Kochuveli–Lokmanya Tilak Terminus Garib Rath Express: Difference between revisions

From Bharatpedia, an open encyclopedia
>Vatsmaxed
No edit summary
 
imported>Rsjaffe
m (clean up, typo(s) fixed: , → ,)
 
Line 25: Line 25:
| baggage =
| baggage =
| other facilities=
| other facilities=
| stock = Standard [[Indian Railway]] [[ICF coaches]]
| stock = Standard [[Indian Railways]] [[ICF coaches]]
| gauge = {{RailGauge|1676mm|allk=on}}
| gauge = {{RailGauge|1676mm|allk=on}}
| el =
| el =
Line 76: Line 76:
The 12202 / 01 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]] covers the distance of 1812 kilometres in 27 hours as 12202 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]]& in 27 hours 30 mins as 12201 [[Lokmanya Tilak Terminus]] [[Kochuveli railway station|Kochuveli]] [[Garib Rath Express]].
The 12202 / 01 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]] covers the distance of 1812 kilometres in 27 hours as 12202 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]]& in 27 hours 30 mins as 12201 [[Lokmanya Tilak Terminus]] [[Kochuveli railway station|Kochuveli]] [[Garib Rath Express]].


During Monsoon , as this train crosses in [[Konkan Railway]]  route,there is a speed restrictions in this route.It covers the distance of 1812 kilometres in 30 hours 10 mins as 12202 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]]& in 30 hours 35 mins as 12201 [[Lokmanya Tilak Terminus]] [[Kochuveli railway station|Kochuveli]] [[Garib Rath Express]]. However, monsoon time table refers w.e.f 10 June to 31 October .
During Monsoon, as this train crosses in [[Konkan Railway]]  route,there is a speed restrictions in this route.It covers the distance of 1812 kilometres in 30 hours 10 mins as 12202 [[Kochuveli railway station|Kochuveli]] [[Lokmanya Tilak Terminus]] [[Garib Rath Express]]& in 30 hours 35 mins as 12201 [[Lokmanya Tilak Terminus]] [[Kochuveli railway station|Kochuveli]] [[Garib Rath Express]]. However, monsoon time table refers w.e.f 10 June to 31 October .


The speed calculation however does not take into account the inflation of distance (approximately 40%) on the [[Konkan Railway]] network.
The speed calculation however does not take into account the inflation of distance (approximately 40%) on the [[Konkan Railway]] network.


As the average speed of the train is above {{convert|55|km/h|0|abbr=on}}, as per [[Indian Railway]] rules, its fare includes a superfast surcharge.
As the average speed of the train is above {{convert|55|km/h|0|abbr=on}}, as per [[Indian Railways]] rules, its fare includes a superfast surcharge.


==Routeing==
==Routeing==
Line 108: Line 108:
{{Garib Rath Express}}
{{Garib Rath Express}}


{{DEFAULTSORT:Kochuveli-Lokmanya Tilak Terminus Garib Rath Express}}
[[Category:Rail transport in Maharashtra]]
[[Category:Rail transport in Maharashtra]]
[[Category:Rail transport in Goa]]
[[Category:Rail transport in Goa]]

Latest revision as of 05:51, 2 August 2021

Kochuveli Lokmanya Tilak Terminus Garib Rath Express
Coachboard of Kochuveli Mumbai LTT Garib Rath Express.jpg
Overview
Service typeGarib Rath
First serviceJanuary 31, 2008; 17 years ago (2008-01-31)
Current operator(s)Southern Railway zone
Route
StartKochuveli (KCVL)
Stops23
EndLokmanya Tilak Terminus (LTT)
Distance travelled1,812 km (1,126 mi)
Average journey time27 hours 35 minutes (approx.)
Service frequencyBi-weekly
Train number(s)12202 / 12201
On-board services
Class(es)AC 3 tier, AC Chair Car
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesNo Pantry car
Technical
Rolling stockStandard Indian Railways ICF coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed66.50 km/h (41 mph) (Average)
Route map
(Kochuveli - Mumbai LTT) Express and Garib Rath Express route map.png

Kochuveli Lokmanya Tilak Terminus Garib Rath Express is a Superfast Express express train of the Garib Rath Express category belonging to Indian Railways - Southern Railway zone that runs between Kochuveli and Lokmanya Tilak Terminus in India.

Coaches[edit]

Coachboard of kochuveli lokmanya tilak terminus garib rath express

The 12202 / 01 Kochuveli Lokmanya Tilak Terminus Garib Rath Express presently has 11 AC 3 tier & 2 AC Chair Car coaches.

It does not have a Pantry car coach.

As is customary with most train services in India, Coach Composition may be amended at the discretion of Indian Railways depending on demand.

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
GL2 J2 G11 G10 G9 G8 G7 G6 G5 G4 G3 G2 G1 J1 GL1

Service[edit]

The 12202 / 01 Kochuveli Lokmanya Tilak Terminus Garib Rath Express covers the distance of 1812 kilometres in 27 hours as 12202 Kochuveli Lokmanya Tilak Terminus Garib Rath Express& in 27 hours 30 mins as 12201 Lokmanya Tilak Terminus Kochuveli Garib Rath Express.

During Monsoon, as this train crosses in Konkan Railway route,there is a speed restrictions in this route.It covers the distance of 1812 kilometres in 30 hours 10 mins as 12202 Kochuveli Lokmanya Tilak Terminus Garib Rath Express& in 30 hours 35 mins as 12201 Lokmanya Tilak Terminus Kochuveli Garib Rath Express. However, monsoon time table refers w.e.f 10 June to 31 October .

The speed calculation however does not take into account the inflation of distance (approximately 40%) on the Konkan Railway network.

As the average speed of the train is above 55 km/h (34 mph), as per Indian Railways rules, its fare includes a superfast surcharge.

Routeing[edit]

The 12202 / 01 Kochuveli Lokmanya Tilak Terminus Garib Rath Express runs from Kochuveli, Kollam Junction, Kayamkulam Jn, Chengannur, Tiruvalla, Kottayam, Ernakulam Town, Thrissur, Shoranur Junction, Kozhikode, Kannur, Mangalore Junction, Udupi, Bijoor -Byndoor, Ankola, Karwar, Madgaon, Karmali, Sawantwadi Road, Ratngiri, Panvel, Thane to Lokmanya Tilak Terminus.

Traction[edit]

As most of the route is yet to be electrified, it is hauled by a Ernakulam (ERS) based WDM 3A from Lokmanya Tilak Terminus to Mangalore Junction and then from Mangalore Junction to Kochuveli , it is hauled by Erode or Arakkonam based WAP-4 for the remainder journey. Once Konkan railway is fully electrified, this train is expected to get an end to end electric locomotive.

See also[edit]

References[edit]

  • "GARIBRATH & YUVA TRAIN LIST". indianrail.gov.in. Archived from the original on 13 December 2015. Retrieved 28 April 2014.
  • "EQ in trains to be streamlined soon". newindianexpress.com. Retrieved 28 April 2014.
  • "Train derails; cancellations, diversions on Konkan Rly route | Business Standard". business-standard.com. Retrieved 28 April 2014.

External links[edit]

Template:Garib Rath Express