Viramgam–Surendra Nagar section

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Viramgam–Surendra Nagar section
Overview
StatusOperational
OwnerIndian Railways
LocaleGujarat
TerminiViramgam
Surendranagar
Service
Operator(s)Western Railway
History
Opened1872
Technical
Track length65 km (40 mi)
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
Operating speed100 kmph

The Viramgam–Surendranagar section covers a distance of 65 km in Gujarat.

Template:Viramgam–Surendra Nagar section

History[edit]

During 19th century Viramgam railway station owned by BB&CI. During which Ahmedabad–Viramgam section was laid. In 1872 BB&CI line was extended to Surendranagar. Later Broad gauge network up to Surendranagar was extended in 1879 by BB & CI Railway[1] The gauge conversion of Viramgam–Hapa section in the year 1980.[2]

Doubling[edit]

Doubling of Viramgam Surendranagar section has been completed since October 2015. Trains have started to ply on the newly laid up line.

References[edit]

  1. "Irfca History part-2".
  2. "Irfca History part-5".