Created by Md. Toslim Bhuiyan Prantik
Last edited May 7, 2026


Golden Line
Overview
Other name(s)Line 10, Line 11
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
TerminiLine 10 (Main Line): Terminal 1-IGI Airport
Tughlakabad
Line 11 (Branch): Lajpat Nagar
Saket G Block
StationsLine 10 (Main Line): 19
Elevated: 7
Underground: 12
Line 11 (Branch): 8
Elevated: 8
Service
TypeRapid transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
History
Planned openingLine 10 (Main Line): 2026; 0 years ago (2026)[1],
Line 11 (Branch): Approved
Technical
Line length38.17 km (23.72 mi)
Line 10 (Main Line): 29.785 km (18.508 mi),
Line 11 (Branch): 8.385 km (5.210 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationTemplate:25 kV 50 Hz overhead catenary
Route map
Template:Delhi Metro Golden Line Route

The Golden Line (Line 10 and Line 11) is a rapid transit line of the Delhi Metro currently under-construction. It will start from Delhi Aerocity and end in Tughlakabad.[2] Further extensions to Kalindi Kunj and Terminal 1-IGI Airport have also been approved as part of Phase 5A extension. The main line (Line 10) will be 29.785 km (18.508 mi) long with 19 stations, out of which seven will be elevated and 12 will be underground. The branch line (Line 11) will be 8.385 km (5.210 mi) long with eight stations, all the stations will be elevated.

It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and partial operations are expected by 2026-end.

History[edit | edit source]

The Golden Line, initially named as Silver Line, was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about 104 km (65 mi) have been planned to be added to the metro network, out of which the Golden Line would cover southern Delhi at a length of 20.2 km (12.6 mi). The plans were finalized for implementation by the Government of Delhi in December 2018; this time the length of the Golden Line increased to 23.6 km (14.7 mi).[3] In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Golden Line began from April 2019, and was completed by three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic. Hence, construction was started by Afcons Infrastructure and Larsen & Toubro in June 2022.[4][5] It was expected to be completed by 2024/25, which has been pushed to 2026-end.

In November 2020, the DMRC changed the alignment of the Golden Line as per the instructions of the Archaeological Survey of India (ASI) to circumvent the Qutb Minar and the Mehrauli Archaeological Park, so to avoid any harm to these critical historical sites during construction and operation.[6] As per the initial plan, the line was proposed to be extended to Terminal 1 of Indira Gandhi International Airport, in order to provide commuters a faster and direct link to the airport's premises. The proposal was approved by the Government of Delhi after the DMRC created and showed a Detailed Project Report (DPR) in December 2023, thereby increasing the line's length to 25.82 km (16.04 mi).[7][8] The name of the line was changed from 'Silver Line' to 'Golden Line' in January 2024.[9][10]

The Sarita Vihar Depot serving the Violet Line is being modified to handle trains for the Golden Line also. Trainsets have started arriving at the depot as of April 2026.

Stations[edit | edit source]

The stations being built on the Golden Line are:[6][11]

Main Line (Line 10)[edit | edit source]

colspan="10" style="background:#Template:Rail color;" |Golden Line
# Station Name Opening Interchange Connection Station Layout Platform Level Type
English Hindi
1 Template:Stl[12] टर्मिनल 1 आई.जी.आई एयरपोर्ट 2029 Airport interchange IGI Airport (T-1)
Template:Rcb
Underground Island
2 Template:Stl दिल्ली एरोसिटी 2026 Template:Rcb Underground Island
3 Template:Stl महिपालपुर 2026 None Underground Side
4 Template:Stl वसंत कुंज 2026 None Underground Side
5 Template:Stl किशनगढ़ 2026 None Underground Side
6 Template:Stl छत्तरपुर 2026 Template:Rcb Underground Island
7 Template:Stl छत्तरपुर मंदिर 2026 None Underground Side
8 Template:Stl इग्नू 2026 None Underground Island
9 Template:Stl नेब सराय 2026 None Underground Island
10 Template:Stl[13] साकेत जी ब्लॉक 2026 Template:Rcb
(Line 11)
Elevated Side
11 Template:Stl अम्बेडकर नगर 2026 None Elevated Side
12 Template:Stl ख़ानपुर–वायुसेनाबाद 2026 None Elevated Side
13 Template:Stl संगम विहार–तिगड़ी 2026 None Elevated Side
14 Template:Stl आनंदमयी मार्ग जं. 2026 None Underground Side
15 Template:Stl तुग़लक़ाबाद रेलवे कॉलोनी 2026 None Underground Island
16 Template:Stl तुग़लक़ाबाद स्टेशन 2026 Template:Rcb

upTughlakabad

Underground Island
17 Template:Stl[12] सरिता विहार डिपो 2029 None Elevated Side
18 Template:Stl[12] मदनपुर खादर 2029 None Elevated Side
19 Template:Stl[12] कालिंदी कुंज 2029 Template:Rcb Elevated Side

Branch Line (Line 11)[edit | edit source]

colspan="10" style="background:#Template:Rail color;" |Golden Line Branch
# Station Name Opening Interchange Connection Station Layout Platform Level Type
English Hindi
1 Template:Stl[13] साकेत जी ब्लॉक Approved Template:Rcb
(Phase 4 - Under Construction)
Elevated Side
2 Template:Stl पुष्प विहार Approved None Elevated Side
3 Template:Stl साकेत डिस्ट्रिक्ट सेंटर Approved None Elevated Side
4 Template:Stl[13] पुष्पा भवन Approved None Elevated Side
5 Template:Stl चिराग दिल्ली Approved Template:Rcb Elevated Side
6 Template:Stl ग्रेटर कैलाश-1 Approved None Elevated Side
7 Template:Stl एंड्रयूज़ गंज Approved None Elevated Side
8 Template:Stl लाजपत नगर Approved Template:Rcb
Template:Rcb
Elevated Side

Project timeline[edit | edit source]

Main route: IGI Aerocity to Tughlakabad[edit | edit source]

  • 2026 Apr: 73.33% overall and 78% civil work are complete with 5 tunnel boring machines at work. The whole Aerocity-Tughlakabad main route will be complete by end of 2026.[14][15]

Northwest extension: IGI Aerocity to IGI Airport T1 intersection with Magenta Line[edit | edit source]

Eastwards extension: Tughlakabad to Kalindi Kunj intersection with Magenta Line[edit | edit source]

Train Info[edit | edit source]

colspan="2" style="background:#Template:Rail color;" |Golden Line
Rakes Alstom Metropolis
Train Length 3/6 coaches
Train Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Electrification 25 kV 50 Hz AC through overhead catenary (OHE)
Train's Maximum Speed 100 km/h
Train Operation

See also[edit | edit source]

References[edit | edit source]

  1. "Silver to Gold — Why Delhi Metro changed the colour code of this much awaited line". The Indian Express. 29 January 2024. Retrieved 29 January 2024.
  2. "Delhi's Airport Metro set for silver line extension to terminal 1". Construction World. 12 January 2024. Retrieved 14 January 2024.
  3. "Delhi Metro's Much-awaited Phase 4 Gets AAP Govt's Nod, Likely to be Ready by 2024". News18. 20 December 2018. Retrieved 29 January 2024.
  4. "Delhi: Covid, green concerns put Phase-IV in low gear; push targets back". The Times of India. 14 June 2022. Retrieved 16 June 2022.
  5. "Afcons Begins Work on Delhi Metro Silver Line's Underground Section". The Metro Rail Guy. 15 June 2022. Retrieved 29 January 2024.
  6. 6.0 6.1 "Delhi Metro steers clear of Qutub Minar". The Times of India. 2 December 2020. ISSN 0971-8257. Retrieved 20 December 2023.
  7. "Delhi Metro's Silver Line to Aerocity may be extended to terminal 1". The Times of India. 19 December 2023. ISSN 0971-8257. Retrieved 19 December 2023.
  8. "Good News For Air Travellers! Delhi Metro's Silver Line To Aerocity To Be Extended To Terminal 1". Times Now. 19 December 2023. Retrieved 19 December 2023.
  9. "DMRC changes colour code of upcoming Delhi Aerocity–Tughlakabad Metro corridor". The Statesman. 29 January 2024. Retrieved 29 January 2024.
  10. "Delhi Metro Phase 4 – Information, Route Maps, Tenders & Updates". The Metro Rail Guy. Retrieved 29 January 2024.
  11. "Delhi Metro map". www.delhimetrorail.com. Retrieved 14 March 2026.
  12. 12.0 12.1 12.2 12.3 "Union Cabinet approves Delhi Metro expansion, 13 new stations to come up". Times of India. 25 December 2025. Retrieved 25 December 2025.
  13. 13.0 13.1 13.2 "Lajpat-Saket Metro corridor sees action after long wait in Delhi". Indian Express. 13 December 2025. Retrieved 25 December 2025.
  14. Work on Golden Line to be completed by year-end: Officials, MSN News, 20 Apr 2026.
  15. "Delhi Metro's Golden Line corridor reaches key tunneling milestone". Hindustan Times. 8 June 2025. Retrieved 15 December 2025.
  16. "Delhi: Metro link for IGI airport's T1, T3 moves ahead". Hindustan Times. 22 August 2025. Retrieved 15 December 2025.
  17. 17.0 17.1 Three new corridors, 13 stations: All about Magenta Line that will become Delhi Metro's longest, Feb 2025.