Raipur–Visakhapatnam Expressway

From Bharatpedia, an open encyclopedia
Raipur-Visakhapatnam Expressway
Route information
Length464 km (288 mi)
ExistedMarch 2024 (expected)–present
Major junctions
FromKurud, Raipur
ToVishakapatnam Port, Visakhapatnam
Highway system

Raipur–Visakhapatnam Expressway (NH-130CD), part of Raipur–Visakhapatnam Economic Corridor (EC-15), is a planned greenfield, access-controlled, 464-kilometre (288 mi) long, 6-lane expressway through Red corridor in Chhattisgarh, Odisha and Andhra Pradesh states of central and east-central India. From Durg, it runs between NH-30 and NH-130C till Boriguma, then runs east of NH-26 till Sunabeda and then west of NH-26 till Visakhapatnam (Vizianagaram). Along the way it connects Raipur, Kurud, Dhamtari, Kanker, Kondagaon, Koraput, and Sabbavaram before terminating at Visakhapatnam Port.[1]

It is part of Bharatmala Pariyojana and it connects to East Coast Economic Corridor (Kolkata to Kanyakumari) at Vizianagaram. Sequentially interconnected existing NH-30-NH-34-NH-539-NH-44-Yamuna Expressway connect Raipur to central and north India such as Delhi, Agra, Gwalior, Jhansi, Damoh, and Jabalpur.

Route[edit]

Chhattisgarh[edit]

In Chhattisgarh state it passes through 4 southeastern districts between NH-30 and NH-130C:[1]

Odisha[edit]

In Odisha state it passes through 2 southwestern-most districts on eastern and western side of NH-26 in Nabarangpur and Koraput districts respectively:[1]

Andhra Pradesh[edit]

In Andhra Pradesh state is passes only through 1 district in northeast Andhra Pradesh on the western side of NH-26:[1]

Proposed future connectivity[edit]

Following additional connectivity has been proposed by constructing new links.

NCR CMC hubs of Bhatinda-Hisar-Jaipur-Gwalior[edit]

There is another proposal to link this corridor to northwestern India by a combination of constructing greenfield stretches and upgrading existing roads through National Capital Region's Counter Magnet Cities (NCR CMC) of Bhatinda-Hisar-Jaipur (via Karauli)-Gwalior. This requires the construction of a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura.

NCR CMG hubs of Ludhiana-Patiala-Ambala-Narnaul-Alwar-[edit]

There is another proposal to link this corridor to Trans–Haryana Expressway and beyond to Delhi–Amritsar–Katra Expressway, Delhi–Mumbai Expressway and Delhi–Mumbai Industrial Corridor Project by a combination of constructing greenfield stretches and upgrading existing roads through Narnaul-Alwar-Karauli-Mohana-Datia (and/or Gwalior). Detailed routes will see the upgrade of existing State Highways (SH) to National Highways (NH) such as:

  • Rajasthan SH-14 Narnaul-Alwar-Mathura highway, with whole route between narnaul and Mathura to be upgraded for economic corridor and religious Krishna Yatra Circuit.
  • Rajasthan SH-25, Alwar-Rajgarh portion to be upgraded.
  • Dalalpura/Machari to Berkhera-Mahwa, greenfield alignment, alternatively the longer existing Rajasthan SH-35 Rajgarh-Mahwa portion can be upgraded.
  • Rajasthan SH-22, Mahwa-Hindon-Karauli portion to be upgraded.
  • Chambal River, this requires the construction of a greenfield highway and a road-cum-rail bridge over the Chambal River between Karauli-Taintara and/or Sirmathura-Joura with 2 spurs on eastern flank of Chambal - one each to connect to Gwalior and Datia.

Eastern Economic Corridor[edit]

There is a proposal to connect it to Eastern Economic Corridor (Paradeep in Odisha to Raxaul on Bihar-Nepal border) by constructing either a spur or a loop in Chhattisgarh.

Status updates[edit]

  • Feb 2020: The expressway was added to Bharatmala Pariyojana and approved.[2]
  • Aug 2020: The target date for completion of expressway is set as March 2024.[3]
  • Mar 2021: Detailed Project Report (DPR) completed.[4]
  • Apr 2021: Tendering process ongoing.[5]
  • Oct 2021: HG Infra wins 2 packages in Odisha worth over ₹ 2,297 crores for developing the 44 km long, six-lane Kaliagura-Baunsaguar section in Odisha.

See also[edit]

References[edit]

  1. 1.0 1.1 1.2 1.3 Raipur – Visakhapatnam Economic Corridor – Information & Status, themetrorailguy.com.
  2. "ग्रीन फील्ड इकोनॉमिक कॉरीडोर को मिली मंजूरी, रायपुर-विशाखापट्टनम एक्सप्रेस-वे में जगदलपुर नहीं है शामिल". Patrika News.
  3. "23 new expressways and highways coming up in next 5 years | India News - Times of India". The Times of India.
  4. https://www.thehindu.com/news/national/andhra-pradesh/raipur-visakhapatnam-nh-project-will-be-completed-by-2024-25-gadkari/article34075917.ece [bare URL]
  5. "Raipur - Visakhapatnam Economic Corridor – Information & Status". The Metro Rail Guy. Retrieved 2021-10-30.
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We kindly request your support in maintaining the independence of Bharatpedia. As a non-profit organization, we rely heavily on small donations to sustain our operations and provide free access to reliable information to the world. We would greatly appreciate it if you could take a moment to consider donating to our cause, as it would greatly aid us in our mission. Your contribution would demonstrate the importance of reliable and trustworthy knowledge to you and the world. Thank you.

Please select an option below or scan the QR code to donate
₹150 ₹500 ₹1,000 ₹2,000 ₹5,000 ₹10,000 Other