Mumbai–Hyderabad high-speed rail corridor: Difference between revisions

From Bharatpedia, an open encyclopedia
->Jarrod Baniqued
(Fixed grammar)
 
No edit summary
 
Line 62: Line 62:
The '''Mumbai–Hyderabad High Speed Rail Corridor''' is a planned [[high-speed rail]] line connecting India's economic hub [[Mumbai]] with the city of [[Hyderabad]]. When completed, it will be one of key links in India's high-speed rail line network along with [[Mumbai–Ahmedabad high-speed rail corridor|Mumbai-Ahmedabad]] line.<ref>{{cite web|url=http://articles.economictimes.indiatimes.com/2015-06-23/news/63746148_1_feasibility-study-jica-bullet-train-project|title=JICA presents draft report on bullet train project to joint committee|work=timesofindia-economictimes}}</ref>
The '''Mumbai–Hyderabad High Speed Rail Corridor''' is a planned [[high-speed rail]] line connecting India's economic hub [[Mumbai]] with the city of [[Hyderabad]]. When completed, it will be one of key links in India's high-speed rail line network along with [[Mumbai–Ahmedabad high-speed rail corridor|Mumbai-Ahmedabad]] line.<ref>{{cite web|url=http://articles.economictimes.indiatimes.com/2015-06-23/news/63746148_1_feasibility-study-jica-bullet-train-project|title=JICA presents draft report on bullet train project to joint committee|work=timesofindia-economictimes}}</ref>


Set to be the third high-speed rail line project of India involving [[Mumbai]], this project will cut short the travel time between the two cities from existing 15-hour-journey to a mere 3 and a half hour journey. The terminal for this corridor may be built in [[Navi Mumbai]], which is planned to be integrated with the currently under-construction [[Navi Mumbai International Airport|international airport]]. Besides the airport, it will be linked with Navi Mumbai's [[Navi Mumbai Metro|metro]] and the connectivity is further set to expand with a connection to the [[Mumbai Trans Harbour Link]], work on which is underway. <ref name="top"></ref>
Set to be the third high-speed rail line project of India involving [[Mumbai]], this project will cut short the travel time between the two cities from existing 15-hour-journey to a mere 3 and a half hour journey. The terminal for this corridor may be built in [[Navi Mumbai]], which is planned to be integrated with the currently under-construction [[Navi Mumbai International Airport|international airport]]. Besides the airport, it will be linked with Navi Mumbai's [[Navi Mumbai Metro|metro]] and the connectivity is further set to expand with a connection to the [[Mumbai Trans Harbour Link]], work on which is underway.<ref name="top"></ref>


==Stations==
==Stations==
Planned Stations-
Planned Stations - '''[[Navi Mumbai]]''', [[Lonavla]], [[Pune]], [[Baramati]], [[Akluj]], [[Pandharpur]], '''[[Solapur]]''', [[Kalaburagi]], [[Vikarabad]] and '''[[Hyderabad]]'''.
'''[[Navi Mumbai]]''', [[Lonavla]], [[Pune]], [[Baramati]], [[Akluj]], [[Pandharpur]], '''[[Solapur]]''', [[Kalaburagi]] , [[Zahirabad]] and '''[[Hyderabad]]'''.


==See also==
==See also==
Line 75: Line 74:


==References==
==References==
{{reflist}}
{{reflist}}https://www.thehindubusinessline.com/news/hyd-mumbai-high-speed-rail-track-dpr-to-be-ready-in-6-months/article37561446.ece/amp/


==External links==
==External links==

Latest revision as of 12:52, 17 March 2022

Mumbai–Hyderabad High Speed Rail Corridor
Overview
StatusApproved, LiDar survey in progress
OwnerIndian Railways
Locale
TerminiMumbai
Hyderabad
Stations10
Websitewww.nhsrcl.in
Service
TypeHigh-speed rail
Operator(s)National High Speed Rail Corporation Limited
Rolling stockE5 Series Shinkansen
History
Planned opening2030; 5 years' time (2030) [1]
Technical
Line length711 km (442 mi)
CharacterTBD (Elevated, underground, and grade-separated)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV AC, 50 Hz, overhead catenary
Operating speed350[2] km/h (220 mph)
Route map
Template:Mumbai–Hyderabad high-speed rail corridor

The Mumbai–Hyderabad High Speed Rail Corridor is a planned high-speed rail line connecting India's economic hub Mumbai with the city of Hyderabad. When completed, it will be one of key links in India's high-speed rail line network along with Mumbai-Ahmedabad line.[3]

Set to be the third high-speed rail line project of India involving Mumbai, this project will cut short the travel time between the two cities from existing 15-hour-journey to a mere 3 and a half hour journey. The terminal for this corridor may be built in Navi Mumbai, which is planned to be integrated with the currently under-construction international airport. Besides the airport, it will be linked with Navi Mumbai's metro and the connectivity is further set to expand with a connection to the Mumbai Trans Harbour Link, work on which is underway.[2]

Stations[edit]

Planned Stations - Navi Mumbai, Lonavla, Pune, Baramati, Akluj, Pandharpur, Solapur, Kalaburagi, Vikarabad and Hyderabad.

See also[edit]

References[edit]

  1. "Railway Budget 2021: Indian Railways to focus on new bullet train networks in coming years?". The Times of India. 23 January 2021.
  2. 2.0 2.1 "Mumbai-Hyderabad bullet train terminal could be at Navi Mumbai airport". Times of India. 27 December 2020.
  3. "JICA presents draft report on bullet train project to joint committee". timesofindia-economictimes.

https://www.thehindubusinessline.com/news/hyd-mumbai-high-speed-rail-track-dpr-to-be-ready-in-6-months/article37561446.ece/amp/

External links[edit]

Template:High-speed rail in India

Template:Telangana topics