Pune Monorail
![]() | This article needs to be updated.(April 2021) |
Overview | |
---|---|
Owner | N/A |
Locale | Pune, Maharashtra |
Transit type | straddle-beam Monorail |
Number of lines | 2 (planned) |
Number of stations | 18 (planned) |
Daily ridership | 71,557 (Estd.) |
Chief executive | N/A |
Headquarters | N/A |
Operation | |
Began operation | N/A |
Operator(s) | N/A |
Number of vehicles | 15 |
Train length | N/A |
Headway | 3 minutes |
Technical | |
System length | 52 km |
Track gauge | N/A |
Electrification | 750 V DC |
Average speed | 30 km/h (19 mph) |
Top speed | 80 km/h (50 mph) |
Pune Monorail was a proposed monorail system for the city of Pune.
Background[edit]
The Pune Municipal Corporation decided to construct a monorail system to reduce the number of private vehicles along the route. The monorail will be taken up by the Pune Municipal Corporation.
Network[edit]
There are 2 lines proposed to be built:[1]
Ring Road line[edit]
The first monorail line will run along the proposed High Capacity Mass Transit Route (HCMTR) project. Length of this corridor will be 30 km[2]
Warje-Kharadi line[edit]
Warje to Kharadi, 22 km long route.
References[edit]
- ↑ "Monorail News Briefs". Monorails.org. Archived from the original on 13 June 2010. Retrieved 16 September 2010.
- ↑ "Civic body nod for 30-km inner ring road, 52-km monorail - Indian Express".