Created by Azuredivay
Last edited March 7, 2026
>Azuredivay
mNo edit summary
 
Gstnit (talk | contribs)
fixes
 
(5 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Short description|List of Expressways in India}}
{{Short description|none}}
{{See also|National highways of India}}
{{For|Highways of India|National highways of India}}
{{Use dmy dates|date=September 2020}}
{{Use dmy dates|date=September 2020}}
{{Use Indian English|date=June 2016}}
{{Use Indian English|date=June 2016}}
{{Infobox highway system
| title      = Expressways of India
| agencyname =
| country    = IND
| markers    = [[File:NE1-IN.svg|70px]]
[[File:NE2-IN.svg|70px]]
| caption    = Expressway signs for [[Ahmedabad–Vadodara Expressway|NE1]] and [[Eastern Peripheral Expressway|NE2]]
{{Maplink|frame=yes|plain=yes|frame-align=center|frame-width=280|frame-height=350|
|type=line|stroke-width=1|id=Q2043153
|type2=line|stroke-width2=1|id2=Q55609320
|type3=line|stroke-width3=1|id3=Q3633431
|type4=line|stroke-width4=1|id4=Q55624116
|type5=line|stroke-width5=1|id5=Q286044
|type6=line|stroke-width6=1|id6=Q5155394
|type7=line|stroke-width7=1|id7=Q5155635
|type8=line|stroke-width8=1|id8=Q5330149
|type9=line|stroke-width9=1|id9=Q7112001
|type10=line|stroke-width10=1|id10=Q7112001
|type11=line|stroke-width11=1|id11=Q5091427
|type12=line|stroke-width12=1|id12=Q7112004
|type13=line|stroke-width13=1|id13=Q85741341
|type14=line|stroke-width14=1|id14=Q60762572
|type15=line|stroke-width15=1|id15=Q47089857
|type16=line|stroke-width16=1|id16=Q16058235
|type17=line|stroke-width17=1|id17=Q48730051
|type18=line|stroke-width18=1|id18=Q19891290
|type19=line|stroke-width19=1|id19=Q6972545
|type20=line|stroke-width20=1|id20=Q6444347
|type21=line|stroke-width21=1|id21=Q6444347
|type22=line|stroke-width22=1|id22=Q8048110
|type23=line|stroke-width23=1|id23=Q86751029
|type24=line|stroke-width24=1|id24=Q60791816
|type25=line|stroke-width25=1|id25=Q7047609
|type26=line|stroke-width26=1|id26=Q24906324
|type27=line|stroke-width27=1|id27=Q25352227
|type28=line|stroke-width28=1|id28=Q7058857
|type29=line|stroke-width29=1|id29=Q85740166
|type30=line|stroke-width30=1|id30=Q25212372
}}
| map_custom = yes
| map_notes = Current operational expressways in India
| maint      = [[Ministry of Road Transport and Highways]]
| length_km  = 6059
| formed    = 2002
| label1    = [[controlled-access highway|Expressways]]
| field1    = National expressways (NE) <br /><small>(Primary corridors)</small><br /> Economic corridors (EC)<br /><small>(Industrial corridors)</small><br />State expressways (SE)<br /><small>(Regional corridors)</small>
}}


[[File:Delhi Noida Direct flyway (Uttar Pradesh - 2011-06-18).jpg|thumb|Delhi–Noida Direct ([[DND Flyway]]). It is India's first 8-lane wide expressway.]]
The '''expressways of India''' are [[controlled-access highway|access-controlled]] [[toll road|toll highway]]s featuring [[Dual carriageway|divided carriageways]], engineered to support high-speed vehicular movement and to accommodate heavy loads. They constitute the highest class of road infrastructure in the Indian road network.<ref>{{Cite web |title=Wayback Machine |url=https://tis.nhai.gov.in/UploadGazatte/gazatte_notification.pdf |archive-url=https://web.archive.org/web/20250308011759/https://tis.nhai.gov.in/UploadGazatte/gazatte_notification.pdf |archive-date=2025-03-08 |access-date=2025-06-26 |website=tis.nhai.gov.in}}</ref> As of December 2024, the total length of expressways in India was {{convert|6,059|km|mi|abbr=on}}, with {{convert|11,127.69|km|mi|abbr=on}} under construction.
[[File:Express highway.jpg|thumb|[[Mumbai–Pune Expressway]]. It is India's first 6-lane wide expressway.]]
[[File:Delhi–Meerut Expressway.jpg|thumb|[[Delhi–Meerut Expressway]], India's widest expressway at 14-lanes.]]
[[File:Approaching-Yamuna01 Agra Lucknow Expressway (33198644271).jpg|thumb|[[Agra–Lucknow Expressway]], the longest expressway in India.]]


'''Expressways''' are the highest class of roads in [[India]]. In India, expressways are [[controlled-access highway]]s where entrance and exits are controlled by the use of [[Interchange (road)|ramps]] that are incorporated into the [[Controlled-access highway#Design|design of the expressway]], whereas [[National highways of India|National highways]] are [[Intersection (road)|at-grade roads]]. Some roads are not access-controlled expressway, but are still officially called expressways, such as the [[Biju Expressway]] and [[Raipur–Bilaspur Expressway]].
A central reservation or median separates the traffic moving in opposite directions on expressways. Entry and exits are permitted only through [[Grade separation|grade separated]] [[Interchange (road)|interchanges]]. In contrast, [[National highways of India|National highways]] may or may not have a [[Dual carriageway|median]] and may lack full access-control.<ref>{{Cite web |title=Wayback Machine |url=https://www.indiacode.nic.in/bitstream/123456789/1651/1/AAA1956____48.pdf |archive-url=https://web.archive.org/web/20231106083431/https://www.indiacode.nic.in/bitstream/123456789/1651/1/AAA1956____48.pdf |archive-date=2023-11-06 |access-date=2025-06-26 |website=www.indiacode.nic.in}}</ref> Additionally, some highways constructed by State Governments, which may be fully or [[Limited-access road|partially]] [[controlled-access highway|access-controlled]], are designated or named as expressways by the respective State authorities.<ref>{{Cite web |title=Wayback Machine |url=https://nhai.gov.in/assets/pdf/highway%20rating%20notice-with%20Attachements.pdf |archive-url=https://web.archive.org/web/20250524191105/https://nhai.gov.in/assets/pdf/highway%20rating%20notice-with%20Attachements.pdf |archive-date=2025-05-24 |access-date=2025-06-26 |website=nhai.gov.in}}</ref>


Greenfield Expressways in India are designed as 12-[[lane]] wide Expressways with the initial construction of 8-lanes. Land for 4-lane future expansion is reserved in the centre of the expressways. Greenfield Expressways are designed to avoid inhabited areas and go through new alignments to bring development to new areas and to reduce land acquisition costs and construction timelines.
Fully opened in April 2002, [[Mumbai–Pune Expressway]] was India's first six-lane, access-controlled, inter-city tolled expressway. Spanning {{cvt|94.5|km}} between [[Mumbai]] and [[Pune]], within the state of [[Maharashtra]], it set the benchmark for future expressway development in the country. Since then, expressway construction has significantly accelerated, particularly under the ''[[Bharatmala]]'' project and other infrastructure programmes both national and regional.<ref name="mumbai_pune_expwy">{{Cite web |last=Shekhawat |first=Aditya |date=2025-01-22 |title=Mumbai-Pune Expressway: History, Structure, Missing Link And More – My India |url=https://www.mapsofindia.com/my-india/automobiles/mumbai-pune-expressway-history-structure-missing-link-and-more |access-date=2025-06-26 |language=en-US}}</ref>
The [[Delhi-Mumbai Expressway]] is a great example of a new 12-lane approach with initial 8-lane construction.


The majority of the investment required for constructing expressways comes from the [[Government of India|Central Government]]. [[Uttar Pradesh]] and [[Maharashtra]] are the only states which are investing in building expressways through dedicated expressway corporations.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/business/india-business/maharashtra-up-to-drive-state-led-capex-in-road-sector-in-next-3-yrs/articleshow/69219363.cms|title=Maharashtra, UP to drive state-led capex in road sector in next 3 yrs - Times of India|website=The Times of India|access-date=1 June 2019}}</ref>
As of 2024, the longest expressway in India is the partially-opened [[Delhi–Mumbai Expressway]] (Phase-3), spanning {{convert|1015|km|mi|abbr=on}}, which was inaugurated on 18 December 2024.<ref>{{cite web | url=https://timesofindia.indiatimes.com/city/jaipur/80km-route-of-del-mum-eway-opens-to-boost-connectivity/articleshow/116412281.cms | title=80km route of Del-Mum eway opens, to boost connectivity | work=The Times of India | date=18 December 2024 }}</ref> The widest expressway is the [[Delhi]]–[[Gurgaon]] section of the [[Dwarka Expressway]], featuring 16 lanes, which was also opened in 2024.


The National Expressways Authority of India (NEAI) operating under the [[Ministry of Road Transport and Highways]] will be in-charge of the construction and maintenance of expressways.<ref name="toi_nov2009">{{cite news|url=http://timesofindia.indiatimes.com/articleshow/5259102.cms|title=By 2022, govt to lay 18,637km of expressways|newspaper=[[Times of India]]|first=Dipak Kumar|last=Dash|date=23 November 2009}}</ref> The [[National Highways Development Project]] by the [[Government of India]] aims to expand the country's current expressway network and plans to add an additional 18,637&nbsp;km of [[Greenfield project|greenfield]] expressways by 2022 apart from existing [[National highways of India|national highways]].<ref name="dna_expressways">{{cite news|url=http://www.dnaindia.com/money/report_expressway-cost-pegged-at-rs20-crore-km_1381235|title=Expressway cost pegged at Rs20 crore/km|work=Daily News and Analysis|first=Ashutosh|last=Kumar|access-date=16 September 2016}}</ref>
== History ==
=== Pre-independence ===
[[File:Original GT Road between Margalla and kala Chitta.JPG|thumb|left|Preserved segment of the [[Grand Trunk Road]] between [[Margalla Hills|Margalla]] and [[Kala Chitta Range|Kala Chitta]] in modern-day [[Pakistan]].]]
While major roads in the [[Indian subcontinent]] existed as early as 29th Century BCE in the [[Indus Valley civilization|Indus Valley]], the {{cvt|3,655|km}} long [[Grand Trunk Road]] built by the [[Maurya Empire|Mauryans]] during 4th century BCE and later maintained by others, is one of the earliest examples of highest class road infrastructure in India.<ref name="theatlantic.com">{{Cite magazine |url=https://www.theatlantic.com/magazine/archive/1999/11/indias-grand-trunk-road/377875/ |title=The Atlantic: "India's Grand Trunk Road" |work=The Atlantic |date=November 1999 |access-date=7 March 2017 |archive-date=7 September 2020 |archive-url=https://web.archive.org/web/20200907054858/https://www.theatlantic.com/magazine/archive/1999/11/indias-grand-trunk-road/377875/ |url-status=live |last1=Tayler |first1=Jeffrey }}</ref> In 1934, [[Indian Roads Congress]] (IRC) was formed to overlook development and research of roads in India and envisioned to achieve a road density of 16&nbsp;km per 100&nbsp;km<sup>2</sup> of land pre-independence.<ref name="Hir">{{cite web|last1=Jagarlamudi|first1=Vishnu|title=History of Road Development in India|url=https://www.scribd.com/document/285233145/History-of-Road-Development-in-India|via=Scribd|access-date=5 May 2018|archive-date=9 March 2021|archive-url=https://web.archive.org/web/20210309035410/https://www.scribd.com/document/285233145/History-of-Road-Development-in-India|url-status=live}}</ref> It was not until in 1995 when [[National Highways Authority of India]] (NHAI) was established as an autonomous body to develop, maintain and manage India's road network through National Highways. NHAI would later build and operate various expressways in the country.<ref>{{Cite web|title=Roadways in India - Road Industry, Network, Projects & FDI|url=https://www.investindia.gov.in/sector/roads-highways|access-date=2021-09-07|website=www.investindia.gov.in|language=en|archive-date=21 September 2021|archive-url=https://web.archive.org/web/20210921021152/https://www.investindia.gov.in/sector/roads-highways|url-status=live}}</ref>


[[Bharatmala]], a centrally-sponsored and funded road and highways project of the [[Government of India]]<ref name="Ecotimes">{{citation|title=Bharat Mala: PM Narendra Modi's planned Rs 14,000 crore road from Gujarat to Mizoram|date=29 April 2015|url=http://articles.economictimes.indiatimes.com/2015-04-29/news/61652753_1_crore-road-road-connectivity-road-network|work=[[The Economic Times]]|location=[[New Delhi]]}}</ref> with a target of constructing 83,677&nbsp;km<ref>{{Cite web|date=30 October 2017|title=Government to infuse massive Rs 7 trn to build 83,677 km of roads over 5 years|url=https://www.financialexpress.com/india-news/government-to-infuse-massive-rs-7-trn-to-build-83677-km-of-roads-over-5-years/911652/|access-date=20 July 2020|website=The Financial Express|language=en-US}}</ref> of new highways over the next five years, was started in 2018.<ref>{{Cite web|last=GOI|first=Ministry of Road Transport and Highways|title=Bharatmala Phase-I|url=https://morth.nic.in/bharatmala-phase-i#:~:text=The%20Bharatmala%20(approved%20for%20estimated,amount%20collected%20from%20toll%20(Rs.}}</ref> Phase I of the Bharatmala project involves the construction of 34,800&nbsp;km of highways (including the remaining projects under NHDP) at an estimated cost of [[Indian rupee|₹]]5.35 [[lakh]] [[crore]] by 2021–22.<ref>{{Cite web|url=https://www.india.gov.in/spotlight/bharatmala-pariyojana-stepping-stone-towards-new-india|title=Bharatmala Pariyojana - A Stepping Stone towards New India {{!}} National Portal of India|website=www.india.gov.in|language=en|access-date=18 January 2018}}</ref>
=== Early expressways ===
[[File:Express highway.jpg|thumb|[[Mumbai–Pune Expressway]], India's first 6-lane expressway]]


==Characteristics==
In 1990, [[Government of Maharashtra]] appointed [[Rail India Technical and Economic Service|RITES]] to conduct a feasibility study for toll-based expressway between [[Mumbai]] and [[Pune]], marking it as the first such initiative to construct an expressway in India. Four years later, RITES submitted its report and the project was estimated to cost {{INRConvert|1146|c|year=1994}}. In March 1997, [[Maharashtra State Road Development Corporation]] (MSRDC) undertook the construction of the expressway on a [[Build–operate–transfer]] (BOT) model that allowed the state government to collect tolls for 30 years. At the end of the same year, after all environmental and forest clearances, the construction on the {{cvt|94.5|km}} corridor commenced with first sections opening in 2000. In April 2002, India's first expressway was flagged to be fully operational, with an estimated construction cost of {{INRConvert|1630|c|year=2002}}, which paved the way for more such expressways across the country.<ref name="mumbai_pune_expwy"/>


As of April 2021, 20 [[Controlled-access highway|expressways]] having combined length of 1,728 km.<ref>{{Cite web|date=|url=https://morth.nic.in/sites/default/files/Annual%20Report%20-%202021%20(English)_compressed.pdf|title=https://morth.nic.in/sites/default/files/Annual%20Report%20-%202021%20(English)_compressed.pdf|url-status=live}}</ref> are operational in India. In 2017, the country had only 200 km of expressways. All the expressways are 6 or more lane wide {{Citation needed|date=July 2020}} [[controlled-access highway]]s where entrance and exit are controlled by the use of [[slip road]]s. India has one of the lowest densities of expressways in the world.<ref name=":0">{{Cite news|url=http://www.business-standard.com/article/economy-policy/nhai-to-have-new-wings-for-global-projects-expressways-117052401548_1.html|title=NHAI to have new wings for global projects, Expressways |date=24 May 2017|work=Business Standard India|access-date=7 June 2017}}</ref>
[[File:Delhi Noida Direct flyway (Uttar Pradesh - 2011-06-18).jpg|thumb|Delhi–Noida Direct ([[DND Flyway]]), India's first 8-lane expressway]]


== List of National Expressways==
On 24 January 2001, the eight-lane {{cvt|7.5|km}} long [[DND Flyway]] between [[Delhi]] and [[Noida]] was operationalised, becoming the first urban expressway in India.<ref>{{cite web |url=https://economictimes.indiatimes.com/news/politics-and-nation/noida-jinx-to-keep-akhilesh-yadav-away-from-pm-event/articleshow/50372875.cms| title='Noida jinx' to keep Akhilesh Yadav away from PM event |work=The Economic Times |date=29 December 2015 }}</ref> Following Mumbai-Pune, [[Ahmedabad–Vadodara Expressway]] was then opened between the cities of [[Ahmedabad]] and [[Vadodara]] in [[Gujarat]] on 16 August 2004. While this expressway was operationalised two years later, it was designated as National Expressway 1 (NE-1) back in 1986 by the [[Government of India]].<ref>{{Cite web |title=Wayback Machine |url=http://egazette.nic.in/WriteReadData/1986/E-0770-1986-0080-33904.pdf |archive-url=https://web.archive.org/web/20230202154856/http://egazette.nic.in/WriteReadData/1986/E-0770-1986-0080-33904.pdf |archive-date=2023-02-02 |access-date=2025-06-26 |website=egazette.nic.in}}</ref>
As of April 2021, eight expressways have been declared as National Expressway (NE) by the [[Ministry of Road Transport and Highways]], [[Government of India]]. The list is as follows:


{| class= "sortable wikitable"
In 2009, with the advent of new expressway infrastructures coming up across India, the [[Ministry of Road Transport and Highways]] (MoRTH) was preparing to set-up National Expressways Authority of India (NEAI) to be in-charge of the construction and maintenance of expressways, however, the Ministry did not proceed with the creation of NEAI for unspecified reasons and NHAI continued to remain in-charge.<ref name="toi_nov2009">{{cite news|url=http://timesofindia.indiatimes.com/articleshow/5259102.cms|title=By 2022, govt to lay 18,637km of expressways|newspaper=[[The Times of India]]|first=Dipak Kumar|last=Dash|date=23 November 2009|access-date=10 January 2020|archive-date=26 November 2009|archive-url=https://web.archive.org/web/20091126042422/http://timesofindia.indiatimes.com/articleshow/5259102.cms|url-status=live}}</ref>
! colspan=2 | Expressway !! style=max-width:3em | Length {{nobold|(km)}} !! style=max-width:1em | Declared as NE on
 
=== Bharatmala pariyojana ===
{{Further|Bharatmala}}
[[File:An Indian Air Force (IAF) Mirage -2000 lands at Yamuna Expressway, in Uttar Pradesh on May 20, 2015.jpg|thumb|[[Indian Air Force]] (IAF) [[Dassault Mirage 2000]] lands at [[Yamuna Expressway]], in Uttar Pradesh on May 20, 2015]]
 
Prior to being subsumed under ''Bharatmala Pariyojana'' ({{literal translation}} 'India garland project'), the government of India had launched [[National Highways Development Project]] (NHDP) in 1998 as a seven-step flagship project to construct highest class roads in India and to upgrade the existing ones. The phase-4 of which included the development of {{cvt|1000|km}} of expressways at an indicative cost of {{INRConvert|15000|c|year=1998}}.<ref name="nhai_progress">{{cite web|url=http://www.nhai.org/gqmain_english.htm|title=National Highways Development Project Map|publisher=National Highways Institute of India}}</ref> In 2017, under ''Bharatmala'' about {{cvt|1900|km}} km of corridors had been identified for development of new expressways, of which {{cvt|800|km}} were taken up under phase-1 of the project.<ref>{{Cite web |title=Wayback Machine |url=https://archive.pib.gov.in/documents/rlink/2017/oct/p2017102504.pdf |archive-url=https://web.archive.org/web/20230121163647/https://archive.pib.gov.in/documents/rlink/2017/oct/p2017102504.pdf |archive-date=2023-01-21 |access-date=2025-06-27 |website=archive.pib.gov.in}}</ref>
 
In the 2010s, the states of [[Maharashtra]] and [[Uttar Pradesh]] took keen interest in investing in expressways through dedicated expressway corporations of [[Maharashtra State Road Development Corporation|MSRDC]] and [[Uttar Pradesh Expressways Industrial Development Authority|UPEIDA]] respectively.<ref>{{Cite news |date=2019-05-07 |title=Maharashtra, UP to drive state-led capex in road sector in next 3 yrs |url=https://timesofindia.indiatimes.com/business/india-business/maharashtra-up-to-drive-state-led-capex-in-road-sector-in-next-3-yrs/articleshow/69219363.cms |access-date=2025-06-27 |work=The Times of India |issn=0971-8257}}</ref> While Maharashtra led by MSRDC completed its second expressway with {{cvt|701|km}} long [[Mumbai–Nagpur Expressway]] in June 2025, Uttar Pradesh had built four new expressways namely; [[Bundelkhand Expressway|Bundelkhand]], [[Purvanchal Expressway|Purvanchal]], [[Agra–Lucknow Expressway|Agra–Lucknow]] and [[Yamuna Expressway|Yamuna]] expressways by the turn of early 2020s.<ref>{{Cite web |date=2021-11-23 |title=Explained: Politics of Uttar Pradesh expressways |url=https://indianexpress.com/article/explained/politics-up-expressways-7634560/ |access-date=2025-06-27 |website=The Indian Express |language=en}}</ref> On 21 May 2015, in a first for military aviation and expressway infrastructure in India, the [[Indian Air Force]]'s [[Dassault Mirage 2000]] successfully landed on the Yamuna Expressway near [[Mathura]] in a mock-drill to evaluate the utility of using highways and expressways for emergency landings by military aircraft.<ref>{{cite news| url=https://timesofindia.indiatimes.com/india/IAF-successfully-test-lands-Mirage-on-Yamuna-e-way/articleshow/47378100.cms | work=The Times of India | title=IAF successfully test-lands Mirage on Yamuna e-way | date=22 May 2015}}</ref>
 
In 2024, the government of India presented an ambitious 'Vision 2047' plan envisioning the construction of up to {{cvt|50000|km}} of access-controlled highways and expressways, with Indians gaining access to the expressways at a distance of {{cvt|100-125|km}} from any point in the country. The ministry of road transport and highways (MoRTH) had also been finalising new guidelines to improve and standardise infrastructure along the already-developed highways with wayside amenities. Satellite-based tolling was also proposed to be started on 10-15 stretches in the same year.<ref>{{Cite news |last=Narayan |first=Subhash |date=2024-01-05 |title=Govt’s Vision ‘47 set to target 50,000km of expressways |url=https://www.livemint.com/news/india/govts-vision-47-set-to-target-50-000km-of-expressways-11704477426174.html |archive-url=https://web.archive.org/web/20240530051021/https://www.livemint.com/news/india/govts-vision-47-set-to-target-50-000km-of-expressways-11704477426174.html |archive-date=2024-05-30 |access-date=2025-06-27 |work=mint |language=en}}</ref>
 
=== Timeline ===
{{Bar chart
| title      = Total length of Expressways in India every fiscal year (in km)
| bar_width  = 40
| float      = middle
| width_units = em
| label_type  = Year
| label1 = 2024–2025 (Preliminary)
| label2  = 2023–2024
| label3  = 2022–2023
| label4  = 2021–2022
| label5  = 2020–2021
| label6  = 2019–2020
| label7  = 2018–2019
| label8  = 2017–2018
| label9  = 2016–2017
| label10  = 2015–2016
| label11  = 2014–2015
| label12 = 2013–2014
| label13  = 2012–2013
| label14  = 2011–2012
| label15  = 2010–2011
| label16  = 2009–2010
| label17  = 2008–2009
| label18  = 2007–2008
| label19  = 2006–2007
| label20  = 2005–2006
| label21  = 2004–2005
| label22  = 2003–2004
| label23  = 2002–2003
| label24  = 2001–2002
| data_type = Total length
| data_max  = 7000
| data1 = 6,059
| data2  = 5,145
| data3  = 3,629
| data4  = 2,501
| data5  = 2,002
| data6  = 1,989
| data7  = 1,762
| data8  = 1,323
| data9  = 1,021
| data10  = 1,021
| data11  = 1,021
| data12  = 1,004
| data13  = 988
| data14  = 580
| data15  = 580
| data16  = 534
| data17  = 438
| data18  = 384
| data19  = 384
| data20  = 343
| data21  = 253
| data22  = 160
| data23  = 160
| data24 =  33
}}
 
== Designation ==
=== Expressway categories ===
Expressways in India are designated into three main categories:
* '''National Expressways (NE)''': Managed by NHAI under the Ministry of Road Transport and Highways (MoRTH), these are the medium to long-distance expressways which connect the major cities of India. [[Delhi–Mumbai Expressway]], designated as National Expressway-4 (NE-4) is one such example of a National Expressway.
* '''Economic Corridors (EC)''': Also managed by NHAI under MoRTH, these expressways are being built across various [[Industrial corridor]]s of India. [[Amritsar–Jamnagar Expressway]], designated as Economic Corridor-3 (EC-3) is an example of Industrial expressway.
* '''State Expressways (SE)''': These are the regional expressways undertaken by respective state governments to connect the cities within a state. [[Mumbai–Nagpur Expressway]] undertaken by [[Government of Maharashtra|Maharashtra state-government's]] [[Maharashtra State Road Development Corporation|MSRDC]] is an example for regional expressway undertaken by the Maharashtra state government.
* '''Urban expressways''': Additionally some urban governments and municipalities have also constructed expressways within or near urban areas to facilitate decongestion and faster movement within cities. [[DND Flyway]] between Delhi and Noida is an example for toll-free urban expressway.
* '''Bypass expressways''': [[Bypass (road)|Bypass]] expressways are constructed to divert the through-traffic, away from urban areas and city centres. They reduce urban pollution and improve travel speed. [[Chennai Bypass Road]] is an example that is built to bypass [[Chennai]].
* '''Spur expressways''': [[Spur route|Spur]] expressways in India are short corridors that branch off from a main expressway to connect important cities, towns, industrial zones or border areas, thus enhancing the regional connectivity. The {{cvt|41|km}} long [[Nakodar]]–[[Amritsar]] spur section which branches off from the [[Delhi–Amritsar–Katra Expressway|Delhi–Katra Expressway]] is an example.
 
=== Greenfield and Brownfield expressways===
Greenfield Expressways in India are new expressways that are built on new alignments to facilitate economy of the areas they pass through. These newly built expressways allow for speeds up to {{cvt|120|km/h}} and typically have space reserved between the carriages to allow for a future expansion. Delhi–Mumbai Expressway is an example which is being built with eight-lanes and a reserved space in the median to allow for future expansion of up to twelve lanes.<ref>{{Cite web |title=Nod to elevated corridor on Greenfield Expressway, budget likely to rise by 48% |url=https://www.tribuneindia.com/news/haryana/nod-to-elevated-corridor-on-greenfield-expressway-budget-likely-to-rise-by-48/ |access-date=2025-06-27 |website=The Tribune |language=en}}</ref> While Brownfield Expressways in India backed by 'Brownfield National Highway Project' (BNHP) are a series of projects undertaken to widen/re-develop existing national highways that have high traffic demand. The upgradation usually involves expansion of lanes from four to six, such as [[National Highway 709A (India)|NH-709A]].<ref>{{Cite web |title=Brownfield National Highway Project {{!}} CEPT - Portfolio |url=https://portfolio.cept.ac.in/ft/construction-project-formulation-appraisal-cm4002-monsoon-2020-4670/brownfield-national-highway-project-monsoon-2020-pcm20400 |access-date=2025-06-27 |website=portfolio.cept.ac.in}}</ref>
 
== Design standards ==
=== Access ===
[[File:Yamuna Express way milestone near Bhidauni Village.jpg|thumb|Fencing behind the milestone on Yamuna Expressway in Uttar Pradesh]]
 
[[Controlled-access highway|Access-control]] on Indian expressways offers uninterrupted high-speed travel and safety. It is mainly achieved through fencing, [[Grade separation]] with over-passes and under-passes, barriers or medians and with additional dedicated [[Frontage road|service roads]] for local traffic. Fully access-controlled expressways do not allow access from side roads, villages or properties but only via [[Interchange (road)|inter-changes]]. [[Limited-access road|Partially access-controlled]] expressways allow access at some at-grade junctions and minor road crossings may exist. Non access-controlled roads are conventional highways that have a mix of local and through traffic without any entry restrictions.
 
=== Carriageways ===
All Indian expressways have [[dual carriageway]]s, one for each direction, separated by a [[median strip|
median]]. Each carriageway typically has at least two lanes, with three to four lanes also being common. Most Greenfield expressways have a reserved space between the carriages for future expansion in number of lanes. Some expressways utilise concrete or metal beam [[Traffic barrier|crash barriers]] for safety. [[Shoulder (road)|Paved shoulders]] or emergency lanes also exist beside each carriageway to support during the event of accident. Service lanes on each direction are often provided outside the fenced area for local traffic.
 
The [[Indian Roads Congress]] (IRC) has specified guidelines for designing access-controlled highways with its IRC:SP:99-2013 standard. It specifies a standard lane width of {{cvt|3.5|m}} with paved shoulders having a width of {{cvt|2-2.5|m}} and unpaved shoulders having {{cvt|1|m}} width.<ref name="IRC-SP-99">{{Cite book |last=Indian Roads Congress |url=http://archive.org/details/govlawircy2013sp99 |title=IRC SP 099: Manual of Specification and Standards for Expressways |date=2013 |others=Public.Resource.Org |language=English}}</ref>
 
=== Interchanges ===
[[File:Aerial view of interchange of Raipur Vizag expressway at Jami village.jpg|thumb|left|Aerial view of [[Diamond interchange#Single-point urban|Single Point Diamond Interchange]] (SPDI) interchange on [[Raipur–Visakhapatnam Expressway]]]]
Inter-changes are junctions that connect expressway with other roads, highways or other expressways without interrupting the flow of traffic. They improve safety by eliminating [[Side collision|right-angle collisions]]. Indian expressways have various interchanges designed for suitability. [[Interchange (road)#System interchanges|System interchanges]]—such as [[Cloverleaf interchange|cloverleaf]], [[Interchange (road)#Three-legged interchanges|three-way]], [[Interchange (road)#Trumpet interchange|trumpet]] connect with other national or state highways. [[Interchange (road)#Service interchanges|Service interchanges]]—such as [[Diamond interchange#Single-point urban|Single Point Diamond Interchange]] (SPDI) are used for connecting smaller roads.<ref>{{Cite web |title=Wayback Machine |url=https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.099.2013.pdf |archive-url=https://web.archive.org/web/20250114184934/https://law.resource.org/pub/in/bis/irc/irc.gov.in.sp.099.2013.pdf |archive-date=2025-01-14 |access-date=2025-06-26 |website=law.resource.org}}</ref>
 
The design of inter-changes for Indian expressways and highways are governed by IRC:SP:99-2013 and Ministry of Road Transport and Highways (MoRTH) guidelines. While Cloverleaf interchanges require at least 20-30 acres of land, directional flyovers require less. The inter-change designs include acceleration/deceleration lanes for safe merging.<ref name="IRC-SP-99"/>
 
=== Speed ===
[[File:Mumbai-Pune Expressway 3.JPG|thumb|Speed limit of {{cvt|80|km/h}} shown on the signage at [[Mumbai–Pune Expressway]]]]
 
High-speed travel is a key feature on Indian expressways unlike conventional highways where speeds are low due to local traffic and cattle interruptions. The Ministry of Road Transport and Highways (MoRTH) has set speed limits based on road geometry and vehicle type. Some Greenfield expressways are designed for speeds up to {{cvt|150|km/h}} but are legally capped at {{cvt|120|km/h}} for safety, with some expressways capped as low as {{cvt|100|km/h}}. For heavy vehicles such as buses and trucks, it is usually capped at {{cvt|80-100|km}}.<ref>{{Cite web |title=Tyre Speed Rating vs Legal Speed Limit in India |url=https://www.vredestein.co.in/content-hub/blogs/tyre-speed-rating-vs-legal-speed-limit-india/ |access-date=2025-06-27 |website=Vredestein Tyres |language=en}}</ref> The minimum designed speed on ramps on inter-changes per IRC is {{cvt|40-60|km}}.<ref name="IRC-SP-99"/>
 
{| class="wikitable"
|+ Speed limits on Indian Expressways<ref>{{Cite web |title=Tyre Speed Rating vs Legal Speed Limit in India |url=https://www.vredestein.co.in/content-hub/blogs/tyre-speed-rating-vs-legal-speed-limit-india/ |access-date=2025-06-28 |website=Vredestein Tyres |language=en}}</ref>
! Expressway type
! Max enforced limit
! Design speed
|-
|-
| NE 1 || [[Ahmedabad–Vadodara Expressway]] || {{right|93}} || 13 Mar 1986<ref>[http://egazette.nic.in/WriteReadData/1986/E-0770-1986-0080-33904.pdf Notification dated March 13, 1986]</ref>
| Greenfield Expressways
| {{cvt|120|km/h}}
| {{cvt|150|km/h}}
|-
|-
| NE 2 || [[Eastern Peripheral Expressway]] (KGP) || {{right|135}} || 30 Mar 2006<ref>[http://egazette.nic.in/WriteReadData/2006/E_308_2011_012.pdf Notification dated March 30, 2006]</ref>
| Brownfield Expressways
| {{cvt|100-120|km/h}}
| {{cvt|100-120|km/h}}
|-
|-
| NE 3 || [[Delhi–Meerut Expressway]] || {{right|96}} || 18 Jun 2020<ref>[http://egazette.nic.in/WriteReadData/2020/220078.pdf Notification dated June 18, 2020]</ref>
| Urban Expressways
|-
| {{cvt|70-90|km/h}}
| NE 4 || [[Vadodara]]–[[Mumbai]] section of [[Delhi–Mumbai Expressway]] || {{right|380}} || 10 Jan 2020<ref>[http://egazette.nic.in/WriteReadData/2020/215497.pdf Notification dated January 10, 2020]</ref>
| {{cvt|80-100|km/h}}
|-
| NE 5 || [[Delhi]]–[[Nakodar]]–[[Gurdaspur]] section of [[Delhi–Amritsar–Katra Expressway]] || {{right|398}} || 25 Jun 2020<ref>[http://egazette.nic.in/WriteReadData/2020/220177.pdf Notification dated June 25, 2020]</ref>
|-
| NE 5A || [[Nakodar]]–[[Amritsar]] section of [[Delhi–Amritsar–Katra Expressway]] || {{right|99}} || 17 Sep 2020<ref>[http://egazette.nic.in/WriteReadData/2020/221805.pdf Notification dated September 17, 2020]</ref>
|-
| NE 6 || [[Lucknow–Kanpur Expressway]] || {{right|74}} || 15 Dec 2020<ref>[http://egazette.nic.in/WriteReadData/2020/223742.pdf Notification dated December 15, 2020]</ref>
|-
| NE 7 || [[Bengaluru–Chennai Expressway]]|| {{right|258}} || 01 Jan 2021<ref>[http://egazette.nic.in/WriteReadData/2021/224170.pdf Notification dated January 1, 2021]</ref>
|-
! || Total || {{right|1,533}} ||
|}
|}


== List of Expressways (Operational) ==
== Infrastructure ==
Only ''operational length'' and year of ''final completion'' is shown. Total length listed in this table is {{convert|1,728|km|mi|1|abbr=on}}. '''Note:''' AC = [[Controlled-access highway|Access-Controlled]] Expressway.
=== Tolls ===
[[File:MPEW-MSRDC-Talegaon-Toll-ETC.jpg|thumb|[[Talegaon]] Toll booth on Mumbai–Pune Expressway]]
 
Expressways in India excluding some urban ones are [[Road pricing|tolled]]. They are implemented to recover cost of construction, maintenance and operations, and are primarily managed by NHAI under MoRTH. The tolls are levied based on vehicle category, type of expressway and distance travelled. They form a great source of revenue for funding the expanding expressway network in India. Only designated interchanges allow entry and exit into the tolls. Rates of tolls are revised every year on April 1, based on the [[Wholesale price index]] (WPI) to adjust for [[Inflation in India|inflation]].<ref>{{Cite web |date=2025-04-01 |title=Toll taxes across Indian highways set to increase from April 1. Details inside |url=https://www.indiatoday.in/information/story/toll-taxes-across-indian-highways-set-to-increase-from-april-1-details-inside-2702236-2025-04-01 |access-date=2025-06-28 |website=India Today |language=en}}</ref><ref>{{Cite web |last=Bhatnagar |first=Viraaj |title=Toll tax on national highways, expressways hiked by up&#160;to&#160;5&#160;percent |url=https://www.autocarindia.com/industry/toll-tax-on-national-highways-expressways-hiked-by-up%c2%a0to%c2%a05%c2%a0percent-434993 |access-date=2025-06-28 |website=Autocar India |language=en}}</ref>
 
=== FASTag ===
{{Main|FASTag}}
[[File:The Chairman, NHAI, Shri Deepak Kumar launching the Mobile App My FASTag and FASTag Partner, in New Delhi on August 17, 2017.jpg|thumb|left|Chairperson of NHAI Shri Deepak Kumar launching the Mobile Apps named 'My FASTag' and 'FASTag Partner' in [[New Delhi]] on 17 August 2017.]]
 
FASTag is an [[Electronic toll collection]] (ETC) system operated in India by NHAI under MoRTH. It uses [[Radio-frequency identification]] (RFID) technology to enable automatic deduction of toll charges at toll plazas on Indian expressways, allowing for vehicles to pass without stopping for toll transactions.<ref name="faq">{{cite web| url=https://www.npci.org.in/what-we-do/netc-fastag/faqs| title=FAQs on NETC FASTag| access-date=27 December 2021| archive-date=27 December 2021| archive-url=https://web.archive.org/web/20211227020104/https://www.npci.org.in/what-we-do/netc-fastag/faqs| url-status=live}}</ref>
 
The FASTag system is based on the National Electronic Toll Collection (NTEC) programme developed by the [[National Payments Corporation of India]] (NPCI) as a part of India's efforts to digitise highway infrastructure and reduce congestion on toll plazas. It was launched in 2014 as a pilot project on the Ahmedabad–Mumbai section of [[Golden Quadrilateral]] highway. From 15 February 2021, fastag became mandatory for all four-wheeled vehicles on national highways.<ref>{{Cite web |date=2021-01-01 |title=FASTags mandatory for all 4 wheelers from today; hybrid lanes to accept cash till February 15 - BusinessToday |url=https://www.businesstoday.in/latest/economy-politics/story/fastags-mandatory-for-all-4-wheelers-from-today-hybrid-lanes-to-accept-cash-till-february-15-283260-2021-01-01 |access-date=2025-06-28 |website=Business Today |language=en}}</ref>
 
=== Wayside amenities ===
Offered by NHAI under MoRTH, Wayside Amenities (WSAs) are dedicated rest and service facilities located along Indian expressways and other national highways to improve road travel comfort, safety, and logistics. They offer rest, food, fuel, charging stations and similar services to both passengers and freight vehicles. The help in reducing driver fatigue, supporting logistics movement and in promoting highway tourism. They are typically located at intervals of {{cvt|40-50|km}} along expressways. In June 2025, NHAI announced an ambitious plan of establishing over 1000 WSAs over a period of five years under [[Public–private partnership]]. The WSAs in the plan include setting up of fuel stations and [[Charging station|EV charging points]], food courts, [[dhaba]]s and restaurants, convenience stores, medical and childcare rooms, promotional spaces for local artisans,  drone landing facilities and helipads at larger sites.<ref>{{Cite web |title=NHAI’s Innovative Strategy to Attract Global Expertise for World-Class Highway Amenities |url=https://parkplus.io/car-news/nhais-innovative-strategy-to-attract-global-expertise-for-world-class-highway-amenities |access-date=2025-06-28 |website=Park+ |language=en}}</ref>
 
== Financing ==
The financing of Indian expressways is achieved through a combination of [[Government spending|public funding]], private investment, multilateral lending and via tolls. [[Ministry of Road Transport and Highways]] (MoRTH) sets policy and budget allocations while [[National Highways Authority of India]] (NHAI) is responsible for implementation and collection of tolls. The private sector entities participate through various [[Public–private partnership]] models. A significant amount of funding for expressways comes from central government allocations, especially under [[Bharatmala|''Bharatmala Pariyojana'']]. In the 2023-24 [[Union budget of India]], MoRTH was allocated {{INRConvert|270000|c}}, of which a large share was dedicated for expressways and economic corridor developments.<ref>{{Cite news |last=Chandra |first=Jagriti |date=2024-02-01 |title=Budget 2024 {{!}} Road sector budget sees a nominal hike of 2.7% |url=https://www.thehindu.com/business/budget/fm-marginally-increases-allocation-to-nhai-to-rs-168-lakh-crore-for-fy25/article67800142.ece |access-date=2025-06-28 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref> In 2024–25, NHAI earned over {{INRConvert|41000|c}} in toll revenue, with projections of {{INRConvert|130000|c}} by 2030 through FASTag and monetisation of roads.<ref>{{Cite news |last=Sharma |first=Yogima Seth |date=2025-04-04 |title=Toll mopup rises 12.5% in FY25 to an all-time high |url=https://economictimes.indiatimes.com/news/economy/infrastructure/toll-mopup-rises-12-5-in-fy25-to-an-all-time-high/articleshow/119954601.cms?from=mdr |access-date=2025-06-28 |work=The Economic Times |issn=0013-0389}}</ref>


{| class="wikitable sortable" width=80%
== National expressways ==
!Name
=== Operational national expressways ===
!States
The following list contains operational national expressways built and operated by [[National Highways Authority of India]] (NHAI).
!data-sort-type="number" |Length (km/mi)
{{sticky header}}{{sort under}}
!Lanes
{{static row numbers}}
!Year of Completion
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
!OSM
|+ Overview of fully and partially operational national expressways of India
!Remarks
|-
|-
|[[Agra–Lucknow Expressway]] (AC)<ref>{{cite news|url=http://www.nyoooz.com/lucknow/663924/iaf-fighter-planes-to-welcome-cm-as-he-inaugurates-expressway|title=IAF fighter planes to welcome inauguration|work=Nyooz|access-date=23 February 2017|archive-url=https://web.archive.org/web/20170113151319/http://www.nyoooz.com/lucknow/663924/iaf-fighter-planes-to-welcome-cm-as-he-inaugurates-expressway|archive-date=13 January 2017|url-status=dead}}</ref>||[[Uttar Pradesh]]|| style=text-align:right|{{convert|302.2|km|mi|1|abbr=on|disp=br}}
! Expressway
|6
! class="unsortable" | Sign
|2017 February
! Terminus
|<ref>{{Cite web|url=https://www.openstreetmap.org/relation/6303141|title = Relation: Agra - Lucknow Expressway East (6303141)}}</ref>
! Locale
|Longest expressway in India<ref>{{cite web|url=https://www.financialexpress.com/india-news/agra-lucknow-expressway-india-longest-greenfield-highway-10-facts-features-highlights-akhilesh-yadav-up-government/451101/ |title=Agra-Lucknow Expressway: India's longest greenfield expressway reduces travel time between Delhi-Lucknow to 6 hours; 10 facts to know|date=21 November 2016|publisher=Financial Express|access-date=21 November 2016}}</ref>
! data-sort-type="number" | Length
! Lanes
! Type
! Status
! data-sort-type="date" | Opening
|-
|-
|[[Ahmedabad–Vadodara Expressway]] (AC)<ref>{{cite web|url=http://www.cclindia.com/expertise/ahmedabadexpressway.htm |title=Ahmedabad-Vadodara Expressway Project |publisher=Cclindia.com |access-date=16 September 2010}}</ref> ||[[Gujarat]]|| style=text-align:right|{{convert|93.1|km|mi|1|abbr=on|disp=br}}
| [[Ahmedabad–Vadodara Expressway|Ahmedabad–Vadodara]]
|4
| [[File:NE1-IN.svg|24px|center]]
|2004 August
| Jashodha Nagar, [[Ahmedabad]] – Dumad, [[Vadodara]]
|
| Gujarat
|[[National Expressway 1 (India)|NE1]]
| {{cvt|93.1|km}}
| 4
| Intrastate
| {{Operational}}
| 16 August 2004<ref>{{Cite web |title=Ahmedabad Vadodara Expressway to be ready by March-Source-Business Standard |url=http://www.business-standard.com/india/news/ahmedabad-vadodara-expressway-to-be-ready-by-march/137164/ |url-status=live |archive-url=https://web.archive.org/web/20121004181909/http://www.business-standard.com/india/news/ahmedabad-vadodara-expressway-to-be-ready-by-march/137164/ |archive-date=4 October 2012 |access-date=30 December 2021}}</ref>
|-
|-
|[[Belghoria Expressway]] (AC)
| [[Amritsar–Jamnagar Expressway|Amritsar–Jamnagar]]
|[[West Bengal]]
| style="text-align: center;" | EC-3
| style=text-align:right|{{convert|16|km|mi|1|abbr=on|disp=br}}
| [[Tibba]], [[Kapurthala district|Kapurthala]] – [[Jamnagar]]
|4
| Punjab, Haryana, Rajasthan and Gujarat
|2008
| {{cvt|1256.95|km}}
|
| 6
|Part of [[AH1]]
| Inter-state economic corridor
| {{Maybe|Partially opened}}
| 1 December 2025<ref>{{Cite web |title=Amritsar – Jamnagar Economic Corridor – Information & Status |url=https://themetrorailguy.com/nhai-amritsar-jamnagar-economic-corridor-information-route-map-status/ |access-date=2025-06-29 |website=The Metro Rail Guy |language=en-US}}</ref>
|-
|-
|[[Chennai Bypass]] (AC)<ref>{{cite news|url=http://trbaalu.nic.in/minister/press/2005/Jan05/Jan3005.htm|title=PIB Foundation stone for Phase II of Chennai Bypass|work=PIB|access-date=25 February 2017|url-status=dead|archive-url=https://web.archive.org/web/20070928081554/http://trbaalu.nic.in/minister/press/2005/Jan05/Jan3005.htm|archive-date=28 September 2007}}</ref>||[[Tamil Nadu]]|| style=text-align:right|{{convert|32|km|mi|1|abbr=on|disp=br}}
| [[Bengaluru–Chennai Expressway|Bengaluru–Chennai]]
|4-6
| [[File:NE7-IN.svg|24px|center]]
|2010
| [[Hoskote|Hosakote]] – [[Sriperumbudur]]
|<ref>{{Cite web|url=https://www.openstreetmap.org/relation/1183546|title = Relation: 1183546}}</ref>
| Karnataka, Andhra Pradesh and Tamil Nadu
|
| {{cvt|258|km}}
| 4
| Inter-state
| {{Maybe|Partially opened}}
| 1 June 2026<ref>{{Cite news |last=B.P |first=Darshan Devaiah |date=2025-03-17 |title=Bengaluru-Chennai Expressway to be fully operational by June 2026 |url=https://www.thehindu.com/news/national/karnataka/bengaluru-chennai-expressway-to-be-fully-operational-by-june-2026/article69340081.ece |access-date=2025-06-25 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>
|-
|-
|[[Delhi–Faridabad Skyway]] (AC)<ref>{{cite web|url=http://www.hccinfrastructure.com/projects/delhifaridabad_expressway.aspx |title=Delhi Faridabad Expressway |url-status=dead |archive-url=https://web.archive.org/web/20160101032537/http://www.hccinfrastructure.com/projects/delhifaridabad_expressway.aspx |archive-date=1 January 2016  }}</ref><ref>{{cite news |title=Badarpur flyover to open today |url=http://articles.timesofindia.indiatimes.com/2010-10-05/delhi/28253226_1_badarpur-flyover-second-carriageway-hcc |archive-url=https://archive.today/20120710182721/http://articles.timesofindia.indiatimes.com/2010-10-05/delhi/28253226_1_badarpur-flyover-second-carriageway-hcc |url-status=dead |archive-date=10 July 2012 |newspaper=[[The Times of India]] |date=5 October 2010}}</ref>||[[Delhi]], [[Haryana]]|| style=text-align:right|{{convert|4.4|km|mi|1|abbr=on|disp=br}}
| [[National Highway 275 (India)|Bengaluru–Mysuru]]
|6
| [[File:NH275-IN.svg|24px|center]]
|2010 November
| [[Kumbalgodu]], Bengaluru Urban district – [[Hale Kesare]], [[Mysuru]]
|
| Karnataka
|Part of [[National Highway 44 (India)|NH44]]  
| {{cvt|119|km}}
|-
| 6
|[[Delhi–Gurgaon Expressway]] (AC)<ref>{{cite news|url=http://www.expressindia.com/latest-news/excess-cars-made-tolling-a-taxing-truth-at-first-expressway-builder/281668/ |title=Excess cars made tolling a taxing truth at first: Expressway builder |newspaper=Express India |access-date=16 September 2015 |url-status=dead |archive-url=https://web.archive.org/web/20081120072631/http://www.expressindia.com/latest-news/Excess-cars-made-tolling-a-taxing-truth-at-first-Expressway-builder/281668/ |archive-date=20 November 2008  }}</ref>||[[Delhi]], [[Haryana]]|| style=text-align:right|{{convert|27.7|km|mi|1|abbr=on|disp=br}}
| Intrastate brownfield
|6-8
| {{Operational}}
|2008 January
| 12 March 2023<ref>{{cite news|title=Prime Minister Narendra Modi inaugurates 118-km Bangalore-Mysore Expressway|url=https://www.telegraphindia.com/india/prime-minister-narendra-modi-inaugurates-118-km-bangalore-mysore-expressway/cid/1921956|work=The Telegraph|date=12 March 2023|access-date=13 March 2023|language=en}}</ref>
|<ref>{{Cite web|url=https://www.openstreetmap.org/relation/5694117|title = Relation: Delhi-Gurgaon Expressway (5694117)}}</ref>
|Part of [[Golden Quadrilateral]]
|-
|[[Delhi–Meerut Expressway]] (AC)<ref name="NDTV">{{citation|url=https://www.ndtv.com/india-news/pm-narendra-modi-to-inaugurate-delhi-meerut-eastern-peripheral-expressway-today-10-facts-1858173?pfrom=home-topscroll|title=PM Modi Inaugurates Delhi-Meerut Expressway, Will Also Open Eastern Peripheral Expressway Today: 10 Facts|publisher=NDTV}}</ref>||[[Delhi]], [[Uttar Pradesh]]|| style=text-align:right|{{convert|96|km|mi|1|abbr=on|disp=br}}
|6-14
|2021 April
|
|[[Delhi–Meerut Expressway|NE3]] [India's widest Expressway (14-[[lane]])]<ref>{{cite web|url=https://m.hindustantimes.com/india-news/all-you-need-to-know-about-delhi-meerut-expressway-eastern-peripheral-expressway/story-4dHzuDmPv66RnNmdUJxzQL.html |title=All you need to know about Delhi-Meerut Expressway|date=27 May 2018|publisher=Hindustan Times|access-date=27 May 2018}}</ref>
|-
|-
|[[Delhi–Noida Direct Flyway]] (DND) (AC)<ref>{{cite web|url=http://www.dndflyway.com/ |title=Welcome to DND Flyway |publisher=Dndflyway.com |date=22 July 2009 |access-date=16 July 2010}}</ref>||[[Delhi]], [[Uttar Pradesh]]|| style=text-align:right|{{convert|9.2|km|mi|1|abbr=on|disp=br}}
| [[Delhi–Dehradun Expressway|Delhi–Dehradun]]
|8
| [[File:NH709B-IN.svg|24px|center]]
|2001 January
| Delhi – [[Dehradun]]
|
| Delhi, Uttar Pradesh and Uttarakhand
|India's First 8-[[lane]] wide expressway
| {{cvt|210|km}}
|-  
| 6
|[[Eastern Peripheral Expressway]] (AC)||[[Uttar Pradesh]], [[Haryana]]|| style=text-align:right|{{convert|135|km|mi|1|abbr=on|disp=br}}
| Inter-state
|6
| {{Maybe|Partially opened}}
|2018 May
| 1 December 2025<ref>{{Cite news |date=2024-09-03 |title=Delhi-Dehradun expressway status: Travel from Delhi to Dehradun in 2.5 hours soon - details here |url=https://timesofindia.indiatimes.com/business/india-business/delhi-dehradun-expressway-status-travel-from-delhi-to-dehradun-in-2-5-hours-soon-details-here/articleshow/113013752.cms |access-date=2025-06-30 |work=The Times of India |issn=0971-8257}}</ref>
|<ref>
https://www.openstreetmap.org/relation/7237808</ref>
|[[National Expressway 2 (India)|NE2]]
|-
|-
|[[Jaipur–Kishangarh Expressway]] (AC)<ref name="expressway">{{cite news|url=http://www.walkthroughindia.com/walkthroughs/the-10-amazing-expressways-in-india/|title=The 10 Amazing Expressways in India}}</ref>||[[Rajasthan]]|| style=text-align:right|{{convert|90|km|mi|1|abbr=on|disp=br}}
| [[Delhi–Faridabad Skyway|Delhi–Faridabad]]
|6
| [[File:NH44-IN.svg|24px|center]]
|2005 April
| [[Badarpur, Delhi|Badarpur]], [[Delhi]] – Sector 37, [[Faridabad]]
|
| Delhi NCR
|Forms a segment of the [[NH-8]]
| {{cvt|4.4|km}}
| 6
| Urban brownfield
| {{Operational}}
| 29 November 2010<ref>{{cite web|url=http://www.hccinfrastructure.com/projects/delhifaridabad_expressway.aspx|title=Delhi Faridabad Expressway|url-status=dead|archive-url=https://web.archive.org/web/20160101032537/http://www.hccinfrastructure.com/projects/delhifaridabad_expressway.aspx|archive-date=1 January 2016}}</ref>
|-
|-
|[[Mumbai–Pune Expressway]] (AC)<ref>{{cite web|url=http://www.roadtraffic-technology.com/projects/mumbai/ |title="Mumbai-Pune Expressway, India". |publisher=Road Traffic Technology. |access-date=21 August 2010}}</ref>||[[Maharashtra]]|| style=text-align:right|{{convert|94.5|km|mi|1|abbr=on|disp=br}}
| [[Delhi–Gurgaon Expressway|Delhi–Gurgaon]]
|6
| [[File:NH48-IN.svg|24px|center]]
|2002 April
| [[Manesar]], [[Gurgaon]] – Arjun Vihar, [[Delhi]]
|<ref>{{Cite web|url=https://www.openstreetmap.org/relation/1247233|title = Relation: Mumbai-Pune Expressway (1247233)}}</ref>
| Delhi NCR
|India's First 6-[[lane]] wide expressway
| {{cvt|27.7|km}}
| 6–8
| Urban brownfield
| {{Operational}}
| 23 January 2008<ref name="expressindia1">{{cite web|url=http://www.expressindia.com/latest-news/excess-cars-made-tolling-a-taxing-truth-at-first-expressway-builder/281668/ |title=Excess cars made tolling a taxing truth at first: Expressway builder |publisher=Express India |access-date=2010-09-16 |url-status=dead |archive-url=https://web.archive.org/web/20081120072631/http://www.expressindia.com/latest-news/Excess-cars-made-tolling-a-taxing-truth-at-first-Expressway-builder/281668/ |archive-date=20 November 2008 }}</ref>
|-
|-
|[[Noida–Greater Noida Expressway]] (AC)<ref>{{cite news |title= Noida: An idea that has worked |url=http://timesofindia.indiatimes.com/articleshow/4993.cms |newspaper=[[The Times of India]] |date=4 June 2003}}</ref>||[[Uttar Pradesh]]|| style=text-align:right|{{convert|24.5|km|mi|1|abbr=on|disp=br}}
| [[Delhi–Meerut Expressway|Delhi–Meerut]]
|6
| [[File:NE3-IN.svg|24px|center]]
|2002
| Nizamuddin Bridge, [[New Delhi]] [[Partapur, Uttar Pradesh|Partapur]], [[Meerut]]
|<ref>
| Delhi and Uttar Pradesh
[https://www.openstreetmap.org/relation/8428026#map=13/28.4924/77.4053 https://www.openstreetmap.org/relation/8428026]</ref>
| {{cvt|96|km}}
|
| 14
| Inter-state
| {{Operational}}
| 1 April 2021<ref name=":5">{{Cite news |title=Delhi-Meerut Expressway open for public, cuts travel time to 45 minutes |url=https://economictimes.indiatimes.com/news/india/delhi-meerut-expressway-open-for-public-cuts-travel-time-to-45-min/articleshow/81853266.cms}}</ref>
|-
|-
|[[Outer Ring Road, Hyderabad]] (AC)<ref>{{cite web |url=http://timesofindia.indiatimes.com/city/hyderabad/Another-Outer-Ring-Road-stretch-to-be-opened-today/articleshow/17458309.cms |title=Another Outer Ring Road stretch to be opened today |publisher=TOI |access-date=16 July 2010}}</ref>||[[Telangana]]|| style=text-align:right|{{convert|158|km|mi|1|abbr=on|disp=br}}
| [[Delhi–Mumbai Expressway|Delhi–Mumbai]]
|8
| [[File:NE4-IN.svg|24px|center]]
|2018 April
| [[Sohna Elevated Corridor|Sohna EC]], [[Delhi]] – [[Jawaharlal Nehru Port|JNPT]], [[Mumbai]]
|<ref>
| Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra
https://www.openstreetmap.org/relation/7149978</ref>
| {{cvt|1350|km}}
|
| 8
| Inter-state
| {{Maybe|Partially opened}}
| 1 October 2025<ref>{{Cite web |date=2024-08-02 |title=Delhi-Mumbai Expressway Set To Open For All by 2025 |url=https://www.india.com/webstories/business/delhi-mumbai-expressway-set-to-open-for-all-by-2025-check-travel-time-distance-deadline-nitin-gadkari-nhai-7134083/ |access-date=2024-08-02 |website=India.com |language=en}}</ref>
|-
|-
|[[P.V. Narasimha Rao Expressway]] (AC)<ref>{{cite web |url=http://www.indiatrends.info/2009/10/elevated-expressway-inaugurated-in.html |title=Longest Elevated Expressway inaugurated in Hyderabad &#124; India Trends |publisher=Indiatrends.info |date=20 October 2009 |access-date=16 July 2010 |url-status=dead |archive-url=https://web.archive.org/web/20110721205931/http://www.indiatrends.info/2009/10/elevated-expressway-inaugurated-in.html |archive-date=21 July 2011  }}</ref><ref>{{cite web|url=http://www.ndtv.com/news/india/hyderabad_gets_indias_longest_flyover.php |title=Hyderabad gets India's longest flyover |publisher=NDTV |access-date=16 July 2010}}</ref>||[[Telangana]]|| style=text-align:right|{{convert|11.6|km|mi|1|abbr=on|disp=br}}
| [[National Highway 44 (India)|Delhi–Panipat]]
|4
| [[File:NH44-IN.svg|24px|center]]
|2009 October
| [[Delhi]] – [[Panipat]]
|
| Delhi NCR
|
| {{cvt|70.5|km}}
| 8
| Inter-state brownfield
| {{Operational}}
| 20 June 2023<ref>{{Cite news |last=Dutta |first=Alisha |date=2023-07-08 |title=Completion of Delhi-Panipat corridor allows commuters to breathe easy |url=https://www.thehindu.com/news/cities/Delhi/completion-of-delhi-panipat-corridor-allows-commuters-to-breathe-easy/article67057930.ece |access-date=2025-06-30 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>
|-
|-
|[[Panipat Elevated Expressway]](AC)<ref>{{cite web |url=http://www.projectsmonitor.com/detailnews.asp?newsid=16598 |title=Panipat elevated highway inaugurated |publisher=Projectsmonitor.com |access-date=16 July 2010 |url-status=dead |archive-url=https://web.archive.org/web/20100114173426/http://projectsmonitor.com/detailnews.asp?newsid=16598 |archive-date=14 January 2010  }}</ref>||[[Haryana]]|| style=text-align:right|{{convert|10|km|mi|1|abbr=on|disp=br}}
| [[DND–KMP Expressway|DND–KMP]]
|6
| style="text-align: center;" | NH-148NA
|2008 January
| [[DND Flyway]], Delhi – [[Western Peripheral Expressway|KMP]], [[Nuh district]]
|
| Delhi, Haryana and Uttar Pradesh
|
| {{cvt|59|km}}
| 6
| Inter-state
| {{Maybe|Partially opened}}
| 2026
|-
|-
|[[Vijayawada–Hyderabad Expressway]] (AC)<ref>{{Cite web|date=October 17, 2020|first=Gopi|last=Dara|title=On Jagan's wishlist to Gadkari: New national highways for AP|url=https://timesofindia.indiatimes.com/city/vijayawada/on-cms-wishlist-to-gadkari-new-national-highways-for-ap/articleshow/78708887.cms|access-date=2021-01-19|website=The Times of India|language=en}}</ref>
| [[National Highway 19 (India)|Durgapur Expressway]]
|[[Andhra Pradesh]], [[Telangana]]
| [[File:NH19-IN.svg|24px|center]]
| style=text-align:right|{{convert|291|km|mi|1|abbr=on|disp=br}}
| [[Dankuni]] –  [[Durgapur]]
|6
| West Bengal
|2012 October
| 154 km(95.7 mi)
|<ref>{{Cite web|title=GMR Hyderabad Vijayawada Expressways Private Limited Information - GMR Hyderabad Vijayawada Expressways Private Limited Company Profile, GMR Hyderabad Vijayawada Expressways Private Limited News on The Economic Times|url=https://economictimes.indiatimes.com/company/|access-date=2021-01-19|website=The Economic Times}}</ref>
| 6
|Part of [[National Highway 65 (India)|NH 65]]
| Intrastate brownfield
|-
| {{Maybe|Partially opened}}  
|[[Western Peripheral Expressway]] (AC)||[[Haryana]]|| style=text-align:right|{{convert|135.6|km|mi|1|abbr=on|disp=br}}
| 2025
|6
|2018 November
|<ref>
https://www.openstreetmap.org/relation/8427980</ref>
|
|-
|-
| [[Kona Expressway|Kona]]
| [[File:NH12-IN.svg|24px|center]]
| [[Hastings, Kolkata|Hastings]], [[Kolkata]] – [[National Highway 16 (India)|NH 16]], [[Nibra]], [[Howrah district|Howrah]]
| West Bengal
| 11 km(6.8 mi)
| 6
| Urban brownfield
| {{Maybe|Partially opened}}
| 3 December 2026<ref><nowiki>{{cite web| url=</nowiki>https://www.magicbricks.com/blog/kona-expressway/133175.html | title=Kona Expressway - Route, Speed, & Real-Estate Impact | publisher=magicbricks | date=19 October 2023</ref>
|-
|-
| [[Yamuna Expressway]] (AC)<ref>{{Cite web|url=http://www.projectsjugaad.com/2011/05/facts-about-yamuna-expressway-project/|title=Facts About Yamuna Expressway|publisher=Projects Jugaad|date=5 October 2013|access-date=6 December 2013}}</ref><ref>{{Cite web|url=http://yamunaexpresswayauthority.com/features|title=Yamuna Expressway Project|publisher=Yamuna Expressway Industrial Development Authority|access-date=6 December 2013|url-status=dead|archive-url=https://web.archive.org/web/20131207191714/http://yamunaexpresswayauthority.com/features|archive-date=7 December 2013}}</ref> ||[[Uttar Pradesh]]|| style=text-align:right|{{convert|165.5|km|mi|1|abbr=on|disp=br}}
| [[Raipur–Bilaspur Expressway|Raipur–Bilaspur]]
|6
| [[File:NH130-IN.svg|24px|center]]
|2012 August
| Tatibandh, [[Bilaspur district, Chhattisgarh|Bilaspur district]] – Tatibandh, [[Raipur]]
|<ref>
| Chhattisgarh
https://www.openstreetmap.org/relation/2258068</ref>
| {{cvt|127|km}}
|
| 4–6
| Intrastate brownfield
| {{Operational}}
| 1 May 2019
|-
|-
!colspan=2| Total
| [[Trans-Haryana Expressway|Trans-Haryana (Ambala–Narnaul)]]
!style=text-align:right|{{convert|1,728|km|mi|1|abbr=on|disp=br}}
| [[File:NH152D-IN.svg|24px|center]]
! colspan=4|
| Ghangheri, [[Kurukshetra district]] – Surana, [[Mahendragarh district]]
| Haryana
| {{cvt|227|km}}
| 6
| Intrastate
| {{Operational}}
| 1 August 2022<ref>{{cite news|author1=PTI|title=Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR|url=https://swarajya.com/infrastructure/haryana-six-lane-ambala-narnaul-expressway-opened-for-public-to-ease-traffic-in-delhi-ncr|work=Swarajya|date=1 August 2022|access-date=1 August 2022|language=en}}</ref>
|-
|-
| [[Mumbai–Nashik Expressway|Mumbai-Nashik]]
| [[File:NH3-IN.svg|24px|center]]
| [[Nashik]] – [[Thane]]
| Maharashtra
| {{cvt|150|km}}
| 4-6
| Intrastate
| {{Operational}}
| 2009
|}
|}


== List of Expressways (Under-Construction) ==
=== Under-construction national expressways ===
 
{{sticky header}}{{sort under}}
<nowiki>*</nowiki> Ready to inaugurate
{{static row numbers}}
 
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
Total length listed in this table is {{convert|10,647.524|km|mi||abbr=on}}.
|+ Overview of under-construction national expressways of India
{| class="wikitable sortable" width="80%"
|+
!Name
!States
! data-sort-type="number" |Length (km/mi)
!Expected Date of Completion
|-
|-
| [[Ahmedabad–Dholera Expressway]]
! Expressway
| [[Gujarat]]
! class="unsortable" | Sign
| align="right" |{{Convert|110|km|mi|abbr=on}}
! Terminus
| 2023 March
! Locale
! data-sort-type="number" | Length
! Lanes
! Type
! Construction began
! Opening
|-
|-
|[[Ambala]][[Narnaul]] Expressway
| [[Ahmedabad–Dholera Expressway|Ahmedabad–Dholera]]
([[Trans–Haryana Expressway]])
| [[File:NE8-IN.svg|24px|center]]
|[[Haryana]]
| Sarkhej, [[Ahmedabad]] – Adhelai, [[Bhavnagar district]]
|
| Gujarat
 
| {{cvt|109|km}}
 
| 4–6
 
| Intrastate
227 km
| 2021<ref name="ahmedabad_dholera">{{Cite web |date=2025-06-24 |title=Ahmedabad Dholera Expressway: Opening Date & Latest Updates (2025) |url=https://www.blackridgeresearch.com/project-profiles/ahmedabad-dholera-expressway-contractors-cost-opening-date-status-latest-updates |access-date=2025-07-01 |website=Latest Global Construction Industry Projects (2024) - Blackridge Research & Consulting |language=en}}</ref>
 
| 2026<ref name="ahmedabad_dholera"/>
(141 mi)
|2022 February
|-
|-
| Airoli–Katai Naka Freeway
| [[Amas–Darbhanga Expressway|Amas–Darbhanga]]
| [[Maharashtra]]
| [[File:NH119D-IN.svg|24px|center]]
| align="right" |{{Convert|12.3|km|mi|abbr=on}}
| Amas, [[Gaya, India|Gaya ]] , [[Patna]], [[Darbhanga]]
| 2023 March
| Bihar
| {{cvt|189|km}}
| 4–6
| Intrastate
| 2022<ref>{{Cite web |title=Amas - Darbhanga Expressway - Information & Status |url=https://themetrorailguy.com/nhai-amas-darbhanga-expressway-route-map-status-update/ |access-date=2025-07-01 |website=The Metro Rail Guy |language=en-US}}</ref>
| 2026<ref>{{Cite news |date=2024-01-08 |title=Amas Darbhanga Expressway Bihar - Greenfield Expressway NH 119D |url=https://www.magicbricks.com/blog/amas-darbhanga-expressway/134042.html/ |archive-url=https://web.archive.org/web/20240929112410/https://www.magicbricks.com/blog/amas-darbhanga-expressway/134042.html/ |archive-date=2024-09-29 |access-date=2025-07-01 |work=Magicbricks Blog |language=en}}</ref>
|-
|-
| [[Amritsar–Jamnagar Expressway]]<ref>{{Cite news|url=https://www.financialexpress.com/infrastructure/roadways/nitin-gadkaris-ambitious-infrastructure-plan-5-new-greenfield-highways-to-come-up-on-major-routes/1166757/|title=Nitin Gadkari's ambitious infrastructure plan: 5 new greenfield highways to come up on major routes|date=14 May 2018|work=The Financial Express|access-date=2 September 2018|language=en-US}}</ref>
| [[Ambala-Shamli Expressway|Ambala-Shamli]]
| [[Punjab, India|Punjab]], [[Haryana]], [[Rajasthan]], [[Gujarat]]
|
| align="right" |{{convert|1257|km|mi|1|abbr=on}}
| Sadopur, [[Ambala district]] – Gogwan Jalalpur, [[Shamli district]]
| 2023 March
| Haryana and Uttar Pradesh
| {{cvt|121|km}}
| 6
| Inter-state
| 2023<ref>{{Cite web |title=Shamli to Ambala: Connecting Small Cities with Big Dreams! |author=@rahstaexpo_ |url=https://www.instagram.com/reel/C932erptAO0/ |access-date=2025-06-30 |website=www.instagram.com}}</ref>
| 2026<ref>{{Cite web |title=GRAP norms bring NHAI projects to halt |url=https://www.tribuneindia.com/news/haryana/grap-norms-bring-nhai-projects-to-halt/ |access-date=2025-06-30 |website=The Tribune |language=en}}</ref>
|-
|-
| [[Amritsar Ring Road]]<ref>{{cite news |url= https://www.jagran.com/punjab/amritsar-circular-road-to-be-built-around-gurunagri-with-700-crore-joshi-20392542.html|title=Outer ring road for Amritsar|newspaper=Dainik Jagran|date=10 June 2020|access-date=10 June 2020}}</ref>  
| [[Awadh Expressway|Awadh (Kanpur–Lucknow)]]
| [[Punjab]]
| [[File:NE6-IN.svg|24px|center]]
| align="right" |{{convert|98|km|mi|1|abbr=on}}
| Azad Chauraha, [[Kanpur]] – Shaheed Path, [[Lucknow]]
| 2022
| Uttar Pradesh
| {{cvt|62.76|km}}
| 6
| Intrastate
| 2022<ref>{{Cite web |date=2022-02-23 |title=PNC Wins Kanpur Lucknow Expressway's Contract |url=https://themetrorailguy.com/2022/02/23/pnc-wins-kanpur-lucknow-expressways-contract/ |access-date=2022-04-25 |website=The Metro Rail Guy |language=en-US}}</ref>
| 2026<ref>{{Cite web |last=Shewaramani |first=Jatin |date=2025-01-02 |title=Lucknow News Roundup {{!}} Awadh Expressway to be ready by June, temp to drop in next 48 hrs & more |url=https://www.knocksense.com/lucknow/lucknow-news-roundup-awadh-expressway-to-be-ready-by-june-temp-to-drop-in-next-48-hrs-more |access-date=2025-06-25 |website=Knocksense |language=en}}</ref>
|-
|-
| [[Bengaluru–Chennai Expressway]]<ref>{{cite news |url=http://www.thehindu.com/news/states/tamil-nadu/article2557950.ece |title=Project report on Bangalore-Chennai Expressway may get ready by March |date=21 October 2011 |access-date=16 August 2012 |work=[[The Hindu]] |archive-url=https://web.archive.org/web/20120502054001/http://www.thehindu.com/news/states/tamil-nadu/article2557950.ece |archive-date=2 May 2012 |url-status=dead }}</ref> ||[[Karnataka]], [[Andhra Pradesh]], [[Tamil Nadu]]
| [[Bengaluru–Vijayawada Expressway|Bengaluru–Vijayawada]]
| align="right" |{{convert|258|km|mi|1|abbr=on}}
| [[File:NH544G-IN.svg|24px|center]]
| 2024 March
| [[Bengaluru]] – [[Vijaywada]]
| Karnataka, Andhra Pradesh
| {{cvt|518|km}}
| 6
| Inter-state
| 2023<ref>{{cite web|title=Bangalore–Vijayawada Expressway – Information & Status|url=https://themetrorailguy.com/nhai-bengaluru-vijayawada-expressway-route-map-status-update/|website=The Metro Rail Guy|access-date=14 March 2024}}</ref>
| 2027<ref>{{cite news|title=PM Modi Inaugurates, Lays Foundation Stone For 112 National Highway Projects|url=https://www.ndtv.com/india-news/pm-modi-inaugurates-lays-foundation-stone-for-112-national-highway-projects-5217246work=NDTV|date=11 March 2024|access-date=14 March 2024|language=en}}</ref>
|-
|-
| [[Bangalore–Mysore Infrastructure Corridor]]<ref name="Manual">{{Cite web |url=http://bmicapa.org/ |title=Bengaluru Mysuru Infrastructure Corridor Area Planning Authority |access-date=16 August 2012}}</ref>
| [[National Highway 352W (India)|Delhi–Jaipur]]
| [[Karnataka]]
| [[File:NH352W-IN.svg|24px|center]]
| align="right" |{{convert|111|km|mi|1|abbr=on}}
| Kherki Dhaula Toll, Gurgaon – Chandwaji, [[Jaipur]]
| 2022 August
| Delhi, Haryana and Rajasthan
| {{cvt|195|km}}
| 4
| Inter-state
| 2025<ref>{{Cite web |title=Full Guide to the Delhi–Jaipur Expressway: Timeline, Route, Real Estate Growth - Times Property |url=https://timesproperty.com/article/post/all-about-delhi-jaipur-expressway-blid9995 |access-date=2025-06-30 |website=timesproperty}}</ref>
| 2027<ref>{{Cite web |title=Delhi - Jaipur Super Expressway – Information & Status |url=https://themetrorailguy.com/nhai-delhi-jaipur-expressway-information-route-map-status/ |access-date=2025-06-30 |website=The Metro Rail Guy |language=en-US}}</ref>
|-
|-
| [[Bundelkhand Expressway]]<ref>{{cite news|url=https://www.aninews.in/news/national/general-news/work-on-bundelkhand-expressway-to-start-from-next-year-adityanath201711241820080006/|title=Bundelkhand Expressway construction would start from 2018|date=24 November 2017|work=[[Asian News International|ANI]]}}</ref>
| [[Delhi–Amritsar–Katra Expressway|Delhi–Katra]]
| [[Uttar Pradesh]]
| [[File:NE5-IN.svg|24px|center]]
| align="right" |{{convert|296|km|mi|1|abbr=on}}
| [[Bahadurgarh|Bahadurgarh border]], Delhi – [[Katra, Jammu and Kashmir|Katra]]
| 2022 December
| Delhi, Haryana, Punjab, Jammu and Kashmir
| {{cvt|670|km}}
| 4
| Inter-state
| 2021<ref>{{Cite web|last=Livemint|date=2021-09-16|title=Delhi-Katra in 6 hours by road. Expressway to be launched in 2 years|url=https://www.livemint.com/industry/infrastructure/delhikatra-in-6-hours-by-road-expressway-to-be-launched-in-2-years-11631766099337.html|access-date=2021-09-16|website=livemint.com|language=en}}</ref>
| 31 December 2025<ref name=bar1>[https://www.tribuneindia.com/news/punjab/barring-punjab-669-km-delhi-katra-e-way-almost-complete-in-most-states/ Barring Punjab, 669 km Delhi-Katra e-way almost complete in most states], The Tribune, 23 Aug 2024.</ref>
|-
|-
| [[Chennai Port–Maduravoyal Expressway]]<ref>{{Cite news|url=http://www.thehindu.com/news/national/tamil-nadu/chennai-port-maduravoyal-corridor-to-have-6-lanes/article23247907.ece|title=Chennai Port-Maduravoyal corridor to have 6 lanes|date=15 March 2018|work=The Hindu|access-date=30 May 2018}}</ref>
| [[Durg–Raipur–Arang Expressway|Durg–Arang]]
| [[Tamil Nadu]]
|
| align="right" |{{convert|19|km|mi|1|abbr=on}}
| Tendesara, [[Rajnandgaon district]] – Mahanadi Bridge, [[Arang]]
| 2023
| Chhattisgarh
| {{cvt|92|km}}
| 6
| Intrastate
| 2022<ref>{{Cite web |title=Chhattisgarh Infrastructure: Durg set for major infra boost with expressways, metro, and industrial projects |url=https://propnewstime.com/getdetailsStories/MTc0NDU=/chhattisgarh-infrastructure-durg-set-for-major-infra-boost-with-expressways-metro-and-industrial-projects |access-date=2025-07-01 |website=propnewstime.com |language=en-US}}</ref>
| 30 June 2026<ref>{{cite web| url=https://datalakeg.nhai.gov.in/nhai/MISC/ProjectDetailsAdvance?key=U2FsdGVkX19J2F+ZuOrtXcZbaofL0CAML11h2sXoZGF7qFuNmKjkQNaVwCcr383D | title=Project Details | publisher=NHAI | date=27 December 2022 }}</ref>
|-
|-
| [[Coastal Road (Mumbai)]]
| [[Faridabad–Noida–Ghaziabad Expressway|Faridabad–Ghaziabad]]
| [[Maharashtra]]
| style="text-align: center;" |
| align="right" |{{Convert|29.2|km|mi|abbr=on}}
| Greater Faridabad, [[Faridabad]] – Rahul Vihar, [[Ghaziabad]]
| 2022 June
| Uttar Pradesh and Haryana
| {{cvt|56|km}}
| 6
| Inter-state
| 2025<ref>{{Cite web |last=Tamta |first=Prashant |title=Delhi-NCR news: BIG update on long-pending Faridabad-Noida-Ghaziabad expressway, authorities agree to... |url=https://www.dnaindia.com/india/report-delhi-ncr-news-big-update-on-long-pending-faridabad-noida-ghaziabad-expressway-authorities-agree-to-3145475 |access-date=2025-06-30 |website=DNA India |language=en}}</ref>
| 2027<ref>{{Cite web |title=FNG Expressway: Route, Status And Construction Timeline |url=https://www.91infra.com/news/fng-expressway-route-status-and-construction-timeline |access-date=2025-06-30 |website=www.91infra.com |language=en}}</ref>
|-
|-
| [[DND–KMP Expressway]]
| [[Ghaziabad-Kanpur Expressway]]
| [[Delhi]], [[Haryana]]
| style="text-align: center;" |
| align="right" |{{Convert|59|km|mi|abbr=on}}
| [[Ghaziabad]] [[Kanpur]]
| 2023
| Uttar Pradesh
| {{cvt|380|km}}
| 6
| Intrastate
| 2025<ref name="ghaziabad_kanpur">{{Cite web |title=Ghaziabad-Kanpur Expressway to link 9 UP districts, may be extended to Jewar Airport |url=https://www.moneycontrol.com/city/ghaziabad-kanpur-expressway-to-link-9-up-districts-may-be-extended-to-jewar-airport-article-12982157.html |archive-url=https://web.archive.org/web/20250511160028/https://www.moneycontrol.com/city/ghaziabad-kanpur-expressway-to-link-9-up-districts-may-be-extended-to-jewar-airport-article-12982157.html |archive-date=2025-05-11 |access-date=2025-07-01 |website=Moneycontrol |language=en-US}}</ref>
| 2026<ref name="ghaziabad_kanpur"/>
|-
|-
| [[Delhi–Amritsar–Katra Expressway]]<ref>{{Cite news|url=http://www.tribuneindia.com/news/amritsar/nhai-nod-for-asr-delhi-highway-extension/394525.html|title=NHAI nod for Asr-Delhi highway extension|date=19 April 2017|work=The Tribune|access-date=2 October 2017|archive-url=https://archive.today/20171002073655/http://www.tribuneindia.com/news/amritsar/nhai-nod-for-asr-delhi-highway-extension/394525.html|archive-date=2 October 2017|url-status=live}}</ref>
| [[Hyderabad–Indore Expressway|Hyderabad–Indore]]
| [[Delhi]], [[Haryana]], [[Punjab, India|Punjab]], [[Jammu and Kashmir (union territory)|Jammu and Kashmir]]
| style="text-align: center;" |
| align="right" |{{Convert|687|km|mi|abbr=on}}
| [[Hyderabad]] – [[Indore]]
| 2023 December
| Telangana, Maharashtra and Madhya Pradesh
| {{cvt|713|km}}
| 4
| Inter-state brownfield
| 2024<ref>{{Cite web |last=Bharat |first=E. T. V. |date=2025-01-10 |title=Gadkari Carries Out Aerial Inspection Of 33-Km Stretch Of High-Speed Indore-Hyderabad Corridor |url=https://www.etvbharat.com/en/!state/union-minister-nitin-gadkari-aerial-inspection-33-km-stretch-of-high-speed-indore-hyderabad-corridor-enn25010907180 |access-date=2025-06-30 |website=ETV Bharat News |language=en}}</ref>
| 2025<ref>{{Cite web |title=Indore-Hyderabad Economic Corridor – Information & Status Update |url=https://themetrorailguy.com/nhai-indore-hyderabad-economic-corridor-information-route-map-status/ |access-date=2025-06-30 |website=The Metro Rail Guy |language=en-US}}</ref>
|-
|-
| [[Delhi–Mumbai Expressway]]<ref>{{cite web |url = https://www.hindustantimes.com/india-news/soon-new-delhi-mumbai-expressway-project-to-cost-rs-1-lakh-crore-nitin-gadkari/story-9OUM2mNyhqKFFvSXlByoPJ.html|title = Govt announces plans to build Delhi-Mumbai expressway for Rs 1 lakh crore |work = Hindustan Times}}</ref>
| [[Jaipur–Bandikui Expressway|Jaipur–Bandikui]]
| [[Delhi]], [[Haryana]], [[Rajasthan]], [[Madhya Pradesh]], [[Gujarat]], [[Maharashtra]]
| style="text-align: center;" | NE-4C
| align="right" |{{Convert|1350|km|mi|abbr=on}}
| [[Jaipur]] – [[Bandikui]]
| 2023 March
| Rajasthan
| {{cvt|67|km}}
| 4
| Intrastate spur
| 2022<ref>{{Cite web |title=Salient Features – GR Bandikui Jaipur Expressway Private Limited |url=https://www.grbjepl.com/salient-features/ |access-date=2025-06-29 |language=en-US}}</ref>
| 1 July 2025<ref>{{Cite news |title=From July, travel time between Delhi and Jaipur to reduce by an hour |url=https://www.hindustantimes.com/cities/others/from-july-travel-time-between-delhi-and-jaipur-to-reduce-by-an-hour-101750875429291.html |access-date=26 June 2025}}</ref>
|-
|-
| [[Northern Peripheral Road|Dwarka Expressway]]
| [[Ludhiana–Bathinda–Ajmer Expressway|Ludhiana–Ajmer]]
| [[Delhi]], [[Haryana]]
| style="text-align: center;" | EC-8
| align="right" |{{Convert|27.6|km|mi|abbr=on}}
| [[Ludhiana]] [[Ajmer]]
| 2022 August
| Punjab, Haryana and Rajasthan
| {{cvt|600|km}}
| 6
| Inter-state economic corridor
| 2025<ref>{{Cite web |title=Work begins to build Ludhiana-Bathinda national highway at Rs 1,555 crore |url=https://www.tribuneindia.com/news/ludhiana/work-begins-to-build-ludhiana-bathinda-national-highway-at-1555-crore/ |access-date=2025-06-30 |website=The Tribune |language=en}}</ref>
| TBD
|-
|-
| [[Faridabad–Noida–Ghaziabad Expressway]]
| [[Nagpur–Vijayawada Expressway|Nagpur–Vijayawada]]
| [[Delhi]], [[Haryana]], [[Uttar Pradesh]]
| style="text-align: center;" |
| align="right" |{{Convert|56|km|mi|abbr=on}}
| [[Nagpur]] [[Vijaywada]]
|2023
| Maharashtra, Telangana and Andhra Pradesh
| {{cvt|405|km}}
| 4
| Inter-state economic corridor
| 2023<ref name="nagpur_vijaywada">{{Cite web |title=Nagpur-Vijayawada Economic Corridor – Information & Status Update |url=https://themetrorailguy.com/nhai-nagpur-vijayawada-economic-corridor-information-route-map-status/ |access-date=2025-06-30 |website=The Metro Rail Guy |language=en-US}}</ref>
| 2027<ref name="nagpur_vijaywada"/>
|-
|-
| [[Ganga Expressway]](Meerut–Prayagraj)
| [[Paniyala–Barodamev Expressway|Paniyala–Barodamev]]
| [[Uttar Pradesh]]
|
| align="right" |{{convert|594|km|mi|1|abbr=on}}
| Paniyala Mod, [[Kotputli]] – Barodamev, [[Alwar]]
| 2024
| Haryana and Rajasthan
| {{cvt|86.5|km}}
| 6
| Inter-state economic corridor
| 2024<ref name="paniyala">{{cite web | url=https://timesofindia.indiatimes.com/city/jaipur/six-lane-highway-project-in-alwar-integrates-23-animal-underpasses/articleshow/118512485.cms | title=Six-lane highway project in Alwar integrates 23 animal underpasses | publisher=The Times of India | date=24 February 2025 }}</ref>
| 2026<ref name="paniyala" />
|-
|-
| [[National Highway 152D (India)| Trans–Haryana Expressway]] (Ambala–Narnaul)
| [[Raipur-Ranchi-Dhanbad Expressway|Raipur–Dhanbad]]
| [[Haryana]]
| style="text-align: center;" | EC-7
| align="right" |{{convert|227|km|mi|1|abbr=on}}
| Dharsiwa, [[Raipur district]] – [[Dhanbad]]
| 2022 February
| Chhattisgarh and Jharkhand
| {{cvt|707|km}}
| 4
| Inter-state economic corridor
| 2023<ref>{{Cite web |title=PM Inaugurates, Lays Foundation Stones in Raipur |url=https://www.drishtiias.com/state-pcs-current-affairs/pm-inaugurates-lays-foundation-stones-in-raipur |access-date=2025-06-30 |website=Drishti IAS |language=en}}</ref>
| 2026<ref>{{Cite web |title=Raipur-Dhanbad expressway and rail upgrades to reshape Coal Capital's future |url=https://propnewstime.com/getdetailsStories/MTc4Mzc=/raipur-dhanbad-expressway-and-rail-upgrades-to-reshape-coal-capital-s-future |access-date=2025-06-30 |website=propnewstime.com |language=en-US}}</ref>
|-
|-
| [[Gorakhpur Link Expressway]]<ref>{{Cite web|url= https://www.dailypioneer.com/2019/state-editions/up-govt-approves-bids--for-two-expressways.html|title=Gorakhpur link expressway |access-date=14 November 2019}}</ref>
| [[Raipur–Hyderabad Expressway|Raipur–Hyderabad]]
| [[Uttar Pradesh]]
| style="text-align: center;" |
| align="right" |{{convert|91.35|km|mi|1|abbr=on}}
| Patan, [[Raipur]] – [[Hyderabad]]
| 2022 March
| Chhattisgarh, Maharashtra and Telangana
| {{cvt|530|km}}
| 6
| Inter-state
| 2023<ref name="raipur_hyderabad">{{Cite news |date=2025-01-17 |title=Raipur-Hyderabad Expressway to cut down travel time between the cities by 2025 |url=https://timesofindia.indiatimes.com/life-style/travel/raipur-hyderabad-expressway-to-cut-down-travel-time-between-the-cities-by-2025/articleshow/117330246.cms |access-date=2025-07-01 |work=The Times of India |issn=0971-8257}}</ref>
| 2026<ref name="raipur_hyderabad"/>
|-
|-
| [[Lucknow–Kanpur Expressway]]*
| [[Raipur-Visakhapatnam Expressway|Raipur–Visakhapatnam]]
| [[Uttar Pradesh]]
| [[File:NH130CD-IN.svg|24px|center]]
| align="right" |{{Convert|66|km|mi|abbr=on}}
| [[Abhanpur]], [[Raipur district]] – [[Visakhapatnam Port]], [[Visakhapatnam]]
| 2023 October
| Chhattisgarh, Odisha and Andhra Pradesh
| {{cvt|464|km}}
| 6
| Inter-state economic corridor
| 2022<ref name="raipur_vishakhapatnam">{{cite news|author1=Mishra, Pawni|title=Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates|url=https://www.magicbricks.com/blog/raipur-visakhapatnam-expressway-route/128499.html|work=MagicBricks|date=13 April 2022|access-date=14 March 2023|language=en}}</ref>
| 2026<ref name="raipur_vishakhapatnam"/>
|-
|-
| [[National Highway 230 (India)|Lucknow Outer Ring Road]]
| [[Surat–Chennai Expressway|Surat–Chennai]]
| [[Uttar Pradesh]]
| style="text-align: center;" |
| align="right" |{{Convert|108|km|mi|abbr=on}}
| [[Surat district]] – [[Chennai district]]
| 2021 December
| Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh and Tamil Nadu
| {{cvt|1271|km}}
| 6
| Inter-state
| 2023<ref name="surat_chennai">{{cite news|title=PM Modi lays foundation stone for Karnataka section of 6-lane Surat-Chennai Expressway|url=https://www.timesnownews.com/chennai/pm-modi-lays-foundation-stone-for-karnataka-section-6-lane-surat-chennai-expressway-article-97143601|work=Times Now|date=19 January 2023|access-date=12 March 2023|language=en}}</ref>
| 2026<ref name="surat_chennai"/>
|-
|-
| [[Loknayak Ganga Path]]
| [[Urban Extension Road-II]]
| [[Bihar]]
| style="text-align: center;" | NH-344M
| align="right" |{{Convert|39.5|km|mi||abbr=on}}
| [[Alipur, Delhi|Alipur]] – [[Mahipalpur]]
| 2022 December
| Delhi NCR
| {{cvt|75.7|km}}
| 6
| Urban
| 2021<ref>{{Cite web |title=Delhi Urban Extension Road 2 – Information & Status |url=https://themetrorailguy.com/nhai-delhi-uer-2-expressway-information-route-map-status/ |access-date=2025-06-30 |website=The Metro Rail Guy |language=en-US}}</ref>
| 2025<ref>{{cite web| url=https://www.hindustantimes.com/cities/delhi-news/delhis-3rd-ring-road-to-open-by-august-101749232096294.html| title=Delhi’s 3rd Ring Road to open by August |date=7 June 2025 | publisher=Hindustan Times}}</ref>
|-
|-
| [[Ludhiana Elevated corridor]]
| [[Varanasi–Kolkata Expressway|Varanasi–Kolkata]]
| [[Punjab]]
| style="text-align: center;" | NH-319B
| align="right" |{{Convert|13|km|mi||abbr=on}}
| Varanasi Ring Road, [[Chandauli district]] – Sarisha, [[Diamond Harbour]]
|
| Uttar Pradesh, Bihar, Jharkhand, West Bengal
| {{cvt|710|km}}
| 6
| Inter-state
| 2024<ref>{{cite news|last=Yadav|first=Anshika|title=Varanasi Ranchi Kolkata Expressway 6 Lane E-Way To Reduce Time By 6 Hours|url=https://www.magicbricks.com/news/varanasi-ranchi-kolkata-expressway/134414.html|work=Magicbricks|date=23 February 2024|access-date=23 February 2024|language=en}}</ref>
| 2027<ref name="varanasi_kolkata">{{cite news|author1=Mishra, Amit|title=NHAI's Ambitious 610-Km Varanasi-Kolkata Expressway To Be Operational By 2027|url=https://swarajya.com/amp/story/news-headlines%2Fnhais-ambitious-610-km-varanasi-kolkata-expressway-to-be-operational-by-2027|work=Swarajya|date=9 December 2022|access-date=10 December 2022|language=en}}</ref>
|-
|-
| [[Mumbai Trans Harbour Link]]
|[[Gorakhpur–Siliguri Expressway|Gorakhpur–Siliguri]]  
| [[Maharashtra]]
| style="text-align: center;" |
| align="right" |{{Convert|21.8|km|mi|abbr=on}}
|[[Gorakhpur]] - [[Siliguri]]
| 2022 June
|Uttar Pradesh, Bihar, West Bengal
|519 km (322 mi)
|4
|Inter-state
|2025
|2028
|-
|-
| [[Mumbai–Nagpur Expressway]]<ref>{{cite web |title=Work on Nagpur-Mumbai expressway begins in full swing - Times of India |url=https://timesofindia.indiatimes.com/city/nagpur/work-on-nag-mum-eway-begins-in-full-swing/articleshow/67631967.cms |website=The Times of India}}</ref>
|[[Kharagpur–Morgram Expressway|Kharagpur–Morgram]]
| [[Maharashtra]]
| style="text-align: center;" |NH - 116A
| align="right" |{{convert|701|km|mi|1|abbr=on}}
|[[Kharagpur]] – [[Morgram]]
| 2022 May
|West Bengal
|{{cvt|230|km}}
|4
|Intrastate
|2025
|2028
|}
 
=== Proposed national expressways ===
{{sticky header}}{{sort under}}
{{static row numbers}}
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
|+ Overview of proposed national expressways of India
|-
|-
| [[Pathankot-Ajmer Expressway]]
! Expressway
| [[Punjab]], [[Haryana]], [[Rajasthan]]
<!-- ! class="unsortable" | Sign -->
| align="right" |{{Convert|600|km|mi|abbr=on}}
! Terminus
|
! Locale
! data-sort-type="number" | Length
! Lanes
! Type
! Proposed in
|-
|-
| [[Peripheral Ring Road]]
| Bhopal–Indore
| [[Karnataka]]
| Kalan, [[Bhopal]] – Karnawad, [[Indore district]]
| align="right" |{{Convert|65.5|km|mi|abbr=on}}
| Madhya Pradesh
|
| {{cvt|157|km}}
| 6
| Intrastate
| 2025<ref>{{Cite web |date=2025-02-25 |title=Bhopal to boast India's best transport system: Multi-state travel within 12 hours |url=https://www.patrika.com/en/special-news/bhopal-to-boast-indias-best-transport-system-multi-state-travel-within-12-hours-19422367 |access-date=2025-07-01 |website=Patrika News |language=en}}</ref>
|-
|-
| [[Purvanchal Expressway]]*<ref>{{cite news|url=http://zeenews.india.com/india/pm-narendra-modi-to-lay-foundation-stone-of-purvanchal-expressway-amid-bjp-sp-war-over-credit-2124457.html |title=PM Narendra Modi to lay foundation stone of Purvanchal Expressway amid BJP, SP war over 'credit' |work=Zee News|date=14 July 2018|access-date=14 July 2018}}</ref>
| [[Atal Progress-Way|Chambal (Kota–Etawah)]]
| [[Uttar Pradesh]]
| Seemalya, [[Kota district]] – Nanawa, [[Etawah district]]
| align="right" |{{convert|340.824|km|mi|1|abbr=on}}
| Rajasthan, Madhya Pradesh and Uttar Pradesh
| 2021 October
| {{cvt|404|km}}
| 6
| Inter-state
| 2017<ref>{{cite web|title=Chambal Expressway aka Atal Progressway Complete Project Details|url=https://indianconstructioninfo.com/chambal-expressway/|work=indianconstructioninfo.com|access-date=16 March 2023|language=en}}</ref>
|-
|-
| [[Raipur–Visakhapatnam Expressway]]
| [[Haldia–Raxaul Expressway|Haldia–Raxaul]]
| [[Chhattisgarh]], [[Odisha]], [[Andhra Pradesh]]
| [[Haldia]] – Mehsi, [[Raxaul]]
| align="right" |{{convert|465|km|mi|1|abbr=on}}
| West Bengal, Jharkhand and Bihar
| 2024 March
| {{cvt|650|km}}
| 6
| Inter-state
| 2022<ref>{{Cite web |title=Six-Lane Expressway Connecting Raxaul To Haldia Coming Up By 2028, To Cost Rs 54,000 Crore |url=https://www.news18.com/auto/six-lane-expressway-connecting-raxaul-to-haldia-coming-up-by-2028-to-cost-rs-54000-crore-ws-dkl-9367337.html |access-date=2025-07-01 |website=News18 |language=en}}</ref>
|-
|-
| [[Sohna Elevated Corridor]]<ref>{{Cite web|url= https://www.hindustantimes.com/gurugram/sohna-elevated-road-project-slows-traffic-on-subhash-chowk-vatika-chowk/story-32TN61ug64mmHJJFGGTv6L.html|title=Sohna road expressway |access-date=13 January 2019}}</ref>
| Kharagpur–Visakhapatnam
| [[Haryana]]
| [[Kharagpur]] – [[Visakhapatnam]]
| align="right" |{{convert|21.65|km|mi|1|abbr=on}}
| West Bengal, Odisha and Andhra Pradesh
| 2022
| {{cvt|783|km}}
| 6
| Inter-state
| 2025<ref>{{Cite news |title=Kharagpur-Visakhapatnam Expressway to change Eastern India's road connectivity |url=https://timesofindia.indiatimes.com/travel/travel-news/kharagpur-visakhapatnam-expressway-to-change-eastern-indias-road-connectivity/articleshow/115742552.cms |access-date=2025-06-30 |work=The Times of India |issn=0971-8257}}</ref>
|-
|-
| Varanasi Ring Road<ref>{{cite web|url=https://www.patrika.com/varanasi-news/commissioner-nitin-gokarn-declaired-ring-road-phase-2-build-time-2237087/|title=New projects in Purvanchal}}</ref><ref>{{cite web|url=https://www.outlookindia.com/newsscroll/nhai-plans-to-develop-model-stretches-in-every-state/1850867|title=NHAI plans to develop Model Stretches in every state}}</ref>
| [[Ludhiana–Bathinda–Ajmer Expressway|Ludhiana–Ajmer]]
|[[Uttar Pradesh]]
| [[Ludhiana]] – [[Ajmer]]
| align="right" |{{Convert|63|km|mi|abbr=on}}
| Punjab Haryana and Rajasthan
|2022
| {{cvt|600|km}}
| 6
| Inter-state
| 2019<ref>{{Cite web |title=Shelved Ludhiana-Bathinda highway project back on track |url=https://www.tribuneindia.com/news/ludhiana/shelved-ludhiana-bathinda-highway-project-back-on-track/ |access-date=2025-07-01 |website=The Tribune |language=en}}</ref>
|-
|-
| Wazirabad–Mayur Vihar Elevated Expressway
| [[Nagpur–Hyderabad–Bengaluru Expressway|Nagpur–Bengaluru]]
|[[Delhi NCR]]
| [[Nagpur]] – [[Bengaluru Rural district]]
| align="right" |{{Convert|18|km|mi|abbr=on}}
| Maharashtra, Telangana, Andhra Pradesh and Karnataka
|
| {{cvt|1300|km}}
| 8
| Inter-state
| 2025<ref>{{Cite news |date=2024-09-20 |title=NHAI awards 251-km Hyderabad-Nagpur corridor for Rs 6,661 cr under TOT model |url=https://economictimes.indiatimes.com/news/economy/infrastructure/nhai-awards-251-km-hyderabad-nagpur-corridor-for-rs-6661-cr-under-tot-model/articleshow/113531437.cms?from=mdr |access-date=2025-07-01 |work=The Economic Times |issn=0013-0389}}</ref>
|-
|-
! colspan="2" |'''Total'''
| [[Narmada Expressway|Narmada]]
! colspan="2" |{{convert|10,647.524|km|mi|abbr=on}}
| [[Amarkantak]] – [[Alirajpur]]
|}
| Madhya Pradesh
 
| {{cvt|1100|km}}
== List of Expressways (Planned/ Proposed) ==
| 8
{| class="wikitable sortable" width=80%
| Intrastate
!Name
| 2020<ref>{{Cite web|url=https://www.freepressjournal.in/bhopal/bhopal-cabinet-gives-nod-to-906-km-narmada-expressway-construction|title=Bhopal: Cabinet gives nod to 906-km Narmada Expressway construction|website=Free Press Journal}}</ref>
!States
!data-sort-type="number" |Length (km/mi)
|-
|-
| [[Amaravati–Anantapur Expressway]]<ref>{{cite web |url=http://www.deccanchronicle.com/nation/current-affairs/041016/amaravati-anantapur-highway-to-cost-rs-27635-crore.html|title=Amaravati-Anantapur highway to cost Rs 27,635 crore}}</ref> ||[[Andhra Pradesh]]|| align="right" |{{convert|371.03|km|mi|1|abbr=on}}
| [[Palakkad–Kozhikode Greenfield Highway|Palakkad–Kozhikode]]
| [[Marutharode]], [[Palakkad district]] – [[Pantheeramkavu]], [[Kozhikode district]]
| Kerala
| {{cvt|121|km}}
| 4
| Intrastate
| 2025<ref>{{Cite web |date=2025-06-05 |title=Rs 6,700 crore boost for road development in Kerala |url=https://www.newindianexpress.com/states/kerala/2025/Jun/05/rs-6700-crore-boost-for-road-development-in-kerala |access-date=2025-07-01 |website=The New Indian Express |language=en}}</ref>
|-
|-
| Aurangabad-Darbhanga Expressway<ref>{{cite web |url=https://www.prabhatkhabar.com/state/bihar/bihar-first-green-field-expressway-gets-centre-nod-who-connect-magadh-to-mithila-aurangabad-to-darbhanga-know-when-this-is-ready-upl|title=Bihar's first green field expressway to connect Mithila with Magadha, how long will it be ready, how many districts will pass through it?}}</ref> ||[[Bihar]]|| align="right" |{{convert|271|km|mi|1|abbr=on}}
| Panipat–Dabwali
| [[Panipat district]] – Dabwali, [[Sirsa district]]
| Haryana
| {{cvt|300|km}}
| 4
| Intrastate
| 2025<ref>{{Cite web |author=<!--Staff writer(s); no by-line.--> | date=2025-02-04 |title=Haryana's Ambitious 300km Highway Project: Dabwali to Panipat Expressway |url=https://en.theharyanastory.com/article/1546/haryanas-ambitious-300km-highway-project-dabwali-to-panipat-expressway |access-date=2025-07-01 |website=en.theharyanastory.com |language=en}}</ref>
|-
|-
|Ballia Link Expressway<ref>{{cite web |url=https://timesofindia.indiatimes.com/city/lucknow/cm-oks-link-e-way-to-connect-ballia-ghazipur/articleshow/79972559.cms |title=CM Yogi Adityanath OKs link expressway to connect Ballia, Ghazipur |work=The Times of India |date=27 December 2020 }}</ref>
| [[Pune–Bengaluru Expressway|Pune–Bengaluru]]
|[[Uttar Pradesh]]
| [[Pune]] – Bengaluru rural district
|align="right" |{{Convert|30|km|mi|abbr=on}}
| Maharashtra and Karnataka
| {{cvt|700|km}}
| 8
| Inter-state
| 2022<ref>{{Cite web |date=2025-05-23 |title=Pune Bengaluru Expressway - Route, Map, Cost, Progress, and More - Infra Info Hub |url=https://infrainfohub.com/pune-bengaluru-expressway-route-map-cost-progress/ |access-date=2025-05-23 |language=en-US}}</ref>
|-
|-
| [[Bangalore–Mysore Infrastructure Corridor]]<ref name="Manual" /> ||[[Karnataka]]|| align="right" |{{convert|111|km|mi|1|abbr=on}}
| Ranchi–Jamshedpur
| [[Ranchi district]] [[Jamshedpur]]
| Jharkhand
| {{cvt|220|km}}
| 4
| Intrastate brownfield
| 2025<ref>{{cite web | url=https://www.magicbricks.com/blog/ranchi-jamshedpur-highway/132080.html | title=Ranchi Jamshedpur highway | publisher=magicbricks | date=22 April 2025 }}</ref>
|-
|-
|Buxar Bhagalpur Expressway
| [[Thiruvananthapuram–Angamaly Greenfield Highway|Thiruvananthapuram–Angamaly]]
|[[Bihar]]
| [[Pulimath]], [[Thiruvananthapuram district]] – [[Angamaly]], [[Ernakulam district]]
|350 km (217.4 mi)
| Kerala
| {{cvt|257|km}}
| 6
| Intrastate
| 2023 (Stalled)<ref>{{Cite news |date=2024-12-12 |title=No plans to go ahead with greenfield NH projects, says Centre |url=https://www.thehindu.com/news/national/kerala/no-plans-to-go-ahead-with-greenfield-nh-projects-says-centre/article68978045.ece |access-date=2025-07-01 |work=The Hindu |language=en-IN |issn=0971-751X}}</ref>
|}
 
== Bypass expressways ==
=== Operational bypass expressways ===
{{sticky header}}{{sort under}}
{{static row numbers}}
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
|+ Overview of fully and partially operational bypass expressways of India
|-
|-
| [[Chambal Expressway]]<ref>{{Cite news|url=http://www.freepressjournal.in/bhopal/bhopal-nitin-gadkari-gifts-narmada-chambal-expressways/1011344|title=Nitin Gadkari gifts Narmada, Chambal Expressways|work=Free Press|access-date=8 October 2017}}</ref>
! Bypassing city
|[[Madhya Pradesh]], [[Uttar Pradesh]]
! Expressway
| align="right" |{{Convert|404|km|mi|abbr=on}}
! class="unsortable" | Sign
! Terminals
! Locale
! data-sort-type="number" | Length
! Lanes
! Owner
! Status
! Opening
|-
|-
| [[Chennai Elevated Expressways]]<ref>{{cite web |url=http://www.cmdachennai.gov.in/Volume1_English_PDF/Vol1_Chapter04_Transport.pdf |title=Chennai Elevated Road |publisher=CMDA |access-date=9 January 2016}}</ref> ||[[Tamil Nadu]]|| align="right" |{{convert|10|km|mi|1|abbr=on}}
| [[Bengaluru]]
| [[Satellite Town Ring Road|Satellite Town Ring]]
| [[File:NH948A-IN.svg|24px|center]]
| [[Dobbaspet]], [[Bengaluru Rural district]] – [[Hosur]]
| Karnataka and Tamil Nadu
| {{cvt|280.8|km}}
| 4–6
| NHAI
| {{Maybe|Partially opened}}
| December 2025<ref>{{Cite web |title=Bangalore Satellite Town Ring Road – Information & Status |url=https://themetrorailguy.com/nhai-bangalore-satellite-town-ring-road-route-map-status-update-tenders/ |access-date=2025-07-01 |website=The Metro Rail Guy |language=en-US}}</ref>
|-
|-
| Chennai Surat Expressway<ref name="Manual" /> || [[Gujarat]], [[Maharashtra]], [[Telangana]], [[Karnataka]], [[Andhra Pradesh]], [[Tamil Nadu]]|| align="right" |{{convert|1461|km|mi|1|abbr=on}}
| [[Chennai]]
| [[Chennai Bypass Road|Chennai Bypass]]
| [[File:AH20-IN.svg|24px|center]]
| [[Pulhal|Puzhal]], Chennai – [[Perungalathur]], Chennai
| Tamil Nadu
| {{cvt|32|km}}
| 6
| NHAI
| {{Operational}}
| 2010<ref>{{Cite web  |date=2024-10-02 |title=NHAI mulls linking service roads along bypass from Madhavaram to Irumbuliyur |url=https://www.newindianexpress.com/cities/chennai/2024/Oct/02/nhai-mulls-linking-service-roads-along-bypass-from-madhavaram-to-irumbuliyur |access-date=2025-07-01 |website=The New Indian Express |language=en}}</ref>
 
|-
|-
| [[Delhi–Saharanpur–Dehradun Expressway]]
| [[Delhi]]
| [[Delhi]], [[Uttar Pradesh]], [[Uttrakhand]]
| [[Eastern Peripheral Expressway|Eastern Peripheral]]
| align= "right"|{{Convert|180|km|mi|abbr=on}}
| [[File:NE2-IN.svg|24px|center]]
| [[Kundli]], [[Sonipat]] – Dholgarh, [[Palwal]]
| Haryana and Uttar Pradesh
| {{cvt|135|km}}
| 6
| NHAI
| {{Operational}}
| 27 May 2018<ref name="stat1">{{Cite news |title=Gurgaon: Kundli-Manesar expressway inauguration today |url=https://indianexpress.com/article/cities/delhi/gurgaon-sultanpur-kundli-manesar-expressway-inauguration-5452647/ |access-date=5 Nov 2018}}</ref>
|-
|-
|[[Ganga Expressway|Ganga Expressway Phase-2]]<ref>{{cite web|url=http://upeida.in/site/writereaddata/UploadNews/corrigendum/pdf/C_201902011804205533.pdf|title=Proposed Alignment}}</ref><ref>{{cite web|url=https://timesofindia.indiatimes.com/city/lucknow/ganga-e-way-alignment-plans-ready-for-cm-nod-before-consultant-invite/articleshow/71175909.cms|title=Ganga e-way alignment plans ready for UP CM's nod}}</ref><ref>{{cite web |url=http://www.financialexpress.com/news/7-bids-for-upper-ganga-canal-expressway/589281/ |title=7 bids for Upper Ganga Canal Expressway |publisher=Financialexpress.com |date=11 March 2010 |access-date=16 July 2010}}</ref><ref>{{cite web |url=http://www.indiantollways.com/2009/12/03/no-state-consent-nhai-goes-ahead-with-four-laning-of-highway-section/ |title=No state consent, NHAI goes ahead with four-laning of highway section |publisher=Indian Tollways |date=3 December 2009 |access-date=16 July 2010 |archive-url=https://web.archive.org/web/20091206194741/http://www.indiantollways.com/2009/12/03/no-state-consent-nhai-goes-ahead-with-four-laning-of-highway-section/ |archive-date=6 December 2009 |url-status=dead }}</ref> ||[[Uttar Pradesh]], [[Uttarakhand]]|| align="right" |{{convert|424|km|mi|1|abbr=on}}
| Delhi
| [[Western Peripheral Expressway|Western Peripheral]]
| style="text-align: center;" |
| Kundli, Sonipat – Dholgarh, Palwal
| Haryana
| {{cvt|135.6|km}}
| 6
| [[Haryana State Industrial and Infrastructure Development Corporation|HSIIDC]]
| {{Operational}}
| 19 November 2019<ref>{{cite web |url=https://timesofindia.indiatimes.com/india/pm-modi-to-inaugurate-western-peripheral-expressway-all-you-need-to-know/articleshow/66676579.cms |title=PM Modi to inaugurate Western Peripheral Expressway: All you need to know}}</ref>
|-
|-
| GMADA Expressway
| [[Gurgaon]]
| [[Chandigarh]], [[Haryana]], [[Punjab]]
| [[Dwarka Expressway]]
| align= "right"|{{Convert|284|km|mi|abbr=on}}
| style="text-align: center;" |
| Mahipalpur, Delhi – Kherli Daula, Gurgaon
| Delhi and Haryana
| {{cvt|27.6|km}}
| 8
| NHAI
| {{Operational}}
| 11 March 2024<ref>{{Cite web |title=Dwarka Expressway – Information & Status Update |url=https://themetrorailguy.com/nhai-dwarka-expressway-information-route-status/ |access-date=2025-07-01 |website=The Metro Rail Guy |language=en-US}}</ref>
|-
|-
| Hyderabad–Indore Expressway<ref>{{cite web|url=https://m.timesofindia.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years|work=[[Times of India]]|access-date=13 August 2020}}</ref>  
| [[Hyderabad]]
| [[Madhya Pradesh]] , [[Maharashtra]] , [[Telangana]]
| [[Outer Ring Road, Hyderabad|Outer Ring]]
| align="right" |{{Convert|713|km|mi|abbr=on}}
| style="text-align: center;" |
| [[Gachibowli]] – [[Narsingi, Ranga Reddy district]]
| Telangana
| {{cvt|158|km}}
| 8
| [[Greater Hyderabad Municipal Corporation|GHMC]]
| {{Operational}}
| 15 July 2016<ref>{{cite web|title=ORR: Ghatkesar – Shameerpet stretch opens|url=http://www.business-standard.com/article/pti-stories/two-packages-of-hyderabad-orr-inaugurated-116071500760_1.html|website=TOI|access-date=5 July 2016|language=en-IN|date=15 July 2016}}</ref>
|-
|-
| Hyderabad–Raipur Expressway<ref name="constructionweekonline.in"/>
| [[Kolkata]]
| [[Chhattisgarh]] , [[Telangana]]  
| [[Belghoria Expressway]]
| align="right" |{{Convert|330|km|mi|abbr=on}}
| style="text-align: center;" |[[File:NH12-IN.svg|alt=NH12|center|31x31px]]
| [[Dakshineswar]], Kolkata – [[Netaji Subhas Chandra Bose International Airport|NSCBIA]], Kolkata
| West Bengal
| {{cvt|16|km}}
| 4
| NHAI
| {{Operational}}
| 2008<ref>{{Cite web |url=https://timesofindia.indiatimes.com/city/kolkata/rising-crime-on-belghoria-expressway/articleshow/4908597.cms |title=Rising crime on Belghoria expressway |work=The Times of India |date=19 August 2009 |via=The Economic Times - The Times of India}}</ref>
|-
|-
| Hyderabad–Visakhapatnam Expressway<ref>{{cite web|url=https://m.timesofindia.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years|work=[[Times of India]]|access-date=13 August 2020}}</ref>  
| [[Lucknow]]
| [[Telangana]] , [[Andhra Pradesh]]||align="right"|{{Convert|225|km|mi|abbr=on}}
| [[Lucknow Outer Ring Road (NH 230)|Lucknow Outer Ring]]
| [[File:NH230-IN.svg|24px|center]]
| [[Bakshi Ka Talab]]
| Uttar Pradesh
| {{cvt|104|km}}
| 8
| NHAI
| {{Operational}}
| March 2024<ref>{{cite web | url=https://www.knocksense.com/lucknow/lucknows-pivotal-project-outer-ring-road-all-set-to-be-inaugurated-in-march | title=Lucknow's pivotal project, Outer Ring Road all set to be inaugurated in March | date=28 February 2024 }}</ref>
|-
|-
| Indore–Kota Expressway<ref>{{cite web|url=https://m.timesofindia.com/india/23-expressways-new-highways-coming-up-in-next-5-years/articleshow/77526921.cms|title=23 new expressways and highways coming up in next 5 years|work=[[Times of India]]|access-date=13 August 2020}}</ref>  
| [[Ludhiana]]
| [[Rajasthan]] , [[Madhya Pradesh]]||align="right"|{{Convert|136|km|mi|abbr=on}}
| [[Ludhiana Elevated Corridor]]
| style="text-align: center;" |
| Octroi post – Samrala Roundabout
| Punjab
| {{cvt|13|km}}
| 4
| NHAI
| {{Operational}}
| January 2024<ref>{{Cite web |title=Elevated Road: An unwanted ‘white elephant’ in the making |url=https://www.tribuneindia.com/news/archive/ludhiana/elevated-road-an-unwanted-white-elephant-in-the-making-686510/ |access-date=2025-07-01 |website=The Tribune |language=en}}</ref>
|-
|-
| [[Kadapa Feeder Expressway]]<ref name="auto2">{{cite web |url=http://aprdc.ap.gov.in/CMDASHBOARDREPORTS/GreenFieldExpressReport.aspx|title=Green Field Express Way (Anantapur to Amaravati)}}</ref> ||[[Andhra Pradesh]]|| align="right" |{{convert|104.05|km|mi|1|abbr=on}}
| [[Mumbai]] and [[Thane]]
| [[Mumbai Trans Harbour Link|Mumbai Trans-harbour]]
| style="text-align: center;" |
| [[Sewri]], South Mumbai – [[Chirle]], [[Navi Mumbai]]
| Mumbai MR
| {{cvt|21.8|km}}
| 6
| [[Mumbai Metropolitan Region Development Authority|MMRDA]]
| {{Operational}}
| 12 January 2024<ref>{{cite news |title=Mumbai Trans Harbour Link Inauguration Live Updates: PM Modi inaugurates Atal Setu bridge |url=https://timesofindia.indiatimes.com/city/mumbai/mumbai-trans-harbour-link-inauguration-live-updates-pm-modi-maharashtra-visit-india-longest-bridge-mumbai-news-mthl-atal-setu/liveblog/106744363.cms |work=The Times of India |date=12 January 2024 |access-date=12 January 2024 |language=en}}</ref>
|-
|-
|Konkan Greenfield Expressway
| [[Nashik]]
|[[Maharashtra]]  
| [[Chatrapati Shivaji Maharaj Uddanpul|Nashik Freeway]]
|align="right" |{{Convert|500|km|mi|abbr=on}}
| style="text-align: center;" |
| Pathardi – Adgaon
| Maharashtra
| {{cvt|14|km}}
| 6
| NHAI
| {{Operational}}
| 14 June 2013<ref>{{cite web |url=http://www.ultratechcement.com/project_pimpalgaon.php |title=UltraTech Cement Limited &#124;&#124; Projects &#124;&#124; PimpalGaon-Nashik-Gonde Road Project |publisher=Ultratechcement.com |access-date=2013-07-23 |archive-url=https://web.archive.org/web/20130527011545/http://www.ultratechcement.com/project_pimpalgaon.php |archive-date=27 May 2013 |url-status=dead }}</ref>
|-
|-
| [[Kurnool Feeder Expressway]]<ref name="auto2"/> ||[[Andhra Pradesh]]|| align="right" |{{convert|123.7|km|mi|1|abbr=on}}
| [[Panipat]]
| [[Panipat Elevated Expressway|Panipat Elevated Corridor]]
| style="text-align: center;" |
| Sewah – Sector-18
| Haryana
| {{cvt|10|km}}
| 6
| Panipat Elevated Corridor Limited (PECL)
| {{Operational}}
| 16 July 2008<ref>{{cite web| url=https://www.projectstoday.com/News/Indias-longest-flyover-inaugurated | title=India's longest flyover inaugurated | publisher=Projects Today | date=17 July 2008}}</ref>
|-
|-
| [[Nagpur–Hyderabad–Bengaluru Expressway]]<ref>{{Cite news|url=https://www.thehindubusinessline.com/economy/logistics/feedback-infra-pitches-for-a-big-role-in-designing-greenfield-expressways/article10010165.ece|title=Feedback Infra pitches for a big role in designing greenfield expressways|last=Ramakrishnan|first=N|date=3 January 2018|work=Business Line|access-date=31 May 2018|archive-url=https://archive.today/20180531131809/https://www.thehindubusinessline.com/economy/logistics/feedback-infra-pitches-for-a-big-role-in-designing-greenfield-expressways/article10010165.ece|archive-date=31 May 2018|url-status=live}}</ref>
| [[Prayagraj]]
|[[Maharashtra]], [[Telangana]], [[Andhra pradesh]], [[Karnataka]]
| [[Prayagraj Bypass Expressway|Prayagraj Bypass]]
| align="right" |{{Convert|1100|km|mi|abbr=on}}
| [[File:NH19-IN.svg|24px|center]]
| Kokhraj, Prayagraj – Handia, Prayagraj
| Uttar Pradesh
| {{cvt|84.7|km}}
| 4
| NHAI
| {{Operational}}
| 2009<ref>{{Cite web |title=Allahabad Bypass Expressway, Map of Allahabad Bypass |url=https://www.mapsofindia.com/roads/expressway/allahabad-bypass.html |access-date=2025-07-01 |website=www.mapsofindia.com}}</ref>
|-
|-
|Nagpur–Vijayawada Expressway<ref name="constructionweekonline.in">{{Cite web|title=NHAI chalks out plan to build 22 greenfield expressways by FY25|url=https://www.constructionweekonline.in/projects-tenders/12133-nhai-chalks-out-plan-to-build-22-greenfield-expressways-by-fy25|access-date=4 June 2020|website=Construction Week Online India|language=en}}</ref>
| Prayagraj
|[[Maharashtra]] , [[Telangana]] , [[Andhra Pradesh]] ||align="right"|{{Convert|457|km|mi|abbr=on}}
| Prayagraj Ring Road
| style="text-align: center;" |
| Dandupur – Sahasau
| Uttar Pradesh
| {{cvt|84.7|km}}
| 4
| NHAI
| {{Maybe|Partially opened}}
| 18 June 2026<ref>{{Cite news |date=2023-03-16 |title=1st phase of ring road to be over before Mahakumbh |url=https://timesofindia.indiatimes.com/city/allahabad/1st-phase-of-ring-road-to-be-over-before-mahakumbh/articleshow/98680898.cms |access-date=2025-07-01 |work=The Times of India |issn=0971-8257}}</ref>
|-
|-
| [[Narmada Expressway]]<ref>{{Cite news|url=http://timesofindia.indiatimes.com/city/bhopal/centre-approves-chambal-narmada-expressways-in-mp/articleshow/56901474.cms|title=Centre approves Chambal, Narmada Expressways in MP|work=[[Times of India]]|access-date=8 October 2017}}</ref>
| [[Varanasi]]
|[[Madhya Pradesh]]
| Varanasi Ring Road
| align="right" |{{Convert|1300|km|mi|abbr=on}}
| style="text-align: center;" |
| Rakhuana – Barhuli
| Uttar Pradesh
| {{cvt|63|km}}
| 4
| NHAI
| {{Maybe|Partially opened}}
| 2025<ref>{{Cite news |date=2024-03-07 |title=One lane of Ganga bridge in Kashi set to open by May end |url=https://timesofindia.indiatimes.com/city/varanasi/one-lane-of-ganga-bridge-in-kashi-set-to-open-by-may-end/articleshow/108281314.cms |access-date=2025-07-01 |work=The Times of India |issn=0971-8257}}</ref>
|}
 
=== Under-construction bypass expressways ===
{{sticky header}}{{sort under}}
{{static row numbers}}
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
|+ Overview of under-construction bypass expressways of India
|-
|-
| [[Outer Ring Road, Chennai|ORR Chennai, Phase II]]<ref>{{cite web |url=http://www.gmrgroup.co.in/Highways/Chennai_Outer_Ring_Road.html |title=Highways - Chennai Outer Ring Road |publisher=GMR |access-date=9 January 2016 |url-status=dead |archive-url=https://web.archive.org/web/20100413050804/http://www.gmrgroup.co.in/Highways/Chennai_Outer_Ring_Road.html |archive-date=13 April 2010  }}</ref>||[[Tamil Nadu]]|| align="right" |{{convert|33.1|km|mi|1|abbr=on}}
! Bypassing city
! Expressway
! class="unsortable" | Sign
! Terminals
! Locale
! data-sort-type="number" | Length
! Lanes
! Owner
! Construction began
! Opening
|-
|-
| [[Outer Ring Road, Amaravati]]<ref>{{cite news |url=http://www.thehindu.com/news/cities/Vijayawada/road-projects-land-acquisition-to-be-a-daunting-task-for-ap/article7956270.ece |title=Outer ringroad for Amaravathi|newspaper=[[The Times of India]] |date=8 December 2015 |access-date=8 December 2015}}</ref> ||[[Andhra Pradesh]]|| align="right" |{{convert|220|km|mi|1|abbr=on}}
| [[Kanpur]]
| [[Outer Ring Road, Kanpur|Kanpur Outer Ring]]
| style="text-align: center;" |
| [[Mandhana, Kanpur|Mandhana]]
| Uttar Pradesh
| {{cvt|93|km}}
| 6
| NHAI
| 2024<ref name="kanpur ring">{{Cite web |date=2024-10-25 |title=22 Firms Qualify for Kanpur Ring Road Packages 2A & 2B's Contracts |url=https://themetrorailguy.com/2024/10/25/22-firms-qualify-for-kanpur-ring-road-packages-2a-2bs-contracts/ |access-date=2025-07-01 |website=The Metro Rail Guy |language=en-US}}</ref>
| 2027<ref name="kanpur ring"/>
|-
|-
|[[Outer Ring Road, Patna|Outer Ring Road Patna]]
| [[Pune]]
|[[Bihar]]
| [[Inner Ring Road, Pune|Inner Ring Road]]
|140 km (86.9 mi)
| style="text-align: center;" |
|
| [[Maharashtra]]
| {{cvt|105|km}}
| 6
| [[Pune Metropolitan Region Development Authority|PMRDA]]
| 2025
| 2028
|-
|-
|Patna-Kolkata Expressway
| [[Pune]]
|[[Bihar]], [[Jharkhand]], [[West Bengal]]
| [[Outer Ring Road, Pune|Outer Ring Road]]
|470 km (292 mi)
| style="text-align: center;" |
|
| [[Maharashtra]]
| {{cvt|161.73|km}}
| 8
| [[Maharashtra State Road Development Corporation|MSRDC]]
| 2025
| 2028
|-
|-
|[[Raipur–Bilaspur Expressway]]<ref name="indiamapped.com">{{cite web|url=http://www.indiamapped.com/expressways-in-india/raipur-bilaspur-expressway/|title=Details About Raipur-Bilaspur Expressway|website=www.indiamapped.com}}</ref>
| [[Ambala]] and [[Kurali]]
|[[Chhattisgarh]]
| [[Ambala-Kurali Expressway]]
| align="right" |{{Convert|127|km|mi|abbr=on}}
| style="text-align: center;" |
|
| [[Punjab]]
| {{cvt|61.23|km}}
| 8
| [[National Highways Authority of India]]
| 2024
| 2026
|}
 
=== Proposed bypass expressways ===
{{sticky header}}{{sort under}}
{{static row numbers}}
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
|+ Overview of proposed bypass expressways of India
|-
|-
|Raxaul-Haldia Expressway<ref>{{cite web|title=Bids invited for Raxaul - Haldia Port Expressway's DPR|url=https://themetrorailguy.com/2021/04/22/bids-invited-for-nepal-border-haldia-port-expressways-dpr/|website=www.themetrorailguy.com|access-date=22 April 2021}}</ref>
! Bypassing city
|[[Bihar]], [[Jharkhand]], [[West Bengal]]
! Expressway
|align="right" |{{Convert|650|km|mi|abbr=on}}
! class="unsortable" | Sign
! Terminals
! Locale
! data-sort-type="number" | Length
! Lanes
! Owner
! Proposed in
|-
|-
|Varanasi Link Expressway<ref>{{cite web|url=http://upeida.in/en/page/gorakhpur-expressway|title=UPEIDA}}</ref><ref>{{cite web|url=http://forestsclearance.nic.in/writereaddata/Addinfo/0_0_211912521211106.pdf|title=Development of Purvanchal Expressway}}</ref>
| [[Amaravati]]
|[[Uttar Pradesh]]
| [[Outer Ring Road, Amaravati|Amaravati Outer Ring]]
|align="right" |{{Convert|13|km|mi|abbr=on}}
| style="text-align: center;" |
| [[Guntur district]] – [[Krishna district]]
| Andhra Pradesh
| {{cvt|210|km}}
| 6
| [[NHAI]]
| 2015<ref>{{cite news|last1=Subba Rao|first1=GVR|title=Road projects: land acquisition to be a daunting task for AP|url=http://www.thehindu.com/news/cities/Vijayawada/road-projects-land-acquisition-to-be-a-daunting-task-for-ap/article7956270.ece|access-date=3 March 2016|work=The Hindu|date=7 December 2015|location=Vijayawada}}</ref>
|-
|-
!colspan=2|'''Total'''
| [[Patna]]
!{{convert|10,537.88|km|mi|abbr=on}}
| [[Outer Ring Road, Patna|Patna Outer Ring]]
| style="text-align: center;" |
| [[Vaishali district]] – [[Saran district]]
| Bihar
| {{cvt|140|km}}
| 6
| NHAI
| 2018<ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/patna/centre-approves-ring-road-elevated-highway-projects/articleshow/66394930.cms|title=Centre approves ring road, elevated highway projects &#124; Patna News |website=[[The Times of India]]}}</ref>
|-
|-
| [[Thiruvananthapuram]]
| [[Outer Ring Road, Thiruvananthapuram|Thiruvananthapuram OAGC]]
| NH-886
| [[Vizhinjam]] – [[Navaikulam]]
| Kerala
| {{cvt|80|km}}
| 6
| NHAI
| 2020.<ref>{{Cite web |title=PM Modi to lay stone for Outer Ring Road in Thiruvananthapuram on April 25 - The New Indian Express |url=https://www.newindianexpress.com/cities/thiruvananthapuram/2023/Apr/17/pm-modi-to-lay-stone-for-outer-ring-road-in-thiruvananthapuram-on-april-25-2566582.html |access-date=2023-06-27 |website=www.newindianexpress.com}}</ref>
|}
|}


== Planned/proposed under Bharatmala ==
== Other expressways ==
{| class="wikitable sortable" width=60%
{| class="wikitable sortable static-row-numbers static-row-header-hash sticky-header sort-under" style="font-size:small;"
|+8-lane greenfield expressways under [[Bharatmala]]<ref>{{Cite news|url=https://www.livemint.com/Politics/HkxY3BLp3VIbq2gFhROsOM/Govt-may-launch-7-greenfield-projects-under-Bharatmala.html|title=Govt may launch 7 greenfield projects under Bharatmala|last=Sood|first=Jyotika|date=9 July 2018|work=Mint|access-date=13 July 2018}}</ref><ref>{{Cite news|url=https://www.dailypioneer.com/state-editions/raipur/raipur-vizag-expressway-proj-under-bharatmala-project-centre.html|title=Raipur-Vizag Expressway Proj under Bharatmala Project: Centre|work=The Pioneer|access-date=4 August 2018|language=en}}</ref><ref>{{Cite news|url=https://m.timesofindia.com/india/bharatmala-2-0-to-focus-on-expressways-add-4000-km-greenfield-roads/amp_articleshow/67617128.cms|date= January 2019|work=The Times of India|title=bharatmala-2-0-to-focus-on-expressways-add-4000-km-greenfield-roads |access-date=2 January 2019}}</ref>
|+ Overview of privately managed expressways in India
!Name
!States
!data-sort-type="number" |Length (km/mi)
|-
|-
|Chennai–Salem Expressway||[[Tamil Nadu]]
! Expressway
|{{Convert|277|km|mi|abbr=on}}
! Terminus
! Locale
! data-sort-type="number" | Length
! Lanes
! Type
! Status
! data-sort-type="date" | Opening
|-
|-
|Chennai–Trichy Expressway||[[Tamil Nadu]]
|[[Delhi–Noida Direct Flyway]]
|{{Convert|310|km|mi|abbr=on}}
| [[Delhi]] – [[Noida]], [[Uttar Pradesh]]
|-
|Delhi, Uttar Pradesh
|Delhi–Bilaspur Expressway||[[Himachal Pradesh]]
| {{convert|7.5|km|mi|1|abbr=on}}
|<!-- {{Convert||km|mi|abbr=on}} -->
|8
| Inter-state
| {{Operational}}
|24 January 2001<ref>{{Cite web |date=2001-02-05 |title=DND Flyway steers clear of usual hurdles, connects Delhi to Noida |url=https://www.indiatoday.in/magazine/economy/story/20010205-dnd-flyway-steers-clear-of-usual-hurdles-connects-delhi-to-noida-775820-2001-02-04 |access-date=2026-01-20 |website=India Today |language=en}}</ref>
|}
 
== Expressways operated by state==
The following list consists expressways of India, built and operated by their respective state governments, rather than [[National Highways Authority of India|NHAI]].
{| class="wikitable sortable static-row-numbers static-row-header-hash" style="font-size:small;"
! States
! Expressways
! data-sort-type="number" |Length operational
|-
|-
|Delhi–Hisar Expressway
| [[Transport in Bihar#Expressways|Bihar]]
|[[Haryana]]
| 1
|{{Convert|170|km|mi|abbr=on}}
| {{cvt| {{sum|39.5}} |km}}
|-
|-
|[[Durg-Raipur-Arang Expressway]]||[[Chhattisgarh]]
| [[List of state highways in Chhattisgarh#Expressways|Chhattisgarh]]
|{{Convert|92|km|mi|abbr=on}}
| 1
| {{cvt| {{sum|12.7}} |km}}
|-
|-
|Gurugram–Faridabad Expressway
| [[List of highways in Haryana#Expressways|Haryana]]
|[[Haryana]]
| 1
|{{Convert|135|km|mi|abbr=on}}
| {{cvt| {{sum|35}} |km}}
|-
|-
|Indore-Mumbai Expressway
| [[List of expressways in Maharashtra|Maharashtra]]
|[[Madhya Pradesh]], [[Maharashtra]]
| 7
|{{Convert|515|km|mi|abbr=on}}
| {{cvt| {{sum|701|94.5|21.8|16.8|28|10|16}} |km}}
|-
|-
|Kharagpur–Kolkata Expressway
| [[List of state highways in Punjab#Expressways|Punjab]]
|[[West Bengal]]
| 1
|{{Convert|120|km|mi|abbr=on}}
| {{cvt| {{sum|98}} |km}}
|-
|-
|Kharagpur–Siliguri Expressway
| [[Uttar Pradesh Expressways Industrial Development Authority#Expressways in Uttar Pradesh|Uttar Pradesh]]
|[[West Bengal]]
| 5
|{{Convert|516|km|mi|abbr=on}}
| {{cvt| {{sum|296|296|303.2|165.5|24.5}} |km}}
|-
|-
|Mangaluru–Chitradurga Expressway||[[Karnataka]]
| [[List of expressways in West Bengal|West Bengal]]
|{{Convert|196|km|mi|abbr=on}}
| 1
|-
|{{cvt| {{sum|44.17}} |km}}
|[[Pathankot–Ajmer Expressway]]<ref>{{Cite news|url=https://www.bhaskar.com/rajasthan/jaipur/news/ajmer-jalandhar-greenfield-expressway-5861411.html|title=NHAI ने दी मंजूरी- अजमेर-जालंधर ग्रीनफील्ड के लिए 4 जिलों में होगी भू-अवाप्ति|work=Dainik Bhaskar|access-date=2 September 2018|language=hi}}</ref>
|[[Rajasthan]], [[Haryana]], [[Punjab, India|Punjab]]
|{{Convert|600|km|mi|abbr=on}}
|-
|Pune-Bengaluru Expressway<ref>{{Cite news|url=https://timesofindia.indiatimes.com/india/bharatmala-2-0-to-focus-on-expressways-add-4000-km-greenfield-roads/articleshow/67617128.cms|title=Bharatmala 2.0 |work=TOI|access-date=21 January 2019|language=en}}</ref>
|[[Karnataka]], [[Maharashtra]]
|{{Convert|745|km|mi|abbr=on}}
|-
|Salem–Chengapalli Expressway||[[Tamil Nadu]]
|{{Convert|103|km|mi|abbr=on}}
|-
|Varanasi–Ranchi–Kolkata Expressway||[[Uttar Pradesh]], [[Jharkhand]], [[West Bengal]]
|{{Convert|650|km|mi|abbr=on}}
|-
!colspan=2|Total
!{{Convert|4429|km|mi|abbr=on}}
|}
|}


==See also==
== See also ==
{{Portal|India|Transport|Roads|Railways}}
{{Portal|India|Transport|Roads|Railways}}


; Similar rail development
* [[Future of rail transport in India]], rail development
; Similar roads development
* [[Bharatmala]]
** [[Diamond Quadrilateral]], Subsumed in Bharatmala
** [[Golden Quadrilateral]], completed national road development connectivity older scheme
** [[National Highways Development Project]], Subsumed in Bharatmala
** [[North-South and East-West Corridor]], Subsumed in Bharatmala
* [[India-China Border Roads]], Subsumed in Bharatmala
* [[Setu Bharatam]], river road bridge development in India
; Similar ports and river transport development
* [[Indian Rivers Inter-link]]
* [[List of National Waterways in India]]
* [[Sagar Mala project]], national water port development connectivity scheme
; Similar air transport development
* [[Indian Human Spaceflight Programme]]
* [[UDAN]], national airport development connectivity scheme
; Highways in India
* [[List of National Highways in India by highway number]]
* [[List of National Highways in India]]
; General
* [[Transport in India]]
* [[Transport in India]]
* [[Water transport in India]]
* [[List of national highways in India]]
* [[:Category:Ring roads in India|Ring roads in India]]
* [[India–China Border Roads]]
* [[Setu Bharatam]]
* [[High-speed rail in India]]
* [[Urban rail transit in India]]
* [[Sagar Mala project]]


==References==
== References ==
{{reflist|30em}}
{{reflist|30em}}


==External links==
== External links ==
{{commons}}
* {{commons category-inline}}


{{Highways in India}}
{{Highways in India}}

Latest revision as of 17:10, 7 March 2026


Template:Infobox highway system

The expressways of India are access-controlled toll highways featuring divided carriageways, engineered to support high-speed vehicular movement and to accommodate heavy loads. They constitute the highest class of road infrastructure in the Indian road network.[1] As of December 2024, the total length of expressways in India was 6,059 km (3,765 mi), with 11,127.69 km (6,914.43 mi) under construction.

A central reservation or median separates the traffic moving in opposite directions on expressways. Entry and exits are permitted only through grade separated interchanges. In contrast, National highways may or may not have a median and may lack full access-control.[2] Additionally, some highways constructed by State Governments, which may be fully or partially access-controlled, are designated or named as expressways by the respective State authorities.[3]

Fully opened in April 2002, Mumbai–Pune Expressway was India's first six-lane, access-controlled, inter-city tolled expressway. Spanning 94.5 km (58.7 mi) between Mumbai and Pune, within the state of Maharashtra, it set the benchmark for future expressway development in the country. Since then, expressway construction has significantly accelerated, particularly under the Bharatmala project and other infrastructure programmes both national and regional.[4]

As of 2024, the longest expressway in India is the partially-opened Delhi–Mumbai Expressway (Phase-3), spanning 1,015 km (631 mi), which was inaugurated on 18 December 2024.[5] The widest expressway is the DelhiGurgaon section of the Dwarka Expressway, featuring 16 lanes, which was also opened in 2024.

History[edit | edit source]

Pre-independence[edit | edit source]

Preserved segment of the Grand Trunk Road between Margalla and Kala Chitta in modern-day Pakistan.

While major roads in the Indian subcontinent existed as early as 29th Century BCE in the Indus Valley, the 3,655 km (2,271 mi) long Grand Trunk Road built by the Mauryans during 4th century BCE and later maintained by others, is one of the earliest examples of highest class road infrastructure in India.[6] In 1934, Indian Roads Congress (IRC) was formed to overlook development and research of roads in India and envisioned to achieve a road density of 16 km per 100 km2 of land pre-independence.[7] It was not until in 1995 when National Highways Authority of India (NHAI) was established as an autonomous body to develop, maintain and manage India's road network through National Highways. NHAI would later build and operate various expressways in the country.[8]

Early expressways[edit | edit source]

Mumbai–Pune Expressway, India's first 6-lane expressway

In 1990, Government of Maharashtra appointed RITES to conduct a feasibility study for toll-based expressway between Mumbai and Pune, marking it as the first such initiative to construct an expressway in India. Four years later, RITES submitted its report and the project was estimated to cost 1,146 crore (equivalent to 61 billion or US$850 million in 2019). In March 1997, Maharashtra State Road Development Corporation (MSRDC) undertook the construction of the expressway on a Build–operate–transfer (BOT) model that allowed the state government to collect tolls for 30 years. At the end of the same year, after all environmental and forest clearances, the construction on the 94.5 km (58.7 mi) corridor commenced with first sections opening in 2000. In April 2002, India's first expressway was flagged to be fully operational, with an estimated construction cost of 1,630 crore (equivalent to 50 billion or US$700 million in 2019), which paved the way for more such expressways across the country.[4]

Delhi–Noida Direct (DND Flyway), India's first 8-lane expressway

On 24 January 2001, the eight-lane 7.5 km (4.7 mi) long DND Flyway between Delhi and Noida was operationalised, becoming the first urban expressway in India.[9] Following Mumbai-Pune, Ahmedabad–Vadodara Expressway was then opened between the cities of Ahmedabad and Vadodara in Gujarat on 16 August 2004. While this expressway was operationalised two years later, it was designated as National Expressway 1 (NE-1) back in 1986 by the Government of India.[10]

In 2009, with the advent of new expressway infrastructures coming up across India, the Ministry of Road Transport and Highways (MoRTH) was preparing to set-up National Expressways Authority of India (NEAI) to be in-charge of the construction and maintenance of expressways, however, the Ministry did not proceed with the creation of NEAI for unspecified reasons and NHAI continued to remain in-charge.[11]

Bharatmala pariyojana[edit | edit source]

Indian Air Force (IAF) Dassault Mirage 2000 lands at Yamuna Expressway, in Uttar Pradesh on May 20, 2015

Prior to being subsumed under Bharatmala Pariyojana (lit. 'India garland project'), the government of India had launched National Highways Development Project (NHDP) in 1998 as a seven-step flagship project to construct highest class roads in India and to upgrade the existing ones. The phase-4 of which included the development of 1,000 km (620 mi) of expressways at an indicative cost of 15,000 crore (equivalent to 540 billion or US$7.6 billion in 2019).[12] In 2017, under Bharatmala about 1,900 km (1,200 mi) km of corridors had been identified for development of new expressways, of which 800 km (500 mi) were taken up under phase-1 of the project.[13]

In the 2010s, the states of Maharashtra and Uttar Pradesh took keen interest in investing in expressways through dedicated expressway corporations of MSRDC and UPEIDA respectively.[14] While Maharashtra led by MSRDC completed its second expressway with 701 km (436 mi) long Mumbai–Nagpur Expressway in June 2025, Uttar Pradesh had built four new expressways namely; Bundelkhand, Purvanchal, Agra–Lucknow and Yamuna expressways by the turn of early 2020s.[15] On 21 May 2015, in a first for military aviation and expressway infrastructure in India, the Indian Air Force's Dassault Mirage 2000 successfully landed on the Yamuna Expressway near Mathura in a mock-drill to evaluate the utility of using highways and expressways for emergency landings by military aircraft.[16]

In 2024, the government of India presented an ambitious 'Vision 2047' plan envisioning the construction of up to 50,000 km (31,000 mi) of access-controlled highways and expressways, with Indians gaining access to the expressways at a distance of 100–125 km (62–78 mi) from any point in the country. The ministry of road transport and highways (MoRTH) had also been finalising new guidelines to improve and standardise infrastructure along the already-developed highways with wayside amenities. Satellite-based tolling was also proposed to be started on 10-15 stretches in the same year.[17]

Timeline[edit | edit source]

Total length of Expressways in India every fiscal year (in km)
Year Total length
2024–2025 (Preliminary)
6,059
2023–2024
5,145
2022–2023
3,629
2021–2022
2,501
2020–2021
2,002
2019–2020
1,989
2018–2019
1,762
2017–2018
1,323
2016–2017
1,021
2015–2016
1,021
2014–2015
1,021
2013–2014
1,004
2012–2013
988
2011–2012
580
2010–2011
580
2009–2010
534
2008–2009
438
2007–2008
384
2006–2007
384
2005–2006
343
2004–2005
253
2003–2004
160
2002–2003
160
2001–2002
33

Designation[edit | edit source]

Expressway categories[edit | edit source]

Expressways in India are designated into three main categories:

  • National Expressways (NE): Managed by NHAI under the Ministry of Road Transport and Highways (MoRTH), these are the medium to long-distance expressways which connect the major cities of India. Delhi–Mumbai Expressway, designated as National Expressway-4 (NE-4) is one such example of a National Expressway.
  • Economic Corridors (EC): Also managed by NHAI under MoRTH, these expressways are being built across various Industrial corridors of India. Amritsar–Jamnagar Expressway, designated as Economic Corridor-3 (EC-3) is an example of Industrial expressway.
  • State Expressways (SE): These are the regional expressways undertaken by respective state governments to connect the cities within a state. Mumbai–Nagpur Expressway undertaken by Maharashtra state-government's MSRDC is an example for regional expressway undertaken by the Maharashtra state government.
  • Urban expressways: Additionally some urban governments and municipalities have also constructed expressways within or near urban areas to facilitate decongestion and faster movement within cities. DND Flyway between Delhi and Noida is an example for toll-free urban expressway.
  • Bypass expressways: Bypass expressways are constructed to divert the through-traffic, away from urban areas and city centres. They reduce urban pollution and improve travel speed. Chennai Bypass Road is an example that is built to bypass Chennai.
  • Spur expressways: Spur expressways in India are short corridors that branch off from a main expressway to connect important cities, towns, industrial zones or border areas, thus enhancing the regional connectivity. The 41 km (25 mi) long NakodarAmritsar spur section which branches off from the Delhi–Katra Expressway is an example.

Greenfield and Brownfield expressways[edit | edit source]

Greenfield Expressways in India are new expressways that are built on new alignments to facilitate economy of the areas they pass through. These newly built expressways allow for speeds up to 120 km/h (75 mph) and typically have space reserved between the carriages to allow for a future expansion. Delhi–Mumbai Expressway is an example which is being built with eight-lanes and a reserved space in the median to allow for future expansion of up to twelve lanes.[18] While Brownfield Expressways in India backed by 'Brownfield National Highway Project' (BNHP) are a series of projects undertaken to widen/re-develop existing national highways that have high traffic demand. The upgradation usually involves expansion of lanes from four to six, such as NH-709A.[19]

Design standards[edit | edit source]

Access[edit | edit source]

Fencing behind the milestone on Yamuna Expressway in Uttar Pradesh

Access-control on Indian expressways offers uninterrupted high-speed travel and safety. It is mainly achieved through fencing, Grade separation with over-passes and under-passes, barriers or medians and with additional dedicated service roads for local traffic. Fully access-controlled expressways do not allow access from side roads, villages or properties but only via inter-changes. Partially access-controlled expressways allow access at some at-grade junctions and minor road crossings may exist. Non access-controlled roads are conventional highways that have a mix of local and through traffic without any entry restrictions.

Carriageways[edit | edit source]

All Indian expressways have dual carriageways, one for each direction, separated by a median. Each carriageway typically has at least two lanes, with three to four lanes also being common. Most Greenfield expressways have a reserved space between the carriages for future expansion in number of lanes. Some expressways utilise concrete or metal beam crash barriers for safety. Paved shoulders or emergency lanes also exist beside each carriageway to support during the event of accident. Service lanes on each direction are often provided outside the fenced area for local traffic.

The Indian Roads Congress (IRC) has specified guidelines for designing access-controlled highways with its IRC:SP:99-2013 standard. It specifies a standard lane width of 3.5 m (11 ft) with paved shoulders having a width of 2–2.5 m (6 ft 7 in – 8 ft 2 in) and unpaved shoulders having 1 m (3 ft 3 in) width.[20]

Interchanges[edit | edit source]

Aerial view of Single Point Diamond Interchange (SPDI) interchange on Raipur–Visakhapatnam Expressway

Inter-changes are junctions that connect expressway with other roads, highways or other expressways without interrupting the flow of traffic. They improve safety by eliminating right-angle collisions. Indian expressways have various interchanges designed for suitability. System interchanges—such as cloverleaf, three-way, trumpet connect with other national or state highways. Service interchanges—such as Single Point Diamond Interchange (SPDI) are used for connecting smaller roads.[21]

The design of inter-changes for Indian expressways and highways are governed by IRC:SP:99-2013 and Ministry of Road Transport and Highways (MoRTH) guidelines. While Cloverleaf interchanges require at least 20-30 acres of land, directional flyovers require less. The inter-change designs include acceleration/deceleration lanes for safe merging.[20]

Speed[edit | edit source]

Speed limit of 80 km/h (50 mph) shown on the signage at Mumbai–Pune Expressway

High-speed travel is a key feature on Indian expressways unlike conventional highways where speeds are low due to local traffic and cattle interruptions. The Ministry of Road Transport and Highways (MoRTH) has set speed limits based on road geometry and vehicle type. Some Greenfield expressways are designed for speeds up to 150 km/h (93 mph) but are legally capped at 120 km/h (75 mph) for safety, with some expressways capped as low as 100 km/h (62 mph). For heavy vehicles such as buses and trucks, it is usually capped at 80–100 km (50–62 mi).[22] The minimum designed speed on ramps on inter-changes per IRC is 40–60 km (25–37 mi).[20]

Speed limits on Indian Expressways[23]
Expressway type Max enforced limit Design speed
Greenfield Expressways 120 km/h (75 mph) 150 km/h (93 mph)
Brownfield Expressways 100–120 km/h (62–75 mph) 100–120 km/h (62–75 mph)
Urban Expressways 70–90 km/h (43–56 mph) 80–100 km/h (50–62 mph)

Infrastructure[edit | edit source]

Tolls[edit | edit source]

Talegaon Toll booth on Mumbai–Pune Expressway

Expressways in India excluding some urban ones are tolled. They are implemented to recover cost of construction, maintenance and operations, and are primarily managed by NHAI under MoRTH. The tolls are levied based on vehicle category, type of expressway and distance travelled. They form a great source of revenue for funding the expanding expressway network in India. Only designated interchanges allow entry and exit into the tolls. Rates of tolls are revised every year on April 1, based on the Wholesale price index (WPI) to adjust for inflation.[24][25]

FASTag[edit | edit source]

Chairperson of NHAI Shri Deepak Kumar launching the Mobile Apps named 'My FASTag' and 'FASTag Partner' in New Delhi on 17 August 2017.

FASTag is an Electronic toll collection (ETC) system operated in India by NHAI under MoRTH. It uses Radio-frequency identification (RFID) technology to enable automatic deduction of toll charges at toll plazas on Indian expressways, allowing for vehicles to pass without stopping for toll transactions.[26]

The FASTag system is based on the National Electronic Toll Collection (NTEC) programme developed by the National Payments Corporation of India (NPCI) as a part of India's efforts to digitise highway infrastructure and reduce congestion on toll plazas. It was launched in 2014 as a pilot project on the Ahmedabad–Mumbai section of Golden Quadrilateral highway. From 15 February 2021, fastag became mandatory for all four-wheeled vehicles on national highways.[27]

Wayside amenities[edit | edit source]

Offered by NHAI under MoRTH, Wayside Amenities (WSAs) are dedicated rest and service facilities located along Indian expressways and other national highways to improve road travel comfort, safety, and logistics. They offer rest, food, fuel, charging stations and similar services to both passengers and freight vehicles. The help in reducing driver fatigue, supporting logistics movement and in promoting highway tourism. They are typically located at intervals of 40–50 km (25–31 mi) along expressways. In June 2025, NHAI announced an ambitious plan of establishing over 1000 WSAs over a period of five years under Public–private partnership. The WSAs in the plan include setting up of fuel stations and EV charging points, food courts, dhabas and restaurants, convenience stores, medical and childcare rooms, promotional spaces for local artisans, drone landing facilities and helipads at larger sites.[28]

Financing[edit | edit source]

The financing of Indian expressways is achieved through a combination of public funding, private investment, multilateral lending and via tolls. Ministry of Road Transport and Highways (MoRTH) sets policy and budget allocations while National Highways Authority of India (NHAI) is responsible for implementation and collection of tolls. The private sector entities participate through various Public–private partnership models. A significant amount of funding for expressways comes from central government allocations, especially under Bharatmala Pariyojana. In the 2023-24 Union budget of India, MoRTH was allocated 270,000 crore (US$38 billion), of which a large share was dedicated for expressways and economic corridor developments.[29] In 2024–25, NHAI earned over 41,000 crore (US$5.7 billion) in toll revenue, with projections of 130,000 crore (US$18 billion) by 2030 through FASTag and monetisation of roads.[30]

National expressways[edit | edit source]

Operational national expressways[edit | edit source]

The following list contains operational national expressways built and operated by National Highways Authority of India (NHAI). Page Template:Sticky header/styles.css has no content.Template:Sort under

Under-construction national expressways[edit | edit source]

Page Template:Sticky header/styles.css has no content.Template:Sort under

Proposed national expressways[edit | edit source]

Page Template:Sticky header/styles.css has no content.Template:Sort under

Bypass expressways[edit | edit source]

Operational bypass expressways[edit | edit source]

Page Template:Sticky header/styles.css has no content.Template:Sort under

Under-construction bypass expressways[edit | edit source]

Page Template:Sticky header/styles.css has no content.Template:Sort under

Proposed bypass expressways[edit | edit source]

Page Template:Sticky header/styles.css has no content.Template:Sort under

Other expressways[edit | edit source]

Expressways operated by state[edit | edit source]

The following list consists expressways of India, built and operated by their respective state governments, rather than NHAI.

States Expressways Length operational
Bihar 1 39.5 km (24.5 mi)
Chhattisgarh 1 12.7 km (7.9 mi)
Haryana 1 35 km (22 mi)
Maharashtra 7 888.1 km (551.8 mi)
Punjab 1 98 km (61 mi)
Uttar Pradesh 5 1,085.2 km (674.3 mi)
West Bengal 1 44.17 km (27.45 mi)

See also[edit | edit source]

References[edit | edit source]

  1. "Wayback Machine" (PDF). tis.nhai.gov.in. Archived from the original (PDF) on 8 March 2025. Retrieved 26 June 2025. {{cite web}}: Cite uses generic title (help)
  2. "Wayback Machine" (PDF). www.indiacode.nic.in. Archived from the original (PDF) on 6 November 2023. Retrieved 26 June 2025. {{cite web}}: Cite uses generic title (help)
  3. "Wayback Machine" (PDF). nhai.gov.in. Archived from the original (PDF) on 24 May 2025. Retrieved 26 June 2025. {{cite web}}: Cite uses generic title (help)
  4. 4.0 4.1 Shekhawat, Aditya (22 January 2025). "Mumbai-Pune Expressway: History, Structure, Missing Link And More – My India". Retrieved 26 June 2025.
  5. "80km route of Del-Mum eway opens, to boost connectivity". The Times of India. 18 December 2024.
  6. Tayler, Jeffrey (November 1999). "The Atlantic: "India's Grand Trunk Road"". The Atlantic. Archived from the original on 7 September 2020. Retrieved 7 March 2017.
  7. Jagarlamudi, Vishnu. "History of Road Development in India". Archived from the original on 9 March 2021. Retrieved 5 May 2018 – via Scribd.
  8. "Roadways in India - Road Industry, Network, Projects & FDI". www.investindia.gov.in. Archived from the original on 21 September 2021. Retrieved 7 September 2021.
  9. "'Noida jinx' to keep Akhilesh Yadav away from PM event". The Economic Times. 29 December 2015.
  10. "Wayback Machine" (PDF). egazette.nic.in. Archived from the original (PDF) on 2 February 2023. Retrieved 26 June 2025. {{cite web}}: Cite uses generic title (help)
  11. Dash, Dipak Kumar (23 November 2009). "By 2022, govt to lay 18,637km of expressways". The Times of India. Archived from the original on 26 November 2009. Retrieved 10 January 2020.
  12. "National Highways Development Project Map". National Highways Institute of India.
  13. "Wayback Machine" (PDF). archive.pib.gov.in. Archived from the original (PDF) on 21 January 2023. Retrieved 27 June 2025. {{cite web}}: Cite uses generic title (help)
  14. "Maharashtra, UP to drive state-led capex in road sector in next 3 yrs". The Times of India. 7 May 2019. ISSN 0971-8257. Retrieved 27 June 2025.
  15. "Explained: Politics of Uttar Pradesh expressways". The Indian Express. 23 November 2021. Retrieved 27 June 2025.
  16. "IAF successfully test-lands Mirage on Yamuna e-way". The Times of India. 22 May 2015.
  17. Narayan, Subhash (5 January 2024). "Govt's Vision '47 set to target 50,000km of expressways". mint. Archived from the original on 30 May 2024. Retrieved 27 June 2025.
  18. "Nod to elevated corridor on Greenfield Expressway, budget likely to rise by 48%". The Tribune. Retrieved 27 June 2025.
  19. "Brownfield National Highway Project | CEPT - Portfolio". portfolio.cept.ac.in. Retrieved 27 June 2025.
  20. 20.0 20.1 20.2 Indian Roads Congress (2013). IRC SP 099: Manual of Specification and Standards for Expressways. Public.Resource.Org.
  21. "Wayback Machine" (PDF). law.resource.org. Archived from the original (PDF) on 14 January 2025. Retrieved 26 June 2025. {{cite web}}: Cite uses generic title (help)
  22. "Tyre Speed Rating vs Legal Speed Limit in India". Vredestein Tyres. Retrieved 27 June 2025.
  23. "Tyre Speed Rating vs Legal Speed Limit in India". Vredestein Tyres. Retrieved 28 June 2025.
  24. "Toll taxes across Indian highways set to increase from April 1. Details inside". India Today. 1 April 2025. Retrieved 28 June 2025.
  25. Bhatnagar, Viraaj. "Toll tax on national highways, expressways hiked by up to 5 percent". Autocar India. Retrieved 28 June 2025.
  26. "FAQs on NETC FASTag". Archived from the original on 27 December 2021. Retrieved 27 December 2021.
  27. "FASTags mandatory for all 4 wheelers from today; hybrid lanes to accept cash till February 15 - BusinessToday". Business Today. 1 January 2021. Retrieved 28 June 2025.
  28. "NHAI's Innovative Strategy to Attract Global Expertise for World-Class Highway Amenities". Park+. Retrieved 28 June 2025.
  29. Chandra, Jagriti (1 February 2024). "Budget 2024 | Road sector budget sees a nominal hike of 2.7%". The Hindu. ISSN 0971-751X. Retrieved 28 June 2025.
  30. Sharma, Yogima Seth (4 April 2025). "Toll mopup rises 12.5% in FY25 to an all-time high". The Economic Times. ISSN 0013-0389. Retrieved 28 June 2025.
  31. "Ahmedabad Vadodara Expressway to be ready by March-Source-Business Standard". Archived from the original on 4 October 2012. Retrieved 30 December 2021.
  32. "Amritsar – Jamnagar Economic Corridor – Information & Status". The Metro Rail Guy. Retrieved 29 June 2025.
  33. B.P, Darshan Devaiah (17 March 2025). "Bengaluru-Chennai Expressway to be fully operational by June 2026". The Hindu. ISSN 0971-751X. Retrieved 25 June 2025.
  34. "Prime Minister Narendra Modi inaugurates 118-km Bangalore-Mysore Expressway". The Telegraph. 12 March 2023. Retrieved 13 March 2023.
  35. "Delhi-Dehradun expressway status: Travel from Delhi to Dehradun in 2.5 hours soon - details here". The Times of India. 3 September 2024. ISSN 0971-8257. Retrieved 30 June 2025.
  36. "Delhi Faridabad Expressway". Archived from the original on 1 January 2016.
  37. "Excess cars made tolling a taxing truth at first: Expressway builder". Express India. Archived from the original on 20 November 2008. Retrieved 16 September 2010.
  38. "Delhi-Meerut Expressway open for public, cuts travel time to 45 minutes".
  39. "Delhi-Mumbai Expressway Set To Open For All by 2025". India.com. 2 August 2024. Retrieved 2 August 2024.
  40. Dutta, Alisha (8 July 2023). "Completion of Delhi-Panipat corridor allows commuters to breathe easy". The Hindu. ISSN 0971-751X. Retrieved 30 June 2025.
  41. {{cite web| url=https://www.magicbricks.com/blog/kona-expressway/133175.html | title=Kona Expressway - Route, Speed, & Real-Estate Impact | publisher=magicbricks | date=19 October 2023
  42. PTI (1 August 2022). "Haryana: Six Lane Ambala - Narnaul Expressway Opened For Public, To Ease Traffic In Delhi NCR". Swarajya. Retrieved 1 August 2022.
  43. 43.0 43.1 "Ahmedabad Dholera Expressway: Opening Date & Latest Updates (2025)". Latest Global Construction Industry Projects (2024) - Blackridge Research & Consulting. 24 June 2025. Retrieved 1 July 2025.
  44. "Amas - Darbhanga Expressway - Information & Status". The Metro Rail Guy. Retrieved 1 July 2025.
  45. "Amas Darbhanga Expressway Bihar - Greenfield Expressway NH 119D". Magicbricks Blog. 8 January 2024. Archived from the original on 29 September 2024. Retrieved 1 July 2025.
  46. @rahstaexpo_. "Shamli to Ambala: Connecting Small Cities with Big Dreams!". www.instagram.com. Retrieved 30 June 2025.
  47. "GRAP norms bring NHAI projects to halt". The Tribune. Retrieved 30 June 2025.
  48. "PNC Wins Kanpur Lucknow Expressway's Contract". The Metro Rail Guy. 23 February 2022. Retrieved 25 April 2022.
  49. Shewaramani, Jatin (2 January 2025). "Lucknow News Roundup | Awadh Expressway to be ready by June, temp to drop in next 48 hrs & more". Knocksense. Retrieved 25 June 2025.
  50. "Bangalore–Vijayawada Expressway – Information & Status". The Metro Rail Guy. Retrieved 14 March 2024.
  51. "PM Modi Inaugurates, Lays Foundation Stone For 112 National Highway Projects". 11 March 2024. Retrieved 14 March 2024.
  52. "Full Guide to the Delhi–Jaipur Expressway: Timeline, Route, Real Estate Growth - Times Property". timesproperty. Retrieved 30 June 2025.
  53. "Delhi - Jaipur Super Expressway – Information & Status". The Metro Rail Guy. Retrieved 30 June 2025.
  54. Livemint (16 September 2021). "Delhi-Katra in 6 hours by road. Expressway to be launched in 2 years". livemint.com. Retrieved 16 September 2021.
  55. Barring Punjab, 669 km Delhi-Katra e-way almost complete in most states, The Tribune, 23 Aug 2024.
  56. "Chhattisgarh Infrastructure: Durg set for major infra boost with expressways, metro, and industrial projects". propnewstime.com. Retrieved 1 July 2025.
  57. "Project Details". NHAI. 27 December 2022.
  58. Tamta, Prashant. "Delhi-NCR news: BIG update on long-pending Faridabad-Noida-Ghaziabad expressway, authorities agree to..." DNA India. Retrieved 30 June 2025.
  59. "FNG Expressway: Route, Status And Construction Timeline". www.91infra.com. Retrieved 30 June 2025.
  60. 60.0 60.1 "Ghaziabad-Kanpur Expressway to link 9 UP districts, may be extended to Jewar Airport". Moneycontrol. Archived from the original on 11 May 2025. Retrieved 1 July 2025.
  61. Bharat, E. T. V. (10 January 2025). "Gadkari Carries Out Aerial Inspection Of 33-Km Stretch Of High-Speed Indore-Hyderabad Corridor". ETV Bharat News. Retrieved 30 June 2025.
  62. "Indore-Hyderabad Economic Corridor – Information & Status Update". The Metro Rail Guy. Retrieved 30 June 2025.
  63. "Salient Features – GR Bandikui Jaipur Expressway Private Limited". Retrieved 29 June 2025.
  64. "From July, travel time between Delhi and Jaipur to reduce by an hour". Retrieved 26 June 2025.
  65. "Work begins to build Ludhiana-Bathinda national highway at Rs 1,555 crore". The Tribune. Retrieved 30 June 2025.
  66. 66.0 66.1 "Nagpur-Vijayawada Economic Corridor – Information & Status Update". The Metro Rail Guy. Retrieved 30 June 2025.
  67. 67.0 67.1 "Six-lane highway project in Alwar integrates 23 animal underpasses". The Times of India. 24 February 2025.
  68. "PM Inaugurates, Lays Foundation Stones in Raipur". Drishti IAS. Retrieved 30 June 2025.
  69. "Raipur-Dhanbad expressway and rail upgrades to reshape Coal Capital's future". propnewstime.com. Retrieved 30 June 2025.
  70. 70.0 70.1 "Raipur-Hyderabad Expressway to cut down travel time between the cities by 2025". The Times of India. 17 January 2025. ISSN 0971-8257. Retrieved 1 July 2025.
  71. 71.0 71.1 Mishra, Pawni (13 April 2022). "Raipur Visakhapatnam Expressway: Route, Map, Cost, and Latest Updates". MagicBricks. Retrieved 14 March 2023.
  72. 72.0 72.1 "PM Modi lays foundation stone for Karnataka section of 6-lane Surat-Chennai Expressway". Times Now. 19 January 2023. Retrieved 12 March 2023.
  73. "Delhi Urban Extension Road 2 – Information & Status". The Metro Rail Guy. Retrieved 30 June 2025.
  74. "Delhi's 3rd Ring Road to open by August". Hindustan Times. 7 June 2025.
  75. Yadav, Anshika (23 February 2024). "Varanasi Ranchi Kolkata Expressway 6 Lane E-Way To Reduce Time By 6 Hours". Magicbricks. Retrieved 23 February 2024.
  76. Mishra, Amit (9 December 2022). "NHAI's Ambitious 610-Km Varanasi-Kolkata Expressway To Be Operational By 2027". Swarajya. Retrieved 10 December 2022.
  77. "Bhopal to boast India's best transport system: Multi-state travel within 12 hours". Patrika News. 25 February 2025. Retrieved 1 July 2025.
  78. "Chambal Expressway aka Atal Progressway Complete Project Details". indianconstructioninfo.com. Retrieved 16 March 2023.
  79. "Six-Lane Expressway Connecting Raxaul To Haldia Coming Up By 2028, To Cost Rs 54,000 Crore". News18. Retrieved 1 July 2025.
  80. "Kharagpur-Visakhapatnam Expressway to change Eastern India's road connectivity". The Times of India. ISSN 0971-8257. Retrieved 30 June 2025.
  81. "Shelved Ludhiana-Bathinda highway project back on track". The Tribune. Retrieved 1 July 2025.
  82. "NHAI awards 251-km Hyderabad-Nagpur corridor for Rs 6,661 cr under TOT model". The Economic Times. 20 September 2024. ISSN 0013-0389. Retrieved 1 July 2025.
  83. "Bhopal: Cabinet gives nod to 906-km Narmada Expressway construction". Free Press Journal.
  84. "Rs 6,700 crore boost for road development in Kerala". The New Indian Express. 5 June 2025. Retrieved 1 July 2025.
  85. "Haryana's Ambitious 300km Highway Project: Dabwali to Panipat Expressway". en.theharyanastory.com. 4 February 2025. Retrieved 1 July 2025.
  86. "Pune Bengaluru Expressway - Route, Map, Cost, Progress, and More - Infra Info Hub". 23 May 2025. Retrieved 23 May 2025.
  87. "Ranchi Jamshedpur highway". magicbricks. 22 April 2025.
  88. "No plans to go ahead with greenfield NH projects, says Centre". The Hindu. 12 December 2024. ISSN 0971-751X. Retrieved 1 July 2025.
  89. "Bangalore Satellite Town Ring Road – Information & Status". The Metro Rail Guy. Retrieved 1 July 2025.
  90. "NHAI mulls linking service roads along bypass from Madhavaram to Irumbuliyur". The New Indian Express. 2 October 2024. Retrieved 1 July 2025.
  91. "Gurgaon: Kundli-Manesar expressway inauguration today". Retrieved 5 November 2018.
  92. "PM Modi to inaugurate Western Peripheral Expressway: All you need to know".
  93. "Dwarka Expressway – Information & Status Update". The Metro Rail Guy. Retrieved 1 July 2025.
  94. "ORR: Ghatkesar – Shameerpet stretch opens". TOI. 15 July 2016. Retrieved 5 July 2016.
  95. "Rising crime on Belghoria expressway". The Times of India. 19 August 2009 – via The Economic Times - The Times of India.
  96. "Lucknow's pivotal project, Outer Ring Road all set to be inaugurated in March". 28 February 2024.
  97. "Elevated Road: An unwanted 'white elephant' in the making". The Tribune. Retrieved 1 July 2025.
  98. "Mumbai Trans Harbour Link Inauguration Live Updates: PM Modi inaugurates Atal Setu bridge". The Times of India. 12 January 2024. Retrieved 12 January 2024.
  99. "UltraTech Cement Limited || Projects || PimpalGaon-Nashik-Gonde Road Project". Ultratechcement.com. Archived from the original on 27 May 2013. Retrieved 23 July 2013.
  100. "India's longest flyover inaugurated". Projects Today. 17 July 2008.
  101. "Allahabad Bypass Expressway, Map of Allahabad Bypass". www.mapsofindia.com. Retrieved 1 July 2025.
  102. "1st phase of ring road to be over before Mahakumbh". The Times of India. 16 March 2023. ISSN 0971-8257. Retrieved 1 July 2025.
  103. "One lane of Ganga bridge in Kashi set to open by May end". The Times of India. 7 March 2024. ISSN 0971-8257. Retrieved 1 July 2025.
  104. 104.0 104.1 "22 Firms Qualify for Kanpur Ring Road Packages 2A & 2B's Contracts". The Metro Rail Guy. 25 October 2024. Retrieved 1 July 2025.
  105. Subba Rao, GVR (7 December 2015). "Road projects: land acquisition to be a daunting task for AP". The Hindu. Vijayawada. Retrieved 3 March 2016.
  106. "Centre approves ring road, elevated highway projects | Patna News". The Times of India.
  107. "PM Modi to lay stone for Outer Ring Road in Thiruvananthapuram on April 25 - The New Indian Express". www.newindianexpress.com. Retrieved 27 June 2023.
  108. "DND Flyway steers clear of usual hurdles, connects Delhi to Noida". India Today. 5 February 2001. Retrieved 20 January 2026.

External links[edit | edit source]

Template:Motorways in Asia