title=Kannur airport: land acquisition process on - KERALA |work=The Hindu|date=2010-08-22 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-land-acquisition-process-on/article16141118.ece |archive-date=7 January 2018}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/land-for-airport-new-rates-sought/article2690968.ece |title=Land for airport: new rates sought - KERALA |work=The Hindu|date=2011-12-06 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/land-for-airport-new-rates-sought/article2690968.ece |archive-date=7 January 2018}}</ref><ref>{{Cite news|url=http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece|title=airport land map|date=2012-11-26|work=The Hindu|access-date=2017-12-08|archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece|archive-date=7 January 2018|url-status=live|language=en-IN|issn=0971-751X}}</ref>


After a prolonged wait, the airport received in-principle approval from the [[Ministry of Civil Aviation (India)|Ministry of Civil Aviation]] and Union cabinet in January 2008.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Cabinet-clearance-for-Kannur-airport/article15145737.ece |title=Cabinet clearance for Kannur airport - KERALA |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Cabinet-clearance-for-Kannur-airport/article15145737.ece |archive-date=7 January 2018}}</ref> Land acquisition began in December 2008 after issuing notifications and fixing compensation.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-acquisition-for-Kannur-airport-from-December/article15303015.ece |title=Land acquisition for Kannur airport from December - KERALA |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-acquisition-for-Kannur-airport-from-December/article15303015.ece |archive-date=7 January 2018}}</ref> The public company Kannur International Airport Limited (KIAL), under the PPP model, was registered in October 2009.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-for-airport-by-January/article16488576.ece |title=Land for airport by January - KERALA |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-for-airport-by-January/article16488576.ece |archive-date=7 January 2018}}</ref> The foundation stone for the airport was laid on 17 December 2010 by then-Chief Minister [[V. S. Achuthanandan]].<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece |title=VS lays foundation stone for Kannur international airport |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece |archive-date=7 January 2018}}</ref>
After a prolonged wait, the airport received in-principle approval from the [[Ministry of Civil Aviation (India)|Ministry of Civil Aviation]] and Union cabinet in January 2008.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Cabinet-clearance-for-Kannur-airport/article15145737.ece |title=Cabinet clearance for Kannur airport - KERALA |work=The Hindu|date=17 January 2008 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Cabinet-clearance-for-Kannur-airport/article15145737.ece |archive-date=7 January 2018}}</ref> Land acquisition began in December 2008 after issuing notifications and fixing compensation.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-acquisition-for-Kannur-airport-from-December/article15303015.ece |title=Land acquisition for Kannur airport from December - KERALA |work=The Hindu|date=13 September 2008 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-acquisition-for-Kannur-airport-from-December/article15303015.ece |archive-date=7 January 2018}}</ref> The public company Kannur International Airport Limited (KIAL), under the [[Public-Private Partnership]] (PPP) model, was registered in October 2009.<ref>{{cite web |author=KERALA |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-for-airport-by-January/article16488576.ece |title=Land for airport by January - KERALA |work=The Hindu|date=3 October 2009 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Land-for-airport-by-January/article16488576.ece |archive-date=7 January 2018}}</ref> The foundation stone for the airport was laid on 17 December 2010 by then-Chief Minister [[V. S. Achuthanandan]].<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece |title=VS lays foundation stone for Kannur international airport |work=The Hindu|date=17 December 2010 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/VS-lays-foundation-stone-for-Kannur-international-airport/article15596787.ece |archive-date=7 January 2018}}</ref>
On 26 November 2013, KIAL and Larsen & Toubro Ltd are scheduled to sign a contract on construction work at the airport. In January 2014, The Kerala State Government Minister for Excise and Ports announced the Kerala State Government and AAI plan to sign an MoU on the equity structure of Kannur International Airport Limited.<ref>{{Cite web|url=https://centreforaviation.com/data/profiles/newairports/kannur-international-airport|title=Kannur International Airport|website=centreforaviation.com}}</ref>
On 26 November 2013, KIAL and Larsen & Toubro Ltd are scheduled to sign a contract on construction work at the airport. In January 2014, The Kerala State Government Minister for Excise and Ports announced the Kerala State Government and AAI plan to sign an MoU on the equity structure of Kannur International Airport Limited.<ref>{{Cite web|url=https://centreforaviation.com/data/profiles/newairports/kannur-international-airport|title=Kannur International Airport|website=centreforaviation.com}}</ref>


Construction work of the airport was inaugurated by Defence Minister and senior Congress leader [[A. K. Antony]] on 2 February 2014. On 29 February 2016, The first trial flight was landed and Chief Minister [[Oommen Chandy]] Flag off for the inauguration of Runway.<ref>{{Cite web|url=https://www.ndtv.com/south/1st-trial-flight-lands-in-north-kerala-oommen-chandy-says-it-will-boost-development-1282670|title=1st Trial Flight Lands In North Kerala, Oommen Chandy Says 'It Will Boost Development'|website=NDTV.com}}</ref>
Construction work at the airport was inaugurated by Defence Minister and senior Congress leader [[A. K. Antony]] on 2 February 2014. On 29 February 2016, The first trial flight was landed and Chief Minister [[Oommen Chandy]] Flag off for the inauguration of Runway.<ref>{{Cite web|url=https://www.ndtv.com/south/1st-trial-flight-lands-in-north-kerala-oommen-chandy-says-it-will-boost-development-1282670|title=1st Trial Flight Lands In North Kerala, Oommen Chandy Says 'It Will Boost Development'|website=NDTV.com}}</ref>
 
Kannur International Airport commenced operations on 9 December 2018.<ref name="KIAL Inaug1">{{cite web |url=https://indianexpress.com/article/india/kannur-international-airport-inauguration-live-updates-suresh-prabhu-air-india-express-pinarayi-vijayan-5485065/ | title= Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced |work= The Indian Express| date= 9 December 2018 | access-date=2018-12-09}}</ref> The first commercial aircraft to operate out of the airport was [[Air India Express]] IX 715 ([[Boeing 737 Next Generation|Boeing 737-800]]) to [[Abu Dhabi International Airport|Abu Dhabi]], which took off at 10:13 (IST) on the same day.<ref name="KIAL Inaug2">{{cite web |url=https://english.mathrubhumi.com/news/kerala/first-flight-from-kannur-airport-flagged-off--1.3379442 | title= First flight from Kannur airport flagged off | date= 9 December 2018 |publisher= Mathrubhumi English| access-date=2018-12-09}}</ref><ref name="flightstats1"/> The flight was jointly flagged off by the [[List of chief ministers of Kerala|Chief Minister of Kerala]], [[Pinarayi Vijayan]] and [[Ministry of Civil Aviation (India)|Union Minister for Civil Aviation]], [[Suresh Prabhu]].<ref name="KIAL Inaug2"/>


Kannur International Airport commenced operations on 9 December 2018.<ref name="KIAL Inaug1">{{cite web |url=https://indianexpress.com/article/india/kannur-international-airport-inauguration-live-updates-suresh-prabhu-air-india-express-pinarayi-vijayan-5485065/ | title= Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced |work= The Indian Express| access-date=2018-12-09}}</ref> The first commercial aircraft to operate out of the airport was [[Air India Express]] IX 715 ([[Boeing 737 Next Generation|Boeing 737-800]]) to [[Abu Dhabi International Airport|Abu Dhabi]], which took off at 10:13 (IST) on the same day.<ref name="KIAL Inaug2">{{cite web |url=https://english.mathrubhumi.com/news/kerala/first-flight-from-kannur-airport-flagged-off--1.3379442 | title= First flight from Kannur airport flagged off |publisher= Mathrubhumi English| access-date=2018-12-09}}</ref><ref name="flightstats1"/> The flight was jointly flagged off by the [[List of chief ministers of Kerala|Chief Minister of Kerala]], [[Pinarayi Vijayan]] and [[Ministry of Civil Aviation (India)|Union Minister for Civil Aviation]], [[Suresh Prabhu]].<ref name="KIAL Inaug2"/>
Aircraft of several foreign airlines touched down for the first time at Kannur International Airport in June 2020 as part of the repatriation flights arranged owing to the COVID-19.<ref>{{Cite web|url=https://travel.economictimes.indiatimes.com/news//|title=- ET TravelWorld|website=ETTravelWorld.com}}</ref><ref>{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Writeup%20on%20repatriation%20flights%20as%20on%202%20September%202020%20%281%29.pdf.|title=Kannur Airport operates 300 international flights and brings back 50000 Pravasis during covid pandemic.}}</ref>
[[Widebody aircraft]] also landed for the first time in June.<ref>{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Write-up%20on%20repatriation%20flights%20as%20on%2028%20August%202020.pdf.|title=Kannur Airport's Role in Bringign Back Pravasis}}</ref> [[Airbus A330-200]] of [[Kuwait Airways]], was the first foreign airline and also the first widebody aircraft that landed at Kannur.<ref name="auto2">{{Cite web|url=https://www.mathrubhumi.com/gulf/kuwait/kuwait-airways-wide-body-aircraft-landed-in-kannur-international-airport-for-the-first-time-1.4822697|title=കണ്ണൂര്‍ വിമാനത്താവളത്തില്‍ ആദ്യമായി വിദേശവിമാനം; ചരിത്രത്തിന്റെ ഭാഗമായി കണ്ണൂര്‍ സ്വദേശിയും|website=Mathrubhumi|access-date=6 January 2021|archive-date=23 September 2020|archive-url=https://web.archive.org/web/20200923152410/https://www.mathrubhumi.com/gulf/kuwait/kuwait-airways-wide-body-aircraft-landed-in-kannur-international-airport-for-the-first-time-1.4822697|url-status=dead}}</ref> The aircraft of Kuwait Airways,<ref name="auto2"/><ref name="auto1">{{Cite web|url=https://english.mathrubhumi.com/news/nri/india-kuwait-temporary-flight-services-to-be-operational-from-august-10-1.4958327|title=India-Kuwait temporary flight services to be operational from August 10|first=P. C.|last=Hareesh|website=Mathrubhumi|date=6 August 2020 }}</ref> [[Flydubai]],<ref>{{Cite web|url=https://english.mathrubhumi.com/news/kerala/fly-dubai-flight-carrying-expats-lands-in-kannur-1.4829615|title=Fly Dubai flight carrying expats lands in Kannur|website=Mathrubhumi|access-date=18 August 2020|archive-date=5 December 2020|archive-url=https://web.archive.org/web/20201205002122/https://english.mathrubhumi.com/news/kerala/fly-dubai-flight-carrying-expats-lands-in-kannur-1.4829615|url-status=dead}}</ref> [[Jazeera Airways]],<ref name="auto1"/> [[SalamAir]],<ref>{{Cite web|url=https://www.thearabianstories.com/2020/06/11/salamairs-third-charter-flight-by-kmcc-takes-off-from-muscat-to-kannur/|title=SalamAir's third charter flight by KMCC takes-off from Muscat to Kannur|date=11 June 2020}}</ref> [[Gulf Air]],<ref name="auto">{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Write-up%20on%20repatriation%20flights%20as%20on%202%20September%202020%20%282%29.pdf|title=Kannur Airport's Role in Bringing Back Pravasis}}</ref> [[Air Arabia]],<ref>{{Cite web|url=https://epaper.deepika.com/c/52792697/|title=Clipping of deepikanewspaper - Deepika Kannur|website=epaper.deepika.com|access-date=7 December 2020|archive-date=5 April 2023|archive-url=https://web.archive.org/web/20230405232919/https://epaper.deepika.com/c/52792697/|url-status=dead}}</ref> [[Etihad Airways]],<ref>{{Cite web|url=https://www.manoramaonline.com/global-malayali/gulf/2020/06/27/etihad-flight-arrives-in-kannur-airport.html|title=ഇത്തിഹാദിന്റെ ആദ്യ വിമാനത്തിന് കണ്ണൂരിൽ ഊഷ്മള വരവേൽപ്|website=ManoramaOnline|language=ml}}</ref> [[Saudia]],<ref name="auto"/> and [[Oman Air]]<ref>{{Cite web|url=https://www.omanobserver.om/oman-air-touches-down-at-kannur-international-airport/|title=Oman Air touches down at Kannur International Airport|first=Kabeer|last=Yousuf|date=30 August 2020}}</ref> operated to and from Kannur during June–August 2020 as repatriation/chartered flights.
Aircraft of several foreign airlines touched down for the first time at Kannur international airport in June 2020 as part of the repatriation flights arranged owing to the COVID-19.<ref>{{Cite web|url=https://travel.economictimes.indiatimes.com/news//|title=- ET TravelWorld|website=ETTravelWorld.com}}</ref><ref>{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Writeup%20on%20repatriation%20flights%20as%20on%202%20September%202020%20%281%29.pdf.|title=Kannur Airport operates 300 international flights and brings back 50000 Pravasis during covid pandemic.}}</ref>
[[Widebody aircraft]] also landed for the first time in June.<ref>{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Write-up%20on%20repatriation%20flights%20as%20on%2028%20August%202020.pdf.|title=Kannur Airport's Role in Bringign Back Pravasis}}</ref> [[Airbus A330-200]] of [[Kuwait Airways]], was the first foreign airline and also the first widebody aircraft that landed at Kannur.<ref name="auto2">{{Cite web|url=https://www.mathrubhumi.com/gulf/kuwait/kuwait-airways-wide-body-aircraft-landed-in-kannur-international-airport-for-the-first-time-1.4822697|title=കണ്ണൂര്‍ വിമാനത്താവളത്തില്‍ ആദ്യമായി വിദേശവിമാനം; ചരിത്രത്തിന്റെ ഭാഗമായി കണ്ണൂര്‍ സ്വദേശിയും|website=Mathrubhumi}}</ref> The aircraft of Kuwait Airways,<ref name="auto2"/><ref name="auto1">{{Cite web|url=https://english.mathrubhumi.com/news/nri/india-kuwait-temporary-flight-services-to-be-operational-from-august-10-1.4958327|title=India-Kuwait temporary flight services to be operational from August 10|first=P. C.|last=Hareesh|website=Mathrubhumi}}</ref>[[Fly Dubai]],<ref>{{Cite web|url=https://english.mathrubhumi.com/news/kerala/fly-dubai-flight-carrying-expats-lands-in-kannur-1.4829615|title=Fly Dubai flight carrying expats lands in Kannur|website=Mathrubhumi}}</ref>[[Jazeera Airways]],<ref name="auto1"/>[[Salam Air]],<ref>{{Cite web|url=https://www.thearabianstories.com/2020/06/11/salamairs-third-charter-flight-by-kmcc-takes-off-from-muscat-to-kannur/|title=SalamAir's third charter flight by KMCC takes-off from Muscat to Kannur|date=11 June 2020}}</ref>[[Gulf Air]],<ref name="auto">{{Cite web|url=https://www.kannurairport.aero/sites/default/files/inline-files/Write-up%20on%20repatriation%20flights%20as%20on%202%20September%202020%20%282%29.pdf|title=Kannur Airport's Role in Bringing Back Pravasis}}</ref>[[Air Arabia]],<ref>{{Cite web|url=https://epaper.deepika.com/c/52792697/|title=Clipping of deepikanewspaper - Deepika Kannur|website=epaper.deepika.com}}</ref> [[Etihad Airways]],<ref>{{Cite web|url=https://www.manoramaonline.com/global-malayali/gulf/2020/06/27/etihad-flight-arrives-in-kannur-airport.html|title=ഇത്തിഹാദിന്റെ ആദ്യ വിമാനത്തിന് കണ്ണൂരിൽ ഊഷ്മള വരവേൽപ്|website=ManoramaOnline|language=ml}}</ref>[[Saudia]],<ref name="auto"/> and [[Oman Air]]<ref>{{Cite web|url=https://www.omanobserver.om/oman-air-touches-down-at-kannur-international-airport/|title=Oman Air touches down at Kannur International Airport|first=Kabeer|last=Yousuf|date=30 August 2020}}</ref> operated to and from Kannur during June–August 2020 as repatriation/chartered flights.
Though several international airlines have reportedly shown interest in operating from Kannur, they are unable to operate regularly scheduled flights from Kannur airport as the airport lacks  ‘point of call’ status.<ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/point-of-call-status-still-eludes-kial/article30233335.ece|title='Point of call' status still eludes KIAL|first=C. p|last=Sajit|date=7 December 2019|via=www.thehindu.com}}</ref><ref>{{Cite web|url=https://www.omanobserver.om/salamair-will-fly-to-19-cities-next-year/|title=SalamAir will fly to 19 cities next year|first=Vinod|last=Nair|date=19 December 2018}}</ref><ref>{{Cite web|url=https://english.mathrubhumi.com/news/kerala/airline-companies-queuing-up-for-kannur-english-news-1.1244498|title=Airline companies queuing up for Kannur|website=Mathrubhumi}}</ref><ref>{{Cite web|url=https://www.arabianbusiness.com/travel-hospitality/411885-gulf-airlines-blocked-from-flying-to-new-kerala-airport.|title=Gulf airlines blocked from flying to India's Kannur Int'l Airport}}</ref><ref>{{Cite web|url=https://www.thehindu.com/news/national/kerala/govt-pushes-for-foreign-airlines-at-kannur-airport/article29311381.ece|title=Kerala government pushes for foreign airlines at Kannur airport|date=1 September 2019|via=www.thehindu.com}}</ref>


==Construction==
==Construction==
Line 86: Line 87:
In July 2011, the [[Oommen Chandy]] government decided to make Airports Authority of India a consultant tasked with preparing a revised techno-economic feasibility report and a new master plan and design.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airports-first-stage-by-2014/article2229094.ece |title=Kannur airport's first stage by 2014 - KERALA |work=The Hindu|date=2011-07-15 |access-date=2017-12-24}}</ref> As the Airports Authority of India failed to submit the report in time, the consultancy was canceled and [[Cochin International Airport]] (CIAL) was entrusted to prepare the detailed project report, but the floating of tenders for construction was further delayed as experts found several technical flaws in the design prepared by CIAL.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/cial-to-prepare-project-report-for-kannur-airport/article2709404.ece |title=CIAL to prepare project report for Kannur airport |work=The Hindu|date=2011-12-12 |access-date=2017-12-24}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-project-to-be-delayed/article3571521.ece |title=Kannur airport project to be delayed - NATIONAL |work=The Hindu|date=2012-06-26 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140117054049/http://www.thehindu.com/todays-paper/tp-national/kannur-airport-project-to-be-delayed/article3571521.ece |archive-date=17 January 2014}}</ref>
In July 2011, the [[Oommen Chandy]] government decided to make Airports Authority of India a consultant tasked with preparing a revised techno-economic feasibility report and a new master plan and design.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airports-first-stage-by-2014/article2229094.ece |title=Kannur airport's first stage by 2014 - KERALA |work=The Hindu|date=2011-07-15 |access-date=2017-12-24}}</ref> As the Airports Authority of India failed to submit the report in time, the consultancy was canceled and [[Cochin International Airport]] (CIAL) was entrusted to prepare the detailed project report, but the floating of tenders for construction was further delayed as experts found several technical flaws in the design prepared by CIAL.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/cial-to-prepare-project-report-for-kannur-airport/article2709404.ece |title=CIAL to prepare project report for Kannur airport |work=The Hindu|date=2011-12-12 |access-date=2017-12-24}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-project-to-be-delayed/article3571521.ece |title=Kannur airport project to be delayed - NATIONAL |work=The Hindu|date=2012-06-26 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140117054049/http://www.thehindu.com/todays-paper/tp-national/kannur-airport-project-to-be-delayed/article3571521.ece |archive-date=17 January 2014}}</ref>


Land acquired by the government under KINFRA was transferred to KIAL earlier in February 2012.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-pact-today/article2867596.ece |title=Kannur airport: Pact today - KERALA - the Hindu |website=[[The Hindu]] |access-date=2018-01-07 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-pact-today/article2867596.ece |archive-date=7 January 2018}}></ref> In August 2012, Mumbai based company STUP Consultants Pvt Ltd. was made consultant to review the revised report by CIAL and to assist KIAL in other aspects of the project, but the agreement was canceled within two weeks as it was found that the company had been blacklisted in other states.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-signs-pact-with-stup-for-consultancy-services/article3805854.ece |title=KIAL signs pact with STUP for consultancy services - KERALA |work=The Hindu|date=2012-08-22 |access-date=2017-12-24}}</ref><ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-consultancy-pact-with-stup-cancelled/article3868854.ece |title=Kannur airport: consultancy pact with STUP cancelled - NATIONAL |work=The Hindu|date=2012-09-07 |access-date=2017-12-24}}</ref> Fresh bids were solicited and Hong Kong-based AECOM Asia was awarded the consultancy.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-to-invite-fresh-bids/article3891228.ece |title=KIAL to invite fresh bids - KERALA |work=The Hindu|date=2012-09-13 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213211307/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-to-invite-fresh-bids/article3891228.ece |archive-date=13 December 2017}}</ref><ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/work-on-kannur-airport-to-begin-soon/article4104554.ece |title=Work on Kannur airport to begin soon - KERALA |work=The Hindu|date=2012-11-17 |access-date=2017-12-24}}</ref> The project office was inaugurated at Mattannur in December 2012.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-in-3-years-chandy/article4177346.ece |title=Kannur airport in 3 years: Chandy - KERALA |work=The Hindu|date=2012-12-08 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140831193045/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-in-3-years-chandy/article4177346.ece |archive-date=31 August 2014}}</ref>
Land acquired by the government under KINFRA was transferred to KIAL earlier in February 2012.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-pact-today/article2867596.ece |title=Kannur airport: Pact today - KERALA - the Hindu |website=[[The Hindu]] |date=6 February 2012 |access-date=2018-01-07 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-pact-today/article2867596.ece |archive-date=7 January 2018}}></ref> In August 2012, Mumbai based company STUP Consultants Pvt Ltd. was made consultant to review the revised report by CIAL and to assist KIAL in other aspects of the project, but the agreement was canceled within two weeks as it was found that the company had been blacklisted in other states.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-signs-pact-with-stup-for-consultancy-services/article3805854.ece |title=KIAL signs pact with STUP for consultancy services - KERALA |work=The Hindu|date=2012-08-22 |access-date=2017-12-24}}</ref><ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-consultancy-pact-with-stup-cancelled/article3868854.ece |title=Kannur airport: consultancy pact with STUP cancelled - NATIONAL |work=The Hindu|date=2012-09-07 |access-date=2017-12-24}}</ref> Fresh bids were solicited and Hong Kong-based AECOM Asia was awarded the consultancy.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-to-invite-fresh-bids/article3891228.ece |title=KIAL to invite fresh bids - KERALA |work=The Hindu|date=2012-09-13 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213211307/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-to-invite-fresh-bids/article3891228.ece |archive-date=13 December 2017}}</ref><ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/work-on-kannur-airport-to-begin-soon/article4104554.ece |title=Work on Kannur airport to begin soon - KERALA |work=The Hindu|date=2012-11-17 |access-date=2017-12-24}}</ref> The project office was inaugurated at Mattannur in December 2012.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-in-3-years-chandy/article4177346.ece |title=Kannur airport in 3 years: Chandy - KERALA |work=The Hindu|date=2012-12-08 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140831193045/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kannur-airport-in-3-years-chandy/article4177346.ece |archive-date=31 August 2014}}</ref>


===EPC-I & EPC-II===
===EPC-I & EPC-II===


It was decided to build the airport in two stages of [[engineering, procurement, and construction]] (EPC). The first stage, EPC-I included complete earthwork, runway, taxiway, apron, ground lighting and associated infrastructure such as perimeter and operational walls.
It was decided to build the airport in two stages of [[engineering, procurement, and construction]] (EPC). The first stage, EPC-I included complete earthwork, runway, taxiway, apron, ground lighting and associated infrastructure such as perimeter and operational walls.{{citation needed|date=April 2025}}


The second stage, EPC-II, involved the integrated terminal building, air traffic control tower, administrative and technical blocks, and facilities in the buildings such as aerobridges, escalators, elevators and counters.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-work-on-epc-ii-in-full-swing/article5037052.ece |title=Kannur airport: work on EPC II in full swing - NATIONAL |work=The Hindu|date=2013-08-19 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830231140/http://www.thehindu.com/todays-paper/tp-national/kannur-airport-work-on-epc-ii-in-full-swing/article5037052.ece |archive-date=30 August 2014}}</ref> Infrastructure and engineering conglomerate Larsen & Toubro (L&T) was awarded work for EPC-I on 27 November 2013, after inviting bids.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-lt-ink-rs694crore-pact/article5395733.ece |title=KIAL, L&T ink Rs. 694-crore pact - KERALA |work=The Hindu|date=2013-11-27 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830155023/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-lt-ink-rs694crore-pact/article5395733.ece |archive-date=30 August 2014}}</ref> Airport work was flagged off by the then Defense Minister [[A.K. Antony]] at a public function in Mattannur on 2 February 2014.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/antony-flags-off-kannur-airport-works/article5646298.ece |title=Antony flags off Kannur airport works |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140220202419/http://www.thehindu.com/news/national/kerala/antony-flags-off-kannur-airport-works/article5646298.ece |archive-date=20 February 2014}}</ref> L&T also won the tender for EPC-II works including the construction of the passenger terminal building (PTB) on 25 June 2014.<ref name="thehindu3">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/tender-approved-for-kannur-airport/article6150096.ece |title=Tender approved for Kannur airport - KERALA |work=The Hindu|date=2014-06-26 |access-date=2017-12-24}}</ref> A huge amount of earthwork was carried out at the site including the cutting and filling of a total {{convert|2340000|m3|cuyd}} of land at a maximum rate of {{convert|70000|m3|cuyd}} per day.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-runway-work-on-course/article6117338.ece |title=Kannur airport runway work on course |work=The Hindu|date=2014-06-16 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213201922/http://www.thehindu.com/news/national/kerala/kannur-airport-runway-work-on-course/article6117338.ece |archive-date=13 December 2017}}</ref> About 50% of the land works and foundation and piling work for constructing the PTB and air traffic control tower were completed by March 2015.<ref name="thehindu4">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/hectic-pace-to-kannur-airport-work/article7034241.ece |title=Hectic pace to Kannur airport work - KERALA |work=The Hindu|date=2015-03-26 |access-date=2017-12-24}}</ref> By August 2015, about 60% of the runway was completed. Steps were initiated to procure lifts, a [[baggage handling system]], passenger boarding bridges, and the four Airfield Crash Fire Tenders.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-in-takeoff-mode/article7542837.ece |title=Kannur airport in take-off mode - NATIONAL |work=The Hindu|access-date=2017-12-24}}</ref> About 70% of the work on the runway, apron and associated work, and 52% of the PTB and allied work was completed by December 2015.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/first-test-flight-to-kannur-airport-deferred/article7964001.ece |title=First test flight to Kannur airport deferred - KERALA |work=The Hindu|access-date=2017-12-24}}</ref> Works for a {{convert|28000|m2|yd2}} fuel farm also began the same month.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/fuel-farm-work-begins-at-kannur-airport-site/article8024003.ece |title=Fuel farm work begins at Kannur airport site |work=The Hindu|access-date=2017-12-24}}</ref> The then Kerala Airports Minister K. Babu ruled out the popular demand to extend the runway to {{convert|4000|m|yd}}.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/Minister-rules-out-Kannur-airport-runway-extension/article13982020.ece |title=Minister rules out Kannur airport runway extension |work=The Hindu|access-date=2017-12-24}}</ref> Meanwhile, the third phase of land acquisition involving about 785 acres on Velliyamparmb, which began in 2011, had been progressing at a very slow pace and only 612 acres were acquired in five years.<ref name="thehindu5">{{cite web |url=http://www.thehindu.com/news/cities/Thiruvananthapuram/first-flight-to-kannur-on-feb-29/article8246793.ece |title=First flight to Kannur on 29 Feb. |work=The Hindu|date=2016-02-17 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213211609/http://www.thehindu.com/news/cities/Thiruvananthapuram/first-flight-to-kannur-on-feb-29/article8246793.ece |archive-date=13 December 2017}}</ref> The late decision to acquire more land for a runway extension from {{convert|3050|m|yd}} to {{convert|3400|m|yd}} on the western side, in the finishing stages of the project, triggered protests from residents.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/allparty-meet-on-kial-land-survey/article7564250.ece |title=All-party meet on KIAL land survey - KERALA |work=The Hindu|access-date=2017-12-24}}</ref>
The second stage, EPC-II, involved the integrated terminal building, air traffic control tower, administrative and technical blocks, and facilities in the buildings such as aerobridges, escalators, elevators and counters.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-work-on-epc-ii-in-full-swing/article5037052.ece |title=Kannur airport: work on EPC II in full swing - NATIONAL |work=The Hindu|date=2013-08-19 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830231140/http://www.thehindu.com/todays-paper/tp-national/kannur-airport-work-on-epc-ii-in-full-swing/article5037052.ece |archive-date=30 August 2014}}</ref> Infrastructure and engineering conglomerate Larsen & Toubro (L&T) was awarded work for EPC-I on 27 November 2013, after inviting bids.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-lt-ink-rs694crore-pact/article5395733.ece |title=KIAL, L&T ink Rs. 694-crore pact - KERALA |work=The Hindu|date=2013-11-27 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830155023/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/kial-lt-ink-rs694crore-pact/article5395733.ece |archive-date=30 August 2014}}</ref> Airport work was flagged off by the then Defense Minister [[A.K. Antony]] at a public function in Mattannur on 2 February 2014.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/antony-flags-off-kannur-airport-works/article5646298.ece |title=Antony flags off Kannur airport works |work=The Hindu|date=2 February 2014 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140220202419/http://www.thehindu.com/news/national/kerala/antony-flags-off-kannur-airport-works/article5646298.ece |archive-date=20 February 2014}}</ref> L&T also won the tender for EPC-II works including the construction of the passenger terminal building (PTB) on 25 June 2014.<ref name="thehindu3">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/tender-approved-for-kannur-airport/article6150096.ece |title=Tender approved for Kannur airport - KERALA |work=The Hindu|date=2014-06-26 |access-date=2017-12-24}}</ref> A huge amount of earthwork was carried out at the site including the cutting and filling of a total {{convert|2340000|m3|cuyd}} of land at a maximum rate of {{convert|70000|m3|cuyd}} per day.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-runway-work-on-course/article6117338.ece |title=Kannur airport runway work on course |work=The Hindu|date=2014-06-16 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213201922/http://www.thehindu.com/news/national/kerala/kannur-airport-runway-work-on-course/article6117338.ece |archive-date=13 December 2017}}</ref> About 50% of the land works and foundation and piling work for constructing the PTB and air traffic control tower were completed by March 2015.<ref name="thehindu4">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/hectic-pace-to-kannur-airport-work/article7034241.ece |title=Hectic pace to Kannur airport work - KERALA |work=The Hindu|date=2015-03-26 |access-date=2017-12-24}}</ref> By August 2015, about 60% of the runway was completed. Steps were initiated to procure lifts, a [[baggage handling system]], passenger boarding bridges, and the four Airfield Crash Fire Tenders.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/kannur-airport-in-takeoff-mode/article7542837.ece |title=Kannur airport in take-off mode - NATIONAL |work=The Hindu|date=14 August 2015 |access-date=2017-12-24}}</ref> About 70% of the work on the runway, apron and associated work, and 52% of the PTB and allied work was completed by December 2015.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/first-test-flight-to-kannur-airport-deferred/article7964001.ece |title=First test flight to Kannur airport deferred - KERALA |work=The Hindu|date=8 December 2015 |access-date=2017-12-24}}</ref> Works for a {{convert|28000|m2|yd2}} fuel farm also began the same month.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/fuel-farm-work-begins-at-kannur-airport-site/article8024003.ece |title=Fuel farm work begins at Kannur airport site |work=The Hindu|date=23 December 2015 |access-date=2017-12-24}}</ref> The then Kerala Airports Minister K. Babu ruled out the popular demand to extend the runway to {{convert|4000|m|yd}}.<ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/Minister-rules-out-Kannur-airport-runway-extension/article13982020.ece |title=Minister rules out Kannur airport runway extension |work=The Hindu|date=4 January 2016 |access-date=2017-12-24}}</ref> Meanwhile, the third phase of land acquisition involving about 785 acres on Velliyamparmb, which began in 2011, had been progressing at a very slow pace and only 612 acres were acquired in five years.<ref name="thehindu5">{{cite web |url=http://www.thehindu.com/news/cities/Thiruvananthapuram/first-flight-to-kannur-on-feb-29/article8246793.ece |title=First flight to Kannur on 29 Feb. |work=The Hindu|date=2016-02-17 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171213211609/http://www.thehindu.com/news/cities/Thiruvananthapuram/first-flight-to-kannur-on-feb-29/article8246793.ece |archive-date=13 December 2017}}</ref> The late decision to acquire more land for a runway extension from {{convert|3050|m|yd}} to {{convert|3400|m|yd}} on the western side, in the finishing stages of the project, triggered protests from residents.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/allparty-meet-on-kial-land-survey/article7564250.ece |title=All-party meet on KIAL land survey - KERALA |work=The Hindu|date=20 August 2015 |access-date=2017-12-24}}</ref>
{{multiple image
{{multiple image
| align            = right
| align            = right
Line 108: Line 109:
===Phase I & Phase II===
===Phase I & Phase II===
{{multiple image
{{multiple image
| align     = right
| align             = right
| direction = vertical
| direction         = vertical
| image1   =  
| image1           =  
| width1   = 220
| width1           = 220
| alt1     =  
| alt1             =  
| caption1 = ATC TOWER AND PASSENGER TERMINAL IN 2018}}
| caption1         = ATC TOWER AND PASSENGER TERMINAL IN 2018
}}


The Phase I expansion period is from 2016–17 to 2025–26. It includes a {{convert|4000|m|yd}} runway extension, a full-length taxiway, commissioning of a fuel farm, an aviation academy etc. and developing city side facilities. Works for the Phase-I expansion are already progressing. A cargo terminal and cargo complex which was initially in Phase-II has been shifted to Phase I and is under construction. The Phase II expansion will happen from 2026–27 to 2045–46. It includes another runway and a dedicated domestic terminal at Veliamparamba, and a long flyover to link it with Moorkhanparamba.<ref name="thehindu5"/><ref name="ashamsakal1">{{cite web |url=http://ashamsakal.com/kial_masterplanHRz.jpg |title=Archived copy |access-date=2016-06-09 |url-status=live |archive-url=https://web.archive.org/web/20160403163020/http://ashamsakal.com/kial_masterplanHRz.jpg |archive-date=3 April 2016}}</ref><ref name="thehindu2">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/With-mega-runway-Kannur-airport-in-top-four/article14632430.ece |title=With mega runway, Kannur airport in top four - NATIONAL |work=The Hindu|access-date=2017-12-24}}</ref><ref>{{cite web |url=http://english.keralakaumudi.com/news/kerala/kannur-airport-runway-ready-final-touch-up-in-progress-1.1860682 |title=Kannur airport: Runway ready, final touch-up in progress &#124; politics &#124; Kannur Airport |publisher=English.keralakaumudi.com |date=2017-04-10 |access-date=2017-12-24}}{{dead link|date=June 2019|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece |title=Airport consultant reviewing report |work=The Hindu|date=2012-11-26 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece |archive-date=7 January 2018}}</ref>
The Phase I expansion period is from 2016–17 to 2025–26. It includes a {{convert|4000|m|yd}} runway extension, a full-length taxiway, commissioning of a fuel farm, an aviation academy etc. and developing city side facilities. Works for the Phase-I expansion are already progressing. A cargo terminal and cargo complex which was initially in Phase-II has been shifted to Phase I and is under construction. The Phase II expansion will happen from 2026–27 to 2045–46. It includes another runway and a dedicated domestic terminal at Veliamparamba, and a long flyover to link it with Moorkhanparamba.<ref name="thehindu5"/><ref name="ashamsakal1">{{cite web |url=http://ashamsakal.com/kial_masterplanHRz.jpg |title=Archived copy |access-date=2016-06-09 |url-status=live |archive-url=https://web.archive.org/web/20160403163020/http://ashamsakal.com/kial_masterplanHRz.jpg |archive-date=3 April 2016}}</ref><ref name="thehindu2">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/With-mega-runway-Kannur-airport-in-top-four/article14632430.ece |title=With mega runway, Kannur airport in top four - NATIONAL |work=The Hindu|date=9 September 2016 |access-date=2017-12-24}}</ref><ref>{{cite web |url=http://english.keralakaumudi.com/news/kerala/kannur-airport-runway-ready-final-touch-up-in-progress-1.1860682 |title=Kannur airport: Runway ready, final touch-up in progress &#124; politics &#124; Kannur Airport |publisher=English.keralakaumudi.com |date=2017-04-10 |access-date=2017-12-24}}{{dead link|date=June 2019|bot=medic}}{{cbignore|bot=medic}}</ref><ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece |title=Airport consultant reviewing report |work=The Hindu|date=2012-11-26 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20180107201118/http://www.thehindu.com/news/national/kerala/Airport-consultant-reviewing-report/article15619237.ece |archive-date=7 January 2018}}</ref>


==Management==
==Management==
Kannur International Airport is the second greenfield airport to be built on a public private partnership (PPP) platform in Kerala. The airport is managed by Kannur International Airport Ltd.(KIAL), a public company.<ref>{{cite web |url=http://www.kannurairport.in/index.php/airport-project |title=Airport Project |publisher=Kannurairport.in |access-date=2017-12-24 |url-status=dead |archive-url=https://web.archive.org/web/20170608203204/http://www.kannurairport.in/index.php/airport-project |archive-date=8 June 2017}}</ref> Venu V, [[Indian Administrative Service|IAS]], is the current managing director of KIAL.<ref>{{cite web |url=http://www.kannurairport.in/ |title=Home-Kannur Airport |access-date=25 May 2014 |archive-url=https://web.archive.org/web/20180802043104/http://kannurairport.in/ |archive-date=2 August 2018 |url-status=dead }}</ref> [[List of chief ministers of Kerala|Chief minister of Kerala]] holds the post of chairman. The principle investor in KIAL, the Government of Kerala, owns 32.86% of the company's shares. Other shareholders are: 22.54% by State and Central Public Sector Undertakings, 9.39% by Airports Authority of India, 35.21% by others, including QIBs, Individuals, Companies, Cooperative, Banks/Societies, and other legal entities as approved by the Board of Directors from time to time.
Kannur International Airport is the second greenfield airport to be built on a public private partnership (PPP) platform in Kerala. The airport is managed by Kannur International Airport Ltd.(KIAL), a public company.<ref>{{cite web |url=http://www.kannurairport.in/index.php/airport-project |title=Airport Project |publisher=Kannurairport.in |access-date=2017-12-24 |url-status=dead |archive-url=https://web.archive.org/web/20170608203204/http://www.kannurairport.in/index.php/airport-project |archive-date=8 June 2017}}</ref> Venu V, [[Indian Administrative Service|IAS]], is the current managing director of KIAL.<ref>{{cite web |url=http://www.kannurairport.in/ |title=Home-Kannur Airport |access-date=25 May 2014 |archive-url=https://web.archive.org/web/20180802043104/http://kannurairport.in/ |archive-date=2 August 2018 |url-status=dead }}</ref> [[List of chief ministers of Kerala|Chief minister of Kerala]] holds the post of chairman. The principle investor in KIAL, the Government of Kerala, owns 32.86% of the company's shares.{{citation needed|date=April 2025}} Other shareholders are: 22.54% by State and Central Public Sector Undertakings, 9.39% by Airports Authority of India, 35.21% by others, including QIBs, Individuals, Companies, Cooperative, Banks/Societies, and other legal entities as approved by the Board of Directors from time to time.{{citation needed|date=April 2025}}


 
===Passenger terminal===
===Terminals===


{{multiple image
{{multiple image
| align     = right
| align             = right
| direction = vertical
| direction         = vertical
| image1   = Handloom model at departure area.jpg
| image1           = Handloom model at departure area.jpg
| width1   = 220
| width1           = 220
| alt1     =  
| alt1             =  
| caption1 = Handloom model at the departure area}}
| caption1         = Handloom model at the departure area
}}


 
The airport has an integrated passenger terminal for both international and domestic travellers with a floor area of {{convert|97000|m2|sqft|abbr=on}} for arrival and departure separately. It is able to handle up to 2,000 passengers during peak hours with its unique swing facility. It features six aerobridges with 48 check-in counters, 32 emigration counters, 16 customs counters, four conveyor belts and access control inside the terminal. The passenger terminal will use the swing facility. The international gates are used for domestic operations when there are no international flights. The passenger terminal building has a double skin aluminium roofing system and efficient LED lighting adopting the green building concept.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-to-have-swing-facility/article6176738.ece |title=Kannur airport to have 'swing' facility |work=The Hindu|date=4 July 2014 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140708030514/http://www.thehindu.com/news/national/kerala/kannur-airport-to-have-swing-facility/article6176738.ece |archive-date=8 July 2014}}</ref><ref name="thehindu3"/><ref name="kannurairport1">{{Cite web |url=http://www.kannurairport.in/images/pdf/Status%20Report%20of%20Kannur%20Airport%20as%20on%205%20December%202016.pdf |title=Archived copy |access-date=23 November 2017 |archive-url=https://web.archive.org/web/20170606072032/http://kannurairport.in/images/pdf/Status%20Report%20of%20Kannur%20Airport%20as%20on%205%20December%202016.pdf |archive-date=6 June 2017 |url-status=dead}}</ref><ref name="ashamsakal1"/>
The airport has an integrated passenger terminal for both international and domestic travellers with a floor area of {{convert|97000|m2|sqft|abbr=on}} for arrival and departure separately. It is able to handle up to 2,000 passengers during peak hours with its unique swing facility. It features six aerobridges with 48 check-in counters, 32 emigration counters, 16 customs counters, four conveyor belts and access control inside the terminal. The passenger terminal will use the swing facility. The international gates are used for domestic operations when there are no international flights. The passenger terminal building has a double skin aluminium roofing system and efficient LED lighting adopting the green building concept.<ref>{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-to-have-swing-facility/article6176738.ece |title=Kannur airport to have 'swing' facility |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140708030514/http://www.thehindu.com/news/national/kerala/kannur-airport-to-have-swing-facility/article6176738.ece |archive-date=8 July 2014}}</ref><ref name="thehindu3"/><ref name="kannurairport1">{{Cite web |url=http://www.kannurairport.in/images/pdf/Status%20Report%20of%20Kannur%20Airport%20as%20on%205%20December%202016.pdf |title=Archived copy |access-date=23 November 2017 |archive-url=https://web.archive.org/web/20170606072032/http://kannurairport.in/images/pdf/Status%20Report%20of%20Kannur%20Airport%20as%20on%205%20December%202016.pdf |archive-date=6 June 2017 |url-status=dead}}</ref><ref name="ashamsakal1"/>
{{multiple image
{{multiple image
| align    = right
| align    = right
Line 143: Line 144:
===Cargo terminal===
===Cargo terminal===


A cargo terminal complex having an 8-floor space of {{convert|32000|m2|sqft|abbr=on}} will also be constructed.<ref name="thehindu6">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-gearing-up-for-September-launch/article17244953.ece |title=Kannur airport gearing up for September launch - KERALA |work=The Hindu|date=2017-02-08 |access-date=2017-12-24}}</ref><ref name="thehindu1">{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-by-sept-next/article19716503.ece |title=Kannur airport by Sept next |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20170920020803/http://www.thehindu.com/news/national/kerala/kannur-airport-by-sept-next/article19716503.ece |archive-date=20 September 2017}}</ref>
A cargo terminal complex having an 8-floor space of {{convert|32000|m2|sqft|abbr=on}} will also be constructed.<ref name="thehindu6">{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/Kannur-airport-gearing-up-for-September-launch/article17244953.ece |title=Kannur airport gearing up for September launch - KERALA |work=The Hindu|date=2017-02-08 |access-date=2017-12-24}}</ref><ref name="thehindu1">{{cite web |url=http://www.thehindu.com/news/national/kerala/kannur-airport-by-sept-next/article19716503.ece |title=Kannur airport by Sept next |work=The Hindu|date=19 September 2017 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20170920020803/http://www.thehindu.com/news/national/kerala/kannur-airport-by-sept-next/article19716503.ece |archive-date=20 September 2017}}</ref>


==Airlines and destinations==
==Airlines and destinations==
Line 156: Line 157:
| width2            = 220
| width2            = 220
| alt2              =  
| alt2              =  
| caption2          = A [[GoAir]] [[Airbus A320|Airbus A320neo]] taxiing to the airport's apron
| caption2          = A [[GoAir]] [[Airbus A320]]neo taxiing to the airport's apron
| total_width      =  
| total_width      =  
}}
}}
<!-- WHEN ADDING A NEW ROUTE, OR ADDING AN END DATE FOR A ROUTE PLEASE ADD AN INDEPENDENT REFERENCE, ALSO ADD THE ROUTE AND LINK ON THE CORRESPONDING AIRPORTS ARTICLE AND THE AIRLINES ARTICLE IF IT IS A NEW DESTINATION, ANYTHING WHICH IS NOT REFERENCED WILL BE REMOVED. ALSO WHEN ADDING A NEW ROUTE, A FIRM DATE IS MANDATORY.-->
<!-- WHEN ADDING A NEW ROUTE, OR ADDING AN END DATE FOR A ROUTE PLEASE ADD AN INDEPENDENT REFERENCE, ALSO ADD THE ROUTE AND LINK ON THE CORRESPONDING AIRPORTS ARTICLE AND THE AIRLINES ARTICLE IF IT IS A NEW DESTINATION, ANYTHING WHICH IS NOT REFERENCED WILL BE REMOVED. ALSO WHEN ADDING A NEW ROUTE, A FIRM DATE IS MANDATORY.-->
{{Airport destination list
{{Airport destination list
<!-- -->
<!-- -->
| {{nowrap|[[Air India Express]]}} | [[Abu Dhabi International Airport|Abu Dhabi]], [[Bahrain International Airport|Bahrain]], [[Hamad International Airport|Doha]], [[Dubai International Airport|Dubai–International]], [[King Abdulaziz International Airport|Jeddah]], [[Kuwait International Airport|Kuwait City]], [[Mangalore International Airport|Mangalore]], [[Muscat International Airport|Muscat]], [[King Khalid International Airport|Riyadh]], [[Sharjah International Airport|Sharjah]]<ref>{{cite web|url=https://www.dgca.gov.in/digigov-portal/?page=jsp/dgca/InventoryList/airOperation/certification/foreignAirline/internationFLight/Air%20india%20Express_ISS2022.pdf&main4207/4201/servicename|title=Air India Express Schedule|access-date=31 March 2022}}</ref>
| {{nowrap|[[Air India Express]]}} | [[Abu Dhabi International Airport|Abu Dhabi]], [[Bahrain International Airport|Bahrain]] (Resumes on 02 April 2026), [[Kempegowda International Airport|Bengaluru]], [[King Fahd International Airport|Dammam]] (Resumes on 04 April 2026), [[Hamad International Airport|Doha]], [[Dubai International Airport|Dubai–International]], [[King Abdulaziz International Airport|Jeddah]] (Resumes on 04 April 2026), [[Kuwait International Airport|Kuwait City]] (Resumes on 02 April 2026), [[Muscat International Airport|Muscat]], [[Ras Al Khaimah International Airport|Ras Al Khaimah]],<ref name="AIX2024">{{cite web|url=https://www.aeroroutes.com/eng/240415-ix2q24int|title=Air India Express 2Q24 Middle East Network Additions|publisher=AeroRoutes|date=15 April 2024|accessdate=15 April 2024}}</ref> [[King Khalid International Airport|Riyadh]], [[Sharjah International Airport|Sharjah]], [[Thiruvananthapuram International Airport|Thiruvananthapuram]]
<!-- -->
<!----> 
|[[IndiGo]]|[[Kempegowda International Airport|Bangalore]], [[Chennai International Airport|Chennai]], [[Hamad International Airport|Doha]], [[Rajiv Gandhi International Airport|Hyderabad]], [[Cochin International Airport|Kochi]], [[Chhatrapati Shivaji Maharaj International Airport|Mumbai]],<ref>{{cite web|url=https://centreforaviation.com/news/indigo-to-resume-mumbai-kannur-service-from-jul-2023-1207653|title=IndiGo to resume Mumbai-Kannur service from Jul-2023|work=CAPA|accessdate=15 June 2023}}</ref> [[Trivandrum International Airport|Thiruvananthapuram]],<ref>{{cite web|url=https://www.dgca.gov.in/digigov-portal/?page=jsp/dgca/InventoryList/airOperation/certification/foreignAirline/internationFLight/Indigo_ISS2022.pdf&main4207/4201/servicename|title=IndiGo Schedule|access-date=31 March 2022}}</ref> [[Tiruchirappalli International Airport|Tiruchirappalli]]<ref>{{cite news |title=IndiGo’s Trichy-Kannur daily flight via Bengaluru from December |url=https://timesofindia.indiatimes.com/city/trichy/indigos-trichy-kannur-daily-flight-via-bengaluru-from-dec/articleshow/95592571.cms |work=Times of India |language=en}}</ref>
| {{nowrap|[[IndiGo]]}} | [[Abu Dhabi International Airport|Abu Dhabi]],<ref>{{cite news|title=IndiGo announces direct flights between Abu Dhabi and Kerala's Kannur|url=https://www.zeebiz.com/economy-infra/aviation/news-indigo-announces-direct-flights-between-abu-dhabi-and-keralas-kannur-282132|work=Zee Business|date=30 March 2024|access-date=31 March 2024|language=en}}</ref> [[Kempegowda International Airport|Bengaluru]], [[Chennai International Airport|Chennai]], [[Indira Gandhi International Airport|Delhi]],<ref>{{cite news|title=IndiGo to resume Kannur-Delhi daily flights from December 12|url=https://www.thehindu.com/news/national/kerala/indigo-to-resume-kannur-delhi-daily-flights-from-december-12/article68905332.ece|work=The Hindu|date=24 November 2024|access-date=7 December 2024|language=en}}</ref> [[Hamad International Airport|Doha]], [[Fujairah International Airport|Fujairah]],<ref>{{cite web |title=IndiGo Adds Fujairah Service From mid-May 2025 |url=https://www.aeroroutes.com/eng/250410-6ens25fjr |website=Aeroroutes |access-date=10 April 2025}}</ref> [[Rajiv Gandhi International Airport|Hyderabad]], [[Cochin International Airport|Kochi]], [[Chhatrapati Shivaji Maharaj International Airport|Mumbai–Shivaji]], [[Navi Mumbai Airport|Mumbai—Navi]] (begins 30 March 2026),<ref>{{cite web | title=Oman flight suspension: IndiGo suspends Muscat–Kannur flights citing low seasonal demand | work=The Times of India | date=20 August 2025 | url=https://timesofindia.indiatimes.com/world/middle-east/oman-flight-suspension-indigo-suspends-muscatkannur-flights-citing-low-seasonal-demand/articleshow/123400507.cms }}</ref><ref>{{cite news|title=IndiGo to start operations from Muscat to Kannur|url=https://www.thearabianstories.com/2025/04/02/indigo-to-start-operations-from-muscat-to-kannur/|work=thearabianstories|access-date=April 2, 2025}}</ref>|
}}
}}
==Statistics==
{{Airport-Statistics|iata=CNN}}


==Operational infrastructure==
==Operational infrastructure==
Line 181: Line 180:
| caption1  = aerial view of runway 07/25}}
| caption1  = aerial view of runway 07/25}}


The airport's air navigation services and [[air traffic control]] will be handled by the [[Airports Authority of India]] (AAI). The ATC tower will be equipped with [[Doppler radar|Doppler]] variable omni range and [[distance measuring equipment]], air traffic system automation, instrument landing system, voice recorder, and a GPS clock system. It will have [[Very high frequency|VHF]] communication facilities and equipment for obtaining radar signals from the [[Cochin International Airport]]. The tower is {{convert|30|m|ft}} high and has a floor area of {{convert|1923|m2|ft2}}.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/agreements-signed-for-airport/article6620200.ece |title=Agreements signed for airport - KERALA |work=The Hindu|date=2014-11-21 |access-date=2017-12-24}}</ref><ref name="thehindu4"/><ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/kannur-airport-nearing-take-off-stage/article21822325.ece |title=Kannur airport nearing take-off stage |work=The Hindu|access-date=2017-12-24}}</ref>
The airport's air navigation services and [[air traffic control]] will be handled by the [[Airports Authority of India]] (AAI). The ATC tower will be equipped with [[Doppler radar|Doppler]] variable omni range and [[distance measuring equipment]], air traffic system automation, instrument landing system, voice recorder, and a GPS clock system. It will have [[Very high frequency|VHF]] communication facilities and equipment for obtaining radar signals from the [[Cochin International Airport]]. The tower is {{convert|30|m|ft}} high and has a floor area of {{convert|1923|m2|ft2}}.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/agreements-signed-for-airport/article6620200.ece |title=Agreements signed for airport - KERALA |work=The Hindu|date=2014-11-21 |access-date=2017-12-24}}</ref><ref name="thehindu4"/><ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/kannur-airport-nearing-take-off-stage/article21822325.ece |title=Kannur airport nearing take-off stage |work=The Hindu|date=16 December 2017 |access-date=2017-12-24}}</ref>


Various [[Weather station|weather monitoring]], [[weather forecasting]] and alert systems are being installed at the airport by the [[India Meteorological Department]] (IMD). The [[Automated airport weather station|Automated Weather Observing System]] (AWOS) for weather observations, is supplemented by climatological data, weather forecasting and aerodrome warning from IMD. The IMD will send minute-by-minute weather updates in the form of audio messages directly to pilots, instead of passing the information manually to the ATC and through them to the pilot. The information could include wind speed, gusts and direction, temperature and [[dew point]], visibility, density, altitude, thunderstorm, lightning etc. ensuring smooth aircraft operation.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/weather-alert-system-for-kannur-airport/article6428586.ece |title=Weather alert system for Kannur airport - KERALA |work=The Hindu|date=2014-09-20 |access-date=2017-12-24}}</ref>
Various [[Weather station|weather monitoring]], [[weather forecasting]] and alert systems are being installed at the airport by the [[India Meteorological Department]] (IMD). The [[Automated airport weather station|Automated Weather Observing System]] (AWOS) for weather observations, is supplemented by climatological data, weather forecasting and aerodrome warning from IMD. The IMD will send minute-by-minute weather updates in the form of audio messages directly to pilots, instead of passing the information manually to the ATC and through them to the pilot. The information could include wind speed, gusts and direction, temperature and [[dew point]], visibility, density, altitude, thunderstorm, lightning etc. ensuring smooth aircraft operation.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/weather-alert-system-for-kannur-airport/article6428586.ece |title=Weather alert system for Kannur airport - KERALA |work=The Hindu|date=2014-09-20 |access-date=2017-12-24}}</ref>
Line 187: Line 186:
The airport will have a {{convert|300|m|yd}}-long, {{convert|90|m|yd}}-wide [[runway end safety area]] (RESA) on both ends of the runway. This reduces the risk of casualties and damage to aircraft in the event of an undershoot, overshoot or excursion from the runway. The RESA is protected with a [[Mechanically stabilized earth|Reinforced Earth]] wall. The airport will have an isolation bay towards the 07 side. An isolation bay, with a diameter of {{convert|125|m|yd}} is a special parking space created for an aircraft facing an exigency like hijack or bomb threat.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/flights-to-take-off-from-kannur-in-2016/article5432404.ece |title=Flights to take off from Kannur in 2016 - KERALA |work=The Hindu|date=2013-12-07 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830151445/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/flights-to-take-off-from-kannur-in-2016/article5432404.ece |archive-date=30 August 2014}}</ref><ref>{{cite web |url=http://www.kannurairport.in/index.php/photo-gallery/10-workin-progress-kannurairport-set1/detail/1545-construction-of-reinforced-earth-wall-at-resa-07-side-in-progress-as-on-20-02-2017?tmpl=component |title=Photo gallery - Construction of Reinforced Earth Wall at Resa 07 side in progress as on 20.02.2017 |publisher=Kannurairport.in |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222051945/http://www.kannurairport.in/index.php/photo-gallery/10-workin-progress-kannurairport-set1/detail/1545-construction-of-reinforced-earth-wall-at-resa-07-side-in-progress-as-on-20-02-2017?tmpl=component |archive-date=22 December 2017}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/licensing-procedure-for-kannur-airport-begins/article6381918.ece |title=Licensing procedure for Kannur airport begins - KERALA |work=The Hindu|date=2014-09-05 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140906090536/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/licensing-procedure-for-kannur-airport-begins/article6381918.ece |archive-date=6 September 2014}}</ref><ref name="ashamsakal1"/>
The airport will have a {{convert|300|m|yd}}-long, {{convert|90|m|yd}}-wide [[runway end safety area]] (RESA) on both ends of the runway. This reduces the risk of casualties and damage to aircraft in the event of an undershoot, overshoot or excursion from the runway. The RESA is protected with a [[Mechanically stabilized earth|Reinforced Earth]] wall. The airport will have an isolation bay towards the 07 side. An isolation bay, with a diameter of {{convert|125|m|yd}} is a special parking space created for an aircraft facing an exigency like hijack or bomb threat.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/flights-to-take-off-from-kannur-in-2016/article5432404.ece |title=Flights to take off from Kannur in 2016 - KERALA |work=The Hindu|date=2013-12-07 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140830151445/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/flights-to-take-off-from-kannur-in-2016/article5432404.ece |archive-date=30 August 2014}}</ref><ref>{{cite web |url=http://www.kannurairport.in/index.php/photo-gallery/10-workin-progress-kannurairport-set1/detail/1545-construction-of-reinforced-earth-wall-at-resa-07-side-in-progress-as-on-20-02-2017?tmpl=component |title=Photo gallery - Construction of Reinforced Earth Wall at Resa 07 side in progress as on 20.02.2017 |publisher=Kannurairport.in |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222051945/http://www.kannurairport.in/index.php/photo-gallery/10-workin-progress-kannurairport-set1/detail/1545-construction-of-reinforced-earth-wall-at-resa-07-side-in-progress-as-on-20-02-2017?tmpl=component |archive-date=22 December 2017}}</ref><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/licensing-procedure-for-kannur-airport-begins/article6381918.ece |title=Licensing procedure for Kannur airport begins - KERALA |work=The Hindu|date=2014-09-05 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140906090536/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/licensing-procedure-for-kannur-airport-begins/article6381918.ece |archive-date=6 September 2014}}</ref><ref name="ashamsakal1"/>


Various [[ground support equipment]] (GSE) will be available to service the aircraft between flights. These include dollies, chocks, aircraft service stairs, aircraft refuelers, transporters, catering vehicles, and belt loaders. Ground handling in the airport will be managed by [[Air India|Air India Air Transport Services Ltd.]] (AI-ATSL).
Ground handling in the airport will be managed by [[Air India|Air India Air Transport Services Ltd.]] (AI-ATSL).


===Aviation fuel farm===
===Aviation fuel farm===
The airport has a {{convert|28000|m2|yd2}} fuel farm constructed and operated as a joint venture company floated by KIAL and [[Bharat Petroleum|Bharat Petroleum Corporation Ltd.]] (BPCL) — the BPCL-KIAL Fuel Farm Private Ltd. The Rs. 17-crore fuel farm has underground tanks for aviation fuel storage and will provide fuel for aircraft operating from the airport. BPCL has a Rs. 170-crore stake in KIAL.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/fuel-farm-work-begins-at-kannur-airport-site/article8024002.ece |title=Fuel farm work begins at Kannur airport site - KERALA |work=The Hindu|access-date=2017-12-24}}</ref>
The airport has a {{convert|28000|m2|yd2}} fuel farm constructed and operated as a joint venture company floated by KIAL and [[Bharat Petroleum|Bharat Petroleum Corporation Ltd.]] (BPCL) — the BPCL-KIAL Fuel Farm Private Ltd. The Rs. 17-crore fuel farm has underground tanks for aviation fuel storage and will provide fuel for aircraft operating from the airport. BPCL has a Rs. 170-crore stake in KIAL.<ref>{{cite web|url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/fuel-farm-work-begins-at-kannur-airport-site/article8024002.ece |title=Fuel farm work begins at Kannur airport site - KERALA |work=The Hindu|date=23 December 2015 |access-date=2017-12-24}}</ref>


===MRO===
===MRO===
Line 196: Line 195:


===Enclaves===
===Enclaves===
The airport will have an [[Indian Navy]] air enclave on convert ten acres of land. The location is a priority for the Navy since the [[Indian Naval Academy|Ezhimala Naval Academy]], the only naval academy in India, and the largest in Asia, is just {{convert|60|km|mi}} away from the airport. [[Ezhimala Hill|Ezhimala]] is also a strategic defense location. The original demands for transfer of the ten acres of airport land to the Navy included having a representative from Southern Naval Command on KIAL's board of directors, to set up the enclave. This was dropped by the Navy. The land was transferred to the Navy on a long-term lease against token rent for establishing the enclave.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/norms-relaxed-for-naval-air-enclave/article4125565.ece |title=Norms relaxed for Naval Air Enclave - KERALA |work=The Hindu|date=2012-11-23 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222053756/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/norms-relaxed-for-naval-air-enclave/article4125565.ece |archive-date=22 December 2017}}</ref><ref name="thehindu7">{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/defence-enclaves-for-kannur-airport/article5924612.ece |title=Defence enclaves for Kannur airport - KERALA |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140626101249/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/defence-enclaves-for-kannur-airport/article5924612.ece |archive-date=26 June 2014}}</ref><ref>{{cite web |url=http://ina.gov.in/?q=History_INA |title=Campus |publisher=INA |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171024233107/http://ina.gov.in/?q=History_INA |archive-date=24 October 2017}}</ref>
The airport will have an [[Indian Navy]] air enclave on ten acres of land. The location is a priority for the Navy since the [[Indian Naval Academy|Ezhimala Naval Academy]], the only naval academy in India, and the largest in Asia, is just {{convert|60|km|mi}} away from the airport. [[Ezhimala Hill|Ezhimala]] is also a strategic defense location. The original demands for transfer of the ten acres of airport land to the Navy included having a representative from Southern Naval Command on KIAL's board of directors, to set up the enclave. This was dropped by the Navy. The land was transferred to the Navy on a long-term lease against token rent for establishing the enclave.<ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/norms-relaxed-for-naval-air-enclave/article4125565.ece |title=Norms relaxed for Naval Air Enclave - KERALA |work=The Hindu|date=2012-11-23 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222053756/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/norms-relaxed-for-naval-air-enclave/article4125565.ece |archive-date=22 December 2017}}</ref><ref name="thehindu7">{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/defence-enclaves-for-kannur-airport/article5924612.ece |title=Defence enclaves for Kannur airport - KERALA |work=The Hindu|date=17 April 2014 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20140626101249/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/defence-enclaves-for-kannur-airport/article5924612.ece |archive-date=26 June 2014}}</ref><ref>{{cite web |url=http://ina.gov.in/?q=History_INA |title=Campus |publisher=INA |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171024233107/http://ina.gov.in/?q=History_INA |archive-date=24 October 2017}}</ref>


The [[Indian Air Force]] will have a presence at the airport with a separate enclave set up on ten acres of land. Defense officials had approved the enclave in view of the airport's strategic location. [[Kannur Cantonment]], the only Army Cantonment in Kerala is {{convert|30|km|mi}} away from the airport. The land provided on a long-term lease, against a token rent, is located beside the operational apron of the airport. Work on the enclave's hangars and administrative buildings is underway.<ref name="thehindu7"/>
The [[Indian Air Force]] will have a presence at the airport with a separate enclave set up on ten acres of land. Defense officials had approved the enclave in view of the airport's strategic location. [[Kannur Cantonment]], the only Army Cantonment in Kerala is {{convert|30|km|mi}} away from the airport. The land provided on a long-term lease, against a token rent, is located beside the operational apron of the airport. Work on the enclave's hangars and administrative buildings is underway.<ref name="thehindu7"/>


An enclave will be set up by [[Indian Coast Guard]] (ICG) at the Kannur airport to augment air surveillance along the coast. India's first [[Indian Coast Guard Academy|Coast Guard Academy]] is located at [[Azhikode and Azhikkal|Azhikkal]], {{convert|36|km|mi}} from the airport{{citation needed|date=December 2018}}. Considering this, the strategic location and the proximity to the coast of the airport the ICG had sought 20 acres of airport land. The KIAL board authorized the airport's managing director to provide 10 acres on a long-term lease against token rent to establish the enclave.<ref name="thehindu7"/><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/coast-guard-academy-to-be-ready-in-over-3-years-director-general/article5532964.ece |title=Coast Guard Academy to be ready in over 3 years: Director General - KERALA |work=The Hindu|access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222054601/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/coast-guard-academy-to-be-ready-in-over-3-years-director-general/article5532964.ece |archive-date=22 December 2017}}</ref><ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/First-Coast-Guard-academy-to-come-up-at-Azheekkal/article15461132.ece |title=First Coast Guard academy to come up at Azheekkal |work=The Hindu|date=2011-02-27 |access-date=2017-12-24}}</ref>
An enclave will be set up by [[Indian Coast Guard]] (ICG) at the Kannur airport to augment air surveillance along the coast. India's first [[Indian Coast Guard Academy|Coast Guard Academy]] is located at [[Azhikode and Azhikkal|Azhikkal]], {{convert|36|km|mi}} from the airport{{citation needed|date=December 2018}}. Considering this, the strategic location and the proximity to the coast of the airport the ICG had sought 20 acres of airport land. The KIAL board authorized the airport's managing director to provide 10 acres on a long-term lease against token rent to establish the enclave.<ref name="thehindu7"/><ref>{{cite web |url=http://www.thehindu.com/todays-paper/tp-national/tp-kerala/coast-guard-academy-to-be-ready-in-over-3-years-director-general/article5532964.ece |title=Coast Guard Academy to be ready in over 3 years: Director General - KERALA |work=The Hindu|date=2 January 2014 |access-date=2017-12-24 |url-status=live |archive-url=https://web.archive.org/web/20171222054601/http://www.thehindu.com/todays-paper/tp-national/tp-kerala/coast-guard-academy-to-be-ready-in-over-3-years-director-general/article5532964.ece |archive-date=22 December 2017}}</ref><ref>{{cite web|url=http://www.thehindu.com/news/national/kerala/First-Coast-Guard-academy-to-come-up-at-Azheekkal/article15461132.ece |title=First Coast Guard academy to come up at Azheekkal |work=The Hindu|date=2011-02-27 |access-date=2017-12-24}}</ref>


===Aviation academy===
===Aviation academy===
Line 211: Line 210:
The airport comes under the jurisdiction of Mattanur Airport Police station under [[Kannur City Police]] established on 12 August 2018. The jurisdictional area coming inside the airport compound wall in Morkanparamaba in [[Keezhallur|Keezhallur Panchayat]] and area of Kallerikkara ward of [[Mattanur|Mattanur Municipality]] coming inside the Airport compound wall. The whole area of the station is owned by [[Kannur International Airport Limited|KIAL]]. The magisterial jurisdiction of the station is Judicial First Class Magistrate Court, Mattanur.<ref>{{Cite web |url=https://ps.keralapolice.gov.in/mattannurairport-ps/about |title=About - Mattanur Airport PS |website=keralapolice.gov.in}}</ref>
The airport comes under the jurisdiction of Mattanur Airport Police station under [[Kannur City Police]] established on 12 August 2018. The jurisdictional area coming inside the airport compound wall in Morkanparamaba in [[Keezhallur|Keezhallur Panchayat]] and area of Kallerikkara ward of [[Mattanur|Mattanur Municipality]] coming inside the Airport compound wall. The whole area of the station is owned by [[Kannur International Airport Limited|KIAL]]. The magisterial jurisdiction of the station is Judicial First Class Magistrate Court, Mattanur.<ref>{{Cite web |url=https://ps.keralapolice.gov.in/mattannurairport-ps/about |title=About - Mattanur Airport PS |website=keralapolice.gov.in}}</ref>


==Connectivity==
==Ground transport==
Pre-paid taxi service is available at the airport round the clock. KSRTC provides service to various destinations in [[Kannur]], [[Kasaragod]], [[Kozhikode]] and [[Malappuram]] districts from the airport. The nearest town is at [[Mattannur]] situated {{cvt|5|km}} away from the airport which has bus connectivity to various parts of [[Kannur]] district, [[Kodagu]] district and [[Mysore]]. Autorickshaw service is available at the airport to [[Mattannur]]. The closest railway stations are at [[Thalassery]] ({{cvt|25|km|disp=sqbr}}) and [[Kannur]] ({{cvt|27|km|disp=sqbr}}) from the airport. Till date,{{when|date=January 2021}} there is no [[Uber]] or [[Ola Cabs]] service facility from the airport.
Pre-paid taxi service is available at the airport round the clock. KSRTC provides service to various destinations in [[Kannur]], [[Kasaragod]], [[Kozhikode]] and [[Malappuram]] districts from the airport. The nearest town is at [[Mattannur]] situated {{cvt|5|km}} away from the airport which has bus connectivity to various parts of [[Kannur]] district, [[Kodagu]] district and [[Mysore]]. Autorickshaw service is available at the airport to [[Mattannur]]. The closest railway stations are at [[Thalassery]] ({{cvt|25|km|disp=sqbr}}) and [[Kannur]] ({{cvt|27|km|disp=sqbr}}) from the airport. Till date,{{when|date=January 2021}} there is no [[Uber]] or [[Ola Cabs]] service facility from the airport.


Line 217: Line 216:
The proposed Kannur-Mysore National Highway under Bharatmala project, passes through Airport provides easy access to the important cities and towns in Kerala and Karnataka states.<ref>{{cite news |url=https://www.thehindu.com/news/national/kerala/kannur-mysuru-corridor-to-be-made-nh/article19366290.ece |title=Kannur-Mysuru corridor to be made NH |work= [[The Hindu]] |access-date=26 July 2017}}</ref><ref>{{cite news |url=https://www.newindianexpress.com/states/kerala/2021/jul/15/11-roads-to-be-added-in-2nd-phase-of-bharatmala-project-2330267.html |title=11 roads to be added in second phase of Bharatmala project |work=[[Times of India]] |access-date=15 July 2021}}</ref>
The proposed Kannur-Mysore National Highway under Bharatmala project, passes through Airport provides easy access to the important cities and towns in Kerala and Karnataka states.<ref>{{cite news |url=https://www.thehindu.com/news/national/kerala/kannur-mysuru-corridor-to-be-made-nh/article19366290.ece |title=Kannur-Mysuru corridor to be made NH |work= [[The Hindu]] |access-date=26 July 2017}}</ref><ref>{{cite news |url=https://www.newindianexpress.com/states/kerala/2021/jul/15/11-roads-to-be-added-in-2nd-phase-of-bharatmala-project-2330267.html |title=11 roads to be added in second phase of Bharatmala project |work=[[Times of India]] |access-date=15 July 2021}}</ref>


Kerala government has given node for developing Mattanur-Kootupuzha road, Thalassery-Anjarakandy-Mattanur road, Kuttiady-Panoor-Mattanur road, Mananthavady-Mattanur road, Kannur-Airport roads for better connectivity.<ref>{{cite news |url=https://m.timesofindia.com/city/kochi/govt-speeds-up-work-of-roads-connecting-kannur-airport/amp_articleshow/70078305.cms |title=Govt speeds up work of roads connecting Kannur airport |work=[[Times of India]]}}</ref><ref>{{cite news |url=https://www.thehindu.com/news/cities/kozhikode/steps-to-develop-airport-road/article29649819.ece |title=Steps to develop airport road |work=[[The Hindu]] |access-date=10 October 2019}}</ref>
Kerala government has given node for developing Mattanur-Kootupuzha road, Thalassery-Anjarakandy-Mattanur road, Kuttiady-Panoor-Mattanur road, Mananthavady-Mattanur road, Kannur-Airport roads for better connectivity.<ref>{{cite news |url=https://timesofindia.indiatimes.com/city/kochi/govt-speeds-up-work-of-roads-connecting-kannur-airport/articleshow/70078305.cms |title=Govt speeds up work of roads connecting Kannur airport |work=[[Times of India]]}}</ref><ref>{{cite news |url=https://www.thehindu.com/news/cities/kozhikode/steps-to-develop-airport-road/article29649819.ece |title=Steps to develop airport road |work=[[The Hindu]] |access-date=10 October 2019}}</ref>


==See also==
==See also==
* [[Calicut International Airport]]
* [[Kozhikode International Airport]]
* [[Mangalore International Airport]]
* [[Mangalore International Airport]]
* [[Cochin International Airport]]
* [[Cochin International Airport]]
* [[Trivandrum International Airport]]
* [[Thiruvananthapuram International Airport]]
* [[List of airports in Kerala|List of Airports in Kerala]]
* [[List of airports in Kerala]]
* [[Airports in India]]
* [[Airports in India]]
* [[Thalassery]]
* [[Kannur]]
* [[Payyanur]]
* [[Payyanur]]


Line 238: Line 235:
* [http://centreforaviation.com/profiles/newairports/kannur-international-airport Profile of Kannur International Airport by CAPA - Centre for Aviation]
* [http://centreforaviation.com/profiles/newairports/kannur-international-airport Profile of Kannur International Airport by CAPA - Centre for Aviation]


{{Portalbar|India|Aviation}}
{{Portal bar|India|Aviation}}
{{Kannur}}
{{Kannur}}
{{Airports in India}}
{{Airports in India}}
Line 249: Line 246:
[[Category:2018 establishments in Kerala]]
[[Category:2018 establishments in Kerala]]
[[Category:Airports established in 2018]]
[[Category:Airports established in 2018]]
[[Category:History of Kerala (1947–present)]]
[[Category:Airports Authority of India]]

Latest revision as of 22:53, 10 March 2026


Kannur International Airport
Summary
Airport typePublic
Owner/OperatorKannur International Airport Limited (KIAL)
ServesKannur
LocationMattanur, Kannur district, Kerala, India
Opened9 December 2018; 7 years ago (2018-12-09)[1]
Hub forAir India Express
Focus city for
Elevation AMSL76 m / 249 ft
Coordinates11°55′N 75°33′E / 11.92°N 75.55°E / 11.92; 75.55
Websitekannurairport.aero
Map
CNN is located in Kerala
CNN
CNN
CNN is located in India
CNN
CNN
Runways
Direction Length Surface
m ft
07/25 3,050 10,007 Asphalt
Statistics (April 2024 - March 2025)
Passengers1,344,021 (Increase 14.1%)
Aircraft movements11,555 (Increase 5.3%)
Cargo tonnage4,151 (Increase 25.6%)
Source: AAI[2][3][4]

Kannur International Airport (IATA: CNN, ICAO: VOKN) is an international airport serving the city of Kannur, the Mahé district of Puducherry and the rest of northern Kerala in India. It is located in Mattanur, 28 km (17 mi) east of Kannur and 24 km (15 mi) east of Thalassery. It is owned and operated by Kannur International Airport Limited (KIAL), a public–private consortium. The airport opened for commercial operations on 9 December 2018.[5]

The airport served one million passengers in just nine months since commercial operations began.[6][7] Amidst the COVID-19 pandemic in India, the airport could maintain stable growth, and it achieved the milestone of two million passengers in the twenty-third month of operations in November 2020.[8] Though several international airlines have reportedly shown interest in operating from Kannur, they are unable to operate regularly scheduled flights from Kannur International Airport as the airport lacks point of call status.[9][10][11][12][13][14][15] The airport handled 1.5 million passengers in 2025, marking the highest annual passenger traffic since it began operations. The previous record was 1.47 million passengers in 2019.[16]

The first aircraft to land was an Indian Air Force (IAF) aircraft that touched down at the airport on 29 February 2016.[17] The first trial passenger flight operation was conducted on 20 September 2018, using a Boeing 737-800 aircraft of Air India Express.[18][19] On the inaugural day, 9 December 2018, an Air India Express flight IX 715, operated with a Boeing 737-800, took off to Abu Dhabi at 10:13 (IST), becoming the first commercial passenger aircraft to depart from Kannur.[20][5][21][22] The airport was inaugurated by then Minister of Civil Aviation, Suresh Prabhu and Chief Minister of Kerala, Pinarayi Vijayan.

Terminal building of the airport
Terminal Interior

History[edit | edit source]

Kannur had an airstrip used for commercial aviation as early as 1935 when TATA airlines operated weekly flights between Bombay and Thiruvananthapuram – stopping at Goa and Cannanore.[23] This airstrip was located within the Kannur Cantonment area at Fort Maidan.[24] The operator started service to Kerala on 29 October 1935 but service did not last long.[25]

The long-standing demand for a full-fledged airport was only conceptualized in 1997, when C. M. Ibrahim, the then Union Minister of Civil Aviation, backed the proposal for an airport in the district. The vast extent of land at Moorkhanparamba near Mattannur was identified for the project a few months later following a hectic search for land for developing the proposed airport. The then Chief Minister of Kerala V. S. Achuthanandan laid the foundation stone for the airport at the project site marking the formal commencement of construction activities on 17 December 2010 at a function attended by the then Civil Aviation Minister Praful Patel.[26] Though the State government accorded sanction for the Kannur International Airport project in January 1998 and appointed Kerala Industrial Infrastructure Development Corporation (KINFRA) as the nodal agency for its implementation, it had to wait for a decade until it was finally approved by the Central government in January 2008. During the period, a private agency appointed by Kerala Industrial Infrastructure Development Corporation (KINFRA) to study techno-economic feasibility report submitted its report.[27] The earlier site proposed at Madayipara was dropped owing to ecological concerns. Two vast plateaus near Mattannur were identified for the airport, namely Moorkhanparamb and Velliyamparamb, with about 1300 acres and 800 acres of land to be acquired from each respectively.[28][29][30][31]

After a prolonged wait, the airport received in-principle approval from the Ministry of Civil Aviation and Union cabinet in January 2008.[32] Land acquisition began in December 2008 after issuing notifications and fixing compensation.[33] The public company Kannur International Airport Limited (KIAL), under the Public-Private Partnership (PPP) model, was registered in October 2009.[34] The foundation stone for the airport was laid on 17 December 2010 by then-Chief Minister V. S. Achuthanandan.[35] On 26 November 2013, KIAL and Larsen & Toubro Ltd are scheduled to sign a contract on construction work at the airport. In January 2014, The Kerala State Government Minister for Excise and Ports announced the Kerala State Government and AAI plan to sign an MoU on the equity structure of Kannur International Airport Limited.[36]

Construction work at the airport was inaugurated by Defence Minister and senior Congress leader A. K. Antony on 2 February 2014. On 29 February 2016, The first trial flight was landed and Chief Minister Oommen Chandy Flag off for the inauguration of Runway.[37]

Kannur International Airport commenced operations on 9 December 2018.[38] The first commercial aircraft to operate out of the airport was Air India Express IX 715 (Boeing 737-800) to Abu Dhabi, which took off at 10:13 (IST) on the same day.[39][22] The flight was jointly flagged off by the Chief Minister of Kerala, Pinarayi Vijayan and Union Minister for Civil Aviation, Suresh Prabhu.[39]

Aircraft of several foreign airlines touched down for the first time at Kannur International Airport in June 2020 as part of the repatriation flights arranged owing to the COVID-19.[40][41] Widebody aircraft also landed for the first time in June.[42] Airbus A330-200 of Kuwait Airways, was the first foreign airline and also the first widebody aircraft that landed at Kannur.[43] The aircraft of Kuwait Airways,[43][44] Flydubai,[45] Jazeera Airways,[44] SalamAir,[46] Gulf Air,[47] Air Arabia,[48] Etihad Airways,[49] Saudia,[47] and Oman Air[50] operated to and from Kannur during June–August 2020 as repatriation/chartered flights.

Construction[edit | edit source]

By August 2010, acquisition of about 1200 acres of land was completed in two phases, and acquisition of another 780 acres was in progress for the third phase.[51][52]

In July 2011, the Oommen Chandy government decided to make Airports Authority of India a consultant tasked with preparing a revised techno-economic feasibility report and a new master plan and design.[53] As the Airports Authority of India failed to submit the report in time, the consultancy was canceled and Cochin International Airport (CIAL) was entrusted to prepare the detailed project report, but the floating of tenders for construction was further delayed as experts found several technical flaws in the design prepared by CIAL.[54][55]

Land acquired by the government under KINFRA was transferred to KIAL earlier in February 2012.[56] In August 2012, Mumbai based company STUP Consultants Pvt Ltd. was made consultant to review the revised report by CIAL and to assist KIAL in other aspects of the project, but the agreement was canceled within two weeks as it was found that the company had been blacklisted in other states.[57][58] Fresh bids were solicited and Hong Kong-based AECOM Asia was awarded the consultancy.[59][60] The project office was inaugurated at Mattannur in December 2012.[61]

EPC-I & EPC-II[edit | edit source]

It was decided to build the airport in two stages of engineering, procurement, and construction (EPC). The first stage, EPC-I included complete earthwork, runway, taxiway, apron, ground lighting and associated infrastructure such as perimeter and operational walls.[citation needed]

The second stage, EPC-II, involved the integrated terminal building, air traffic control tower, administrative and technical blocks, and facilities in the buildings such as aerobridges, escalators, elevators and counters.[62] Infrastructure and engineering conglomerate Larsen & Toubro (L&T) was awarded work for EPC-I on 27 November 2013, after inviting bids.[63] Airport work was flagged off by the then Defense Minister A.K. Antony at a public function in Mattannur on 2 February 2014.[64] L&T also won the tender for EPC-II works including the construction of the passenger terminal building (PTB) on 25 June 2014.[65] A huge amount of earthwork was carried out at the site including the cutting and filling of a total 2,340,000 cubic metres (3,060,000 cu yd) of land at a maximum rate of 70,000 cubic metres (92,000 cu yd) per day.[66] About 50% of the land works and foundation and piling work for constructing the PTB and air traffic control tower were completed by March 2015.[67] By August 2015, about 60% of the runway was completed. Steps were initiated to procure lifts, a baggage handling system, passenger boarding bridges, and the four Airfield Crash Fire Tenders.[68] About 70% of the work on the runway, apron and associated work, and 52% of the PTB and allied work was completed by December 2015.[69] Works for a 28,000 square metres (33,000 sq yd) fuel farm also began the same month.[70] The then Kerala Airports Minister K. Babu ruled out the popular demand to extend the runway to 4,000 metres (4,400 yd).[71] Meanwhile, the third phase of land acquisition involving about 785 acres on Velliyamparmb, which began in 2011, had been progressing at a very slow pace and only 612 acres were acquired in five years.[72] The late decision to acquire more land for a runway extension from 3,050 metres (3,340 yd) to 3,400 metres (3,700 yd) on the western side, in the finishing stages of the project, triggered protests from residents.[73] A trial landing was conducted on a completed 2,400 metres (2,600 yd) runway by a 14-seater code B aircraft on 29 February 2016. The air traffic control tower was not involved as it was still under construction. Technical assistance of the Aviation Control of the Calicut airport was sought for the landing. No runway calibration, or testing of flight parameters, was done during the landing. The trial landing was organized as a major event by the authorities and involved extensive public participation. The Oommen Chandy government faced fierce criticism for organizing such an event when the whole airport project was not complete. The opposition termed it an "election stunt" as Kerala was going to the polls in the coming months. Around 30 lakh (US$42,000) were spent on the event.[74][75][76][77][78]

By May 2016, the 3,050 metres (3,340 yd) runway was completed with work on the 150 metres (160 yd) grading side strip on both ends progressing. 68% of the PTB, 75% of the ATC tower and much of the work for the fuel farm was completed. Work on the ancillary buildings – fire rescue station, power house, the area for the India Meteorological Department (IMD), sewage treatment plant, service block, and the airfield ground lighting substation were progressing.[79] The newly elected Pinaryi government decided to begin land acquisition to extend the runway to 4,000 metres (4,400 yd) in August 2016.[80]

Phase I & Phase II[edit | edit source]

The Phase I expansion period is from 2016–17 to 2025–26. It includes a 4,000 metres (4,400 yd) runway extension, a full-length taxiway, commissioning of a fuel farm, an aviation academy etc. and developing city side facilities. Works for the Phase-I expansion are already progressing. A cargo terminal and cargo complex which was initially in Phase-II has been shifted to Phase I and is under construction. The Phase II expansion will happen from 2026–27 to 2045–46. It includes another runway and a dedicated domestic terminal at Veliamparamba, and a long flyover to link it with Moorkhanparamba.[72][81][82][83][84]

Management[edit | edit source]

Kannur International Airport is the second greenfield airport to be built on a public private partnership (PPP) platform in Kerala. The airport is managed by Kannur International Airport Ltd.(KIAL), a public company.[85] Venu V, IAS, is the current managing director of KIAL.[86] Chief minister of Kerala holds the post of chairman. The principle investor in KIAL, the Government of Kerala, owns 32.86% of the company's shares.[citation needed] Other shareholders are: 22.54% by State and Central Public Sector Undertakings, 9.39% by Airports Authority of India, 35.21% by others, including QIBs, Individuals, Companies, Cooperative, Banks/Societies, and other legal entities as approved by the Board of Directors from time to time.[citation needed]

Passenger terminal[edit | edit source]

Handloom model at the departure area

The airport has an integrated passenger terminal for both international and domestic travellers with a floor area of 97,000 m2 (1,040,000 sq ft) for arrival and departure separately. It is able to handle up to 2,000 passengers during peak hours with its unique swing facility. It features six aerobridges with 48 check-in counters, 32 emigration counters, 16 customs counters, four conveyor belts and access control inside the terminal. The passenger terminal will use the swing facility. The international gates are used for domestic operations when there are no international flights. The passenger terminal building has a double skin aluminium roofing system and efficient LED lighting adopting the green building concept.[87][65][88][81]

Cargo terminal[edit | edit source]

A cargo terminal complex having an 8-floor space of 32,000 m2 (340,000 sq ft) will also be constructed.[89][90]

Airlines and destinations[edit | edit source]

A GoAir Airbus A320neo taxiing to the airport's apron
AirlinesDestinations
Air India Express Abu Dhabi, Bahrain (Resumes on 02 April 2026), Bengaluru, Dammam (Resumes on 04 April 2026), Doha, Dubai–International, Jeddah (Resumes on 04 April 2026), Kuwait City (Resumes on 02 April 2026), Muscat, Ras Al Khaimah,[91] Riyadh, Sharjah, Thiruvananthapuram
IndiGo Abu Dhabi,[92] Bengaluru, Chennai, Delhi,[93] Doha, Fujairah,[94] Hyderabad, Kochi, Mumbai–Shivaji, Mumbai—Navi (begins 30 March 2026),[95][96]

Operational infrastructure[edit | edit source]

Kannur Airport has one runway, 07/25 which is 3,050 by 45 metres (10,007 by 148 feet).[97] Runway 07/25 orientation permits an obstacle-free approach. Runway 25's end will have Category I approach lighting and the 07 end will have simple approach lighting. The runway will be extended to 4,000 metres (13,000 ft) after the airport is commissioned. Land acquisition of about 260 acres is underway for this purpose. The runway will have a full-length parallel taxiway and its apron will allow 20 wide-bodied aircraft to park simultaneously.[98][82][99][100][81]

The airport's air navigation services and air traffic control will be handled by the Airports Authority of India (AAI). The ATC tower will be equipped with Doppler variable omni range and distance measuring equipment, air traffic system automation, instrument landing system, voice recorder, and a GPS clock system. It will have VHF communication facilities and equipment for obtaining radar signals from the Cochin International Airport. The tower is 30 metres (98 ft) high and has a floor area of 1,923 square metres (20,700 sq ft).[101][67][102]

Various weather monitoring, weather forecasting and alert systems are being installed at the airport by the India Meteorological Department (IMD). The Automated Weather Observing System (AWOS) for weather observations, is supplemented by climatological data, weather forecasting and aerodrome warning from IMD. The IMD will send minute-by-minute weather updates in the form of audio messages directly to pilots, instead of passing the information manually to the ATC and through them to the pilot. The information could include wind speed, gusts and direction, temperature and dew point, visibility, density, altitude, thunderstorm, lightning etc. ensuring smooth aircraft operation.[103]

The airport will have a 300 metres (330 yd)-long, 90 metres (98 yd)-wide runway end safety area (RESA) on both ends of the runway. This reduces the risk of casualties and damage to aircraft in the event of an undershoot, overshoot or excursion from the runway. The RESA is protected with a Reinforced Earth wall. The airport will have an isolation bay towards the 07 side. An isolation bay, with a diameter of 125 metres (137 yd) is a special parking space created for an aircraft facing an exigency like hijack or bomb threat.[104][105][106][81]

Ground handling in the airport will be managed by Air India Air Transport Services Ltd. (AI-ATSL).

Aviation fuel farm[edit | edit source]

The airport has a 28,000 square metres (33,000 sq yd) fuel farm constructed and operated as a joint venture company floated by KIAL and Bharat Petroleum Corporation Ltd. (BPCL) — the BPCL-KIAL Fuel Farm Private Ltd. The Rs. 17-crore fuel farm has underground tanks for aviation fuel storage and will provide fuel for aircraft operating from the airport. BPCL has a Rs. 170-crore stake in KIAL.[107]

MRO[edit | edit source]

Kannur Airport will have an aircraft maintenance, repair and overhaul unit- MRO facility. A large maintenance terminal is dedicated for this. The facility is expected to cater to both narrow and wide-bodied aircraft. The MRO will undertake maintenance work on aircraft and their components, such as jet engines, landing gear, air frames and components and will involve line maintenance and hangars.[108][81]

Enclaves[edit | edit source]

The airport will have an Indian Navy air enclave on ten acres of land. The location is a priority for the Navy since the Ezhimala Naval Academy, the only naval academy in India, and the largest in Asia, is just 60 kilometres (37 mi) away from the airport. Ezhimala is also a strategic defense location. The original demands for transfer of the ten acres of airport land to the Navy included having a representative from Southern Naval Command on KIAL's board of directors, to set up the enclave. This was dropped by the Navy. The land was transferred to the Navy on a long-term lease against token rent for establishing the enclave.[109][110][111]

The Indian Air Force will have a presence at the airport with a separate enclave set up on ten acres of land. Defense officials had approved the enclave in view of the airport's strategic location. Kannur Cantonment, the only Army Cantonment in Kerala is 30 kilometres (19 mi) away from the airport. The land provided on a long-term lease, against a token rent, is located beside the operational apron of the airport. Work on the enclave's hangars and administrative buildings is underway.[110]

An enclave will be set up by Indian Coast Guard (ICG) at the Kannur airport to augment air surveillance along the coast. India's first Coast Guard Academy is located at Azhikkal, 36 kilometres (22 mi) from the airport[citation needed]. Considering this, the strategic location and the proximity to the coast of the airport the ICG had sought 20 acres of airport land. The KIAL board authorized the airport's managing director to provide 10 acres on a long-term lease against token rent to establish the enclave.[110][112][113]

Aviation academy[edit | edit source]

An aviation academy will be set up in the airport by the Rajiv Gandhi Aviation Academy and Technology on two acres of land allotted for it. The institute will offer students courses in aeronautics and provide flight training.[114]

HAL helicopter manufacturing base[edit | edit source]

Hindustan Aeronautics Limited (HAL) had sought airport land from KIAL to have a manufacturing base for helicopters. 80 acres of land had been allotted by the board to HAL in 2014. The HAL complex will include helicopter manufacturing for exporting, helicopter maintenance and repair, and a helicopter pilot training centre.[108]

Law and Order[edit | edit source]

The airport comes under the jurisdiction of Mattanur Airport Police station under Kannur City Police established on 12 August 2018. The jurisdictional area coming inside the airport compound wall in Morkanparamaba in Keezhallur Panchayat and area of Kallerikkara ward of Mattanur Municipality coming inside the Airport compound wall. The whole area of the station is owned by KIAL. The magisterial jurisdiction of the station is Judicial First Class Magistrate Court, Mattanur.[115]

Ground transport[edit | edit source]

Pre-paid taxi service is available at the airport round the clock. KSRTC provides service to various destinations in Kannur, Kasaragod, Kozhikode and Malappuram districts from the airport. The nearest town is at Mattannur situated 5 km (3.1 mi) away from the airport which has bus connectivity to various parts of Kannur district, Kodagu district and Mysore. Autorickshaw service is available at the airport to Mattannur. The closest railway stations are at Thalassery (25 km [16 mi]) and Kannur (27 km [17 mi]) from the airport. Till date,[when?] there is no Uber or Ola Cabs service facility from the airport.

Future developments[edit | edit source]

The proposed Kannur-Mysore National Highway under Bharatmala project, passes through Airport provides easy access to the important cities and towns in Kerala and Karnataka states.[116][117]

Kerala government has given node for developing Mattanur-Kootupuzha road, Thalassery-Anjarakandy-Mattanur road, Kuttiady-Panoor-Mattanur road, Mananthavady-Mattanur road, Kannur-Airport roads for better connectivity.[118][119]

See also[edit | edit source]

References[edit | edit source]

  1. "'Come..let's fly from Kannur': Kerala's fourth international airport to open on Dec 9". 8 October 2018.
  2. "Annexure III – Passenger Data" (PDF). aai.aero. Retrieved 28 April 2025.
  3. "Annexure II – Aircraft Movement Data" (PDF). aai.aero. Retrieved 28 April 2025.
  4. "Annexure IV – Freight Movement Data" (PDF). aai.aero. Retrieved 28 April 2025.
  5. 5.0 5.1 "Kannur airport inauguration". OnManorama. Retrieved 9 December 2018.
  6. "Kannur airport has served one million passengers in nine months". The News Minute. 11 September 2019.
  7. "Kannur airport records 10 lakh passengers with 15-yr-old Singapore girl | Kozhikode News - Times of India". The Times of India. 11 September 2019.
  8. "Two million Passengers at Kannur International Airport | kannurairport". kannurairport.aero.
  9. Sajit, C. p (7 December 2019). "'Point of call' status still eludes KIAL". The Hindu – via www.thehindu.com.
  10. Nair, Vinod (19 December 2018). "SalamAir will fly to 19 cities next year".
  11. "Airline companies queuing up for Kannur". Mathrubhumi. 31 July 2016.
  12. "Gulf airlines blocked from flying to India's Kannur Int'l Airport". 23 January 2019.
  13. "Kerala government pushes for foreign airlines at Kannur airport". The Hindu. 1 September 2019 – via www.thehindu.com.
  14. Athira, Lakshmi (19 March 2025). "Kerala's Kannur airport reports Rs 742.77-crore loss over six years". The New Indian Express. Retrieved 2 July 2025.
  15. PTI (11 October 2024). "Centre yet to grant 'point of call' status to Kannur airport despite representations: Kerala govt". The Hindu. ISSN 0971-751X. Retrieved 2 July 2025.
  16. Bureau, The Hindu (12 January 2026). "Kannur airport recorded highest ever passenger traffic in 2025". The Hindu. ISSN 0971-751X. Retrieved 12 January 2026. {{cite news}}: |last= has generic name (help)
  17. "Kerala gets its 4th international airport at Kannur: 10-point cheat-sheet". www.timesnownews.com. 8 October 2018.
  18. "Watch: First trial passenger flight lands at new Kannur International Airport". The News Minute. 20 September 2018.
  19. Nazeer, Mohamed (20 September 2018). "Trial landing at Kannur airport". The Hindu – via www.thehindu.com.
  20. "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. 9 December 2018. Retrieved 9 December 2018.
  21. "First flight from Kannur airport flagged off". Mathrubhumi. 9 December 2018. Retrieved 9 December 2018.
  22. 22.0 22.1 "IX715 - Air India Express IX 715 Flight Tracker". FlightStats. Retrieved 9 December 2018.
  23. Sudhakaran, P (14 September 2015). "Kannur flew, way before its first airport - Times of India". The Times of India. Timesofindia.indiatimes.com. Archived from the original on 18 May 2017. Retrieved 24 December 2017.
  24. "Kannur saw flight landings even before Independence". The Indian Express. 10 December 2018. Retrieved 24 November 2020.
  25. "Kerala celebrates 75th anniversary of civil aviation". The Hindu. PTI. 29 October 2010. ISSN 0971-751X. Retrieved 24 November 2020.
  26. "VS lays foundation stone for Kannur international airport". The Hindu. 17 December 2010 – via www.thehindu.com.
  27. "Kannur airport set to be a dream come true". The Hindu. 21 November 2010 – via www.thehindu.com.
  28. "Kannur airport set to be a dream come true". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  29. "Kannur airport: land acquisition process on - KERALA". The Hindu. 22 August 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  30. "Land for airport: new rates sought - KERALA". The Hindu. 6 December 2011. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  31. "airport land map". The Hindu. 26 November 2012. ISSN 0971-751X. Archived from the original on 7 January 2018. Retrieved 8 December 2017.
  32. KERALA (17 January 2008). "Cabinet clearance for Kannur airport - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  33. KERALA (13 September 2008). "Land acquisition for Kannur airport from December - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  34. KERALA (3 October 2009). "Land for airport by January - KERALA". The Hindu. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  35. "VS lays foundation stone for Kannur international airport". The Hindu. 17 December 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  36. "Kannur International Airport". centreforaviation.com.
  37. "1st Trial Flight Lands In North Kerala, Oommen Chandy Says 'It Will Boost Development'". NDTV.com.
  38. "Kannur International Airport inauguration LIVE: First flight flagged off, operations commenced". The Indian Express. 9 December 2018. Retrieved 9 December 2018.
  39. 39.0 39.1 "First flight from Kannur airport flagged off". Mathrubhumi English. 9 December 2018. Retrieved 9 December 2018.
  40. "- ET TravelWorld". ETTravelWorld.com.
  41. "Kannur Airport operates 300 international flights and brings back 50000 Pravasis during covid pandemic".
  42. "Kannur Airport's Role in Bringign Back Pravasis".
  43. 43.0 43.1 "കണ്ണൂര്‍ വിമാനത്താവളത്തില്‍ ആദ്യമായി വിദേശവിമാനം; ചരിത്രത്തിന്റെ ഭാഗമായി കണ്ണൂര്‍ സ്വദേശിയും". Mathrubhumi. Archived from the original on 23 September 2020. Retrieved 6 January 2021.
  44. 44.0 44.1 Hareesh, P. C. (6 August 2020). "India-Kuwait temporary flight services to be operational from August 10". Mathrubhumi.
  45. "Fly Dubai flight carrying expats lands in Kannur". Mathrubhumi. Archived from the original on 5 December 2020. Retrieved 18 August 2020.
  46. "SalamAir's third charter flight by KMCC takes-off from Muscat to Kannur". 11 June 2020.
  47. 47.0 47.1 "Kannur Airport's Role in Bringing Back Pravasis" (PDF).
  48. "Clipping of deepikanewspaper - Deepika Kannur". epaper.deepika.com. Archived from the original on 5 April 2023. Retrieved 7 December 2020.
  49. "ഇത്തിഹാദിന്റെ ആദ്യ വിമാനത്തിന് കണ്ണൂരിൽ ഊഷ്മള വരവേൽപ്". ManoramaOnline (in മലയാളം).
  50. Yousuf, Kabeer (30 August 2020). "Oman Air touches down at Kannur International Airport".
  51. "Land acquisition process reviewed - KERALA". The Hindu. 17 August 2010. Retrieved 24 December 2017.
  52. "Kannur airport set to take wings - Today's Paper". The Hindu. 21 November 2010. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  53. "Kannur airport's first stage by 2014 - KERALA". The Hindu. 15 July 2011. Retrieved 24 December 2017.
  54. "CIAL to prepare project report for Kannur airport". The Hindu. 12 December 2011. Retrieved 24 December 2017.
  55. "Kannur airport project to be delayed - NATIONAL". The Hindu. 26 June 2012. Archived from the original on 17 January 2014. Retrieved 24 December 2017.
  56. "Kannur airport: Pact today - KERALA - the Hindu". The Hindu. 6 February 2012. Archived from the original on 7 January 2018. Retrieved 7 January 2018.>
  57. "KIAL signs pact with STUP for consultancy services - KERALA". The Hindu. 22 August 2012. Retrieved 24 December 2017.
  58. "Kannur airport: consultancy pact with STUP cancelled - NATIONAL". The Hindu. 7 September 2012. Retrieved 24 December 2017.
  59. "KIAL to invite fresh bids - KERALA". The Hindu. 13 September 2012. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  60. "Work on Kannur airport to begin soon - KERALA". The Hindu. 17 November 2012. Retrieved 24 December 2017.
  61. "Kannur airport in 3 years: Chandy - KERALA". The Hindu. 8 December 2012. Archived from the original on 31 August 2014. Retrieved 24 December 2017.
  62. "Kannur airport: work on EPC II in full swing - NATIONAL". The Hindu. 19 August 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  63. "KIAL, L&T ink Rs. 694-crore pact - KERALA". The Hindu. 27 November 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  64. "Antony flags off Kannur airport works". The Hindu. 2 February 2014. Archived from the original on 20 February 2014. Retrieved 24 December 2017.
  65. 65.0 65.1 "Tender approved for Kannur airport - KERALA". The Hindu. 26 June 2014. Retrieved 24 December 2017.
  66. "Kannur airport runway work on course". The Hindu. 16 June 2014. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  67. 67.0 67.1 "Hectic pace to Kannur airport work - KERALA". The Hindu. 26 March 2015. Retrieved 24 December 2017.
  68. "Kannur airport in take-off mode - NATIONAL". The Hindu. 14 August 2015. Retrieved 24 December 2017.
  69. "First test flight to Kannur airport deferred - KERALA". The Hindu. 8 December 2015. Retrieved 24 December 2017.
  70. "Fuel farm work begins at Kannur airport site". The Hindu. 23 December 2015. Retrieved 24 December 2017.
  71. "Minister rules out Kannur airport runway extension". The Hindu. 4 January 2016. Retrieved 24 December 2017.
  72. 72.0 72.1 "First flight to Kannur on 29 Feb". The Hindu. 17 February 2016. Archived from the original on 13 December 2017. Retrieved 24 December 2017.
  73. "All-party meet on KIAL land survey - KERALA". The Hindu. 20 August 2015. Retrieved 24 December 2017.
  74. "Kannur trial landing a success". The Hindu. 1 March 2016. Retrieved 24 December 2017.
  75. "First flight to land in Kannur today - KERALA". The Hindu. 29 February 2016. Retrieved 24 December 2017.
  76. "Political turmoil over Kannur airport project". The Hindu. 12 October 2015. Retrieved 24 December 2017.
  77. "Archived copy" (PDF). Archived from the original (PDF) on 1 July 2017. Retrieved 24 December 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  78. "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 24 December 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  79. "3,050-m runway ready in Kannur". The Hindu. 1 May 2016. Retrieved 24 December 2017.
  80. "Land acquisition for runway work soon: CM - KERALA". The Hindu. 8 August 2016. Retrieved 24 December 2017.
  81. 81.0 81.1 81.2 81.3 81.4 "Archived copy". Archived from the original on 3 April 2016. Retrieved 9 June 2016.{{cite web}}: CS1 maint: archived copy as title (link)
  82. 82.0 82.1 "With mega runway, Kannur airport in top four - NATIONAL". The Hindu. 9 September 2016. Retrieved 24 December 2017.
  83. "Kannur airport: Runway ready, final touch-up in progress | politics | Kannur Airport". English.keralakaumudi.com. 10 April 2017. Retrieved 24 December 2017.[dead link]
  84. "Airport consultant reviewing report". The Hindu. 26 November 2012. Archived from the original on 7 January 2018. Retrieved 24 December 2017.
  85. "Airport Project". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
  86. "Home-Kannur Airport". Archived from the original on 2 August 2018. Retrieved 25 May 2014.
  87. "Kannur airport to have 'swing' facility". The Hindu. 4 July 2014. Archived from the original on 8 July 2014. Retrieved 24 December 2017.
  88. "Archived copy" (PDF). Archived from the original (PDF) on 6 June 2017. Retrieved 23 November 2017.{{cite web}}: CS1 maint: archived copy as title (link)
  89. "Kannur airport gearing up for September launch - KERALA". The Hindu. 8 February 2017. Retrieved 24 December 2017.
  90. "Kannur airport by Sept next". The Hindu. 19 September 2017. Archived from the original on 20 September 2017. Retrieved 24 December 2017.
  91. "Air India Express 2Q24 Middle East Network Additions". AeroRoutes. 15 April 2024. Retrieved 15 April 2024.
  92. "IndiGo announces direct flights between Abu Dhabi and Kerala's Kannur". Zee Business. 30 March 2024. Retrieved 31 March 2024.
  93. "IndiGo to resume Kannur-Delhi daily flights from December 12". The Hindu. 24 November 2024. Retrieved 7 December 2024.
  94. "IndiGo Adds Fujairah Service From mid-May 2025". Aeroroutes. Retrieved 10 April 2025.
  95. "Oman flight suspension: IndiGo suspends Muscat–Kannur flights citing low seasonal demand". The Times of India. 20 August 2025.
  96. "IndiGo to start operations from Muscat to Kannur". thearabianstories. Retrieved 2 April 2025.
  97. "About Us". Kannurairport.in. Archived from the original on 8 June 2017. Retrieved 24 December 2017.
  98. "Kannur International Airport New Airport Profile | CAPA". Centreforaviation.com. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  99. "95 pc work completed in Kannur Airport, test flight in Feb | new airport in Kerala at Kannur". English.keralakaumudi.com. 17 December 2017. Retrieved 24 December 2017.[dead link]
  100. "Kannur airport take-off to be delayed - KERALA". The Hindu. 3 July 2017. Retrieved 24 December 2017.
  101. "Agreements signed for airport - KERALA". The Hindu. 21 November 2014. Retrieved 24 December 2017.
  102. "Kannur airport nearing take-off stage". The Hindu. 16 December 2017. Retrieved 24 December 2017.
  103. "Weather alert system for Kannur airport - KERALA". The Hindu. 20 September 2014. Retrieved 24 December 2017.
  104. "Flights to take off from Kannur in 2016 - KERALA". The Hindu. 7 December 2013. Archived from the original on 30 August 2014. Retrieved 24 December 2017.
  105. "Photo gallery - Construction of Reinforced Earth Wall at Resa 07 side in progress as on 20.02.2017". Kannurairport.in. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  106. "Licensing procedure for Kannur airport begins - KERALA". The Hindu. 5 September 2014. Archived from the original on 6 September 2014. Retrieved 24 December 2017.
  107. "Fuel farm work begins at Kannur airport site - KERALA". The Hindu. 23 December 2015. Retrieved 24 December 2017.
  108. 108.0 108.1 "Kannur International Airport - Malabar, Ready for Take Off?". Thedollarbusiness.com. Archived from the original on 15 December 2017. Retrieved 24 December 2017.
  109. "Norms relaxed for Naval Air Enclave - KERALA". The Hindu. 23 November 2012. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  110. 110.0 110.1 110.2 "Defence enclaves for Kannur airport - KERALA". The Hindu. 17 April 2014. Archived from the original on 26 June 2014. Retrieved 24 December 2017.
  111. "Campus". INA. Archived from the original on 24 October 2017. Retrieved 24 December 2017.
  112. "Coast Guard Academy to be ready in over 3 years: Director General - KERALA". The Hindu. 2 January 2014. Archived from the original on 22 December 2017. Retrieved 24 December 2017.
  113. "First Coast Guard academy to come up at Azheekkal". The Hindu. 27 February 2011. Retrieved 24 December 2017.
  114. "KIAL firm on December date for trial landing - KERALA". The Hindu. 13 October 2015. Retrieved 24 December 2017.
  115. "About - Mattanur Airport PS". keralapolice.gov.in.
  116. "Kannur-Mysuru corridor to be made NH". The Hindu. Retrieved 26 July 2017.
  117. "11 roads to be added in second phase of Bharatmala project". Times of India. Retrieved 15 July 2021.
  118. "Govt speeds up work of roads connecting Kannur airport". Times of India.
  119. "Steps to develop airport road". The Hindu. Retrieved 10 October 2019.

External links[edit | edit source]