Created by Monkbot
Last edited September 5, 2023

Patna Monorail
Overview
LocalePatna, Bihar
Transit typestraddle-beam Monorail
Number of lines4 (planned)
Daily ridership32,000 (Estd.)
Operation
Began operationGovernment of Bihar preferred metro rail over mono rail
Train length4 coaches
Technical
System length32 kilometers (20 mi)
Electrification750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

Patna Monorail was a proposed monorail system for the city of Patna.[1][2]

Network[edit | edit source]

There were 4 lines proposed to be built. RITES, the consultancy arm of Indian Railways had begun soil inspection as well as ground survey for the monorail network.[3][4]

Project detail[edit | edit source]

The total estimated cost of the project was ₹2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna would be 32 km and in the first phase route length between 20 km and 25 km was to be completed.[5]

As of 2021 the project has not commenced.

See also[edit | edit source]

References[edit | edit source]

  1. ↑ "Mono-Rail for Patna soon". Samaylive.com. 28 December 2010. Retrieved 11 January 2011.
  2. ↑ Monorail News Briefs Archived 13 June 2010 at the Wayback Machine
  3. ↑ RITES begins ground survey for monorail in Patna - Rediff.com Business
  4. ↑ Monorail ground survey tees off - Yahoo! News India
  5. ↑ "Capital monorail project shifts gear". The Telegraph. Calcutta, India. 24 December 2011.{{cite news}}: CS1 maint: deprecated archival service (link)