Chord Line, Tamil Nadu

From Bharatpedia, an open encyclopedia

Chord Line
Viluppuram Railway Junction Main Building.jpg
Viluppuram railway station the starting point of Chord Line, Tamil Nadu
Overview
Other name(s)Viluppuram - Trichy railway line
Native nameகார்டு லைன்
StatusOperating
OwnerIndian Railways
LocaleTamil Nadu
TerminiViluppuram Junction (VM)
Tiruchirappalli Junction (TPJ)
Stations29
Websitewww.sr.indianrailways.gov.in
Service
TypeRegional rail
Heavy rail
Light rail
Services1
Route number21/21A[1]
Operator(s)Southern Railway zone
Depot(s)Golden Rock
History
Opened1 February 1929; 95 years ago (1929-02-01)
Technical
Line length178 km (111 mi)
Number of tracksDouble Line (Triple line between GOC and TPJ)
Track gauge1,676 mm (5 ft 6 in)
Old gauge1,000 mm (3 ft 3+38 in)
Loading gauge4,725 mm × 3,660 mm (15 ft 6.0 in × 12 ft 0.1 in) (BG)[2]
Electrification25 kV AC 50 Hz
Operating speed110 km/h (68 mph)
Route map
Template:Chord Line, Tamil Nadu

The Chord Line connects Viluppuram Junction and Tiruchirappalli Junction in Tamil Nadu. It is the shortest route connecting Chennai Egmore and Trichy. This rail route is 40 km shorter than the main line.

History[edit]

Until 1927, Viluppuram Junction and Tiruchirappalli Junction were only connected by Main line that traversed through Kumbakonam and Mayavaram, which was 240 kilometres (150 mi). Hence, the need for shorter route arose and construction began on 22 August 1927 for a new railway line via Virudhachalam Junction in phases. Initially, the stretch between Viluppuram Junction and Virudhachalam were completed and opened on 1 December 1927, the Srirangam - Golden Rock stretch on 22 August 1927, Bikshandarkoil - Srirangam stretch on 12 December 1927 and the entire stretch began its operations since 1 February 1929. This line gradually reduced the Madras - Colombo journey by around four hours.[3]

Gauge conversions[edit]

The conversion from metre gauge to broad gauge was effected during 1992-93 and completed during September 1998.[4]

Electrification[edit]

This stretch was proposed for electrification phase by phase by CORE. The electrification was completed during 2010.[5]

Operations[edit]

Passenger services[edit]

The line experiences a heaviest traffic[6] handling about 30 passenger and 56 express trains passing through every day in addition to goods train, particularly during night.[7][8][9]

Despite the fact that multiple south Tamil Nadu bound trains pass via chord line, there are no 'A' grade stations in the chord line between Trichy and Villupuram.

Freight services[edit]

The line has a number of Industrial establishments[10] which utilises their nearby railway stations for their logistics and transports such as Central Workshop (Golden Rock), Cement and gypsum factories at Trichy, Perambalur and Ariyalur,[11][12][13] and the Sugar factories at Villupuram and Vridhachalam,[14]

References[edit]

  1. "Trains at a Glance July 2013 - June 2014". Indian Railways. Retrieved 1 January 2014.
  2. J S Mundrey (2010). Railway Track Engineering (Fourth ed.). New Delhi: Tata McGraw Hill. p. 7. ISBN 978-0-07-068012-8. Retrieved 1 January 2014.
  3. R. P. Saxena. "Indian Railway History Time line". Irse.bravehost.com. Archived from the original on 14 July 2012. Retrieved 1 January 2014.
  4. "Works And Contract Management". Comptroller and Auditor General of India. Archived from the original on 1 January 2014. Retrieved 1 January 2014.
  5. "Electrification work from Villupuram to Tiruchi completed: E. Ahamed". The Hindu. 12 January 2010. Retrieved 1 January 2014.
  6. R.Rajaram (15 May 2013). "Dindigul-Villupuram project set to cross another milestone". The Hindu. Retrieved 1 January 2014.
  7. R.Rajaram (10 July 2010). "Tiruchi-Chennai line to get decongested". The Hindu. Retrieved 1 January 2014.
  8. "Doubling work on 25-km stretch completed in Trichy division". The Times of India. 16 May 2013. Archived from the original on 27 December 2013. Retrieved 1 January 2014.
  9. "Kallakudi Palanganatham-Ariyalur railway line nearing completion". The Hindu. 16 August 2013. Retrieved 1 January 2014.
  10. "Southern Railway - Tiruchchirappalli Division" (PDF). Southern Railway zone. Retrieved 1 January 2014.
  11. "Analysis of alternatives" (PDF). Tamil Nadu Road Sector Project. p. 33. Archived from the original (PDF) on 3 March 2016. Retrieved 1 January 2014.
  12. M. V. L. Manikantan (21 December 2013). "Proposed Karaikal-Peralam line to boost freight traffic". The Hindu. Retrieved 1 January 2014.
  13. T. E. Raja Simhan (1 February 2010). "Karaikal scores high on rail connectivity". The Hindu. Business Line. Retrieved 1 January 2014.
  14. W. Francis; Frederick Nicholson; C. S. Middlemiss; C. A. Barber; E. Thurston; G. H. Stuart (2002). Gazetteer of South India. New Delhi: Mittal Publications. p. 127. Retrieved 1 January 2014.

External links[edit]

Information red.svg
Scan the QR code to donate via UPI
Dear reader, We kindly request your support in maintaining the independence of Bharatpedia. As a non-profit organization, we rely heavily on small donations to sustain our operations and provide free access to reliable information to the world. We would greatly appreciate it if you could take a moment to consider donating to our cause, as it would greatly aid us in our mission. Your contribution would demonstrate the importance of reliable and trustworthy knowledge to you and the world. Thank you.

Please select an option below or scan the QR code to donate
₹150 ₹500 ₹1,000 ₹2,000 ₹5,000 ₹10,000 Other