Created by
Last edited July 19, 2023
Talk
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Line-I
Overview
StatusProposed
TerminiTirumangalam
Othakadai
Stations20
Service
TypeRapid transit
SystemMadurai Metro
Technical
Line length31 km (19 mi)
Number of tracks2
Operating speed60 km/h (37 mph)

The Line 1 is one of the three proposed lines of Madurai Metro and the only line which is to be implemented at the Phase 1 of Madurai Metro. The line stretches from Tirumangalam to Othakadai. The line consists of 27 stations.[1]

Stations

The stations proposed in the first phase of Madurai Metro in the Line-1 are;[2]

S.No Station Name Interchange connection Places Connected Layout Opened Depot Connection Depot Layout
English Tamil
1 Tirumangalam திருமங்கலம் Mainline rail interchange Tirumangalam railway station None Elevated Proposed Phase 1 Tirumangalam Depot None
2 Kappalur Toll Plaza கப்பலூர் சுங்கச்சாவடி None None Elevated Proposed Phase 1 None None
3 Dharmathupatty தர்மத்துப்பட்டி None None Elevated Proposed Phase 1 None None
4 Thoppur தோப்பூர் None AIIMS Madurai Elevated Proposed Phase 1 None None
5 Thirunagar திருநகர் None None Elevated Proposed Phase 1 None None
6 Thiruparankundram திருப்பரங்குன்றம் Mainline rail interchange Thiruparankundram railway station Thiruparankundram Murugan Temple Elevated Proposed Phase 1 None None
7 Pasumalai பசுமலை None None Elevated Proposed Phase 1 None None
8 Vasantha Nagar வசந்த நகர் None None Elevated Proposed Phase 1 None None
9 Madura College மதுரா கல்லூரி None None Elevated Proposed Phase 1 None None
10 Madurai Junction மதுரை சந்திப்பு Mainline rail interchange Madurai Junction, Bus interchange Periyar Bus Terminus Meenakshi Amman Temple West Tower Underground Proposed Phase 1 None None
11 Therkuvasal தெற்குவாசல் None Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal Underground Proposed Phase 1 None None
12 Keelavasal கீழவாசல் None Meenakshi Amman Temple East Tower Underground Proposed Phase 1 None None
13 Simmakkal சிம்மக்கல் None Simmakkal Market Underground Proposed Phase 1 None None
14 Goripalayam கோரிப்பாளையம் None Government Rajaji Hospital Elevated Proposed Phase 1 None None
15 City Police Commissioner Office மாவட்ட காவல் கண்காணிப்பாளர் அலுவலகம் None City Police Commissioner Office Elevated Proposed Phase 1 None None
16 K.Pudur புதூர் None None Elevated Proposed Phase 1 None None
17 Mattuthavani மாட்டுத்தாவணி Mainline rail interchange MGR Bus Terminus Mattuthavani Integrated Market Elevated Proposed Phase 1 None None
18 Uthangudi உத்தங்குடி None None Elevated Proposed Phase 1 None None
19 High Court Bench உயர்நீதிமன்ற கிளை None None Elevated Proposed Phase 1 None None
20 Othakkadai ஒத்தக்கடை None None Elevated Proposed Phase 1 None None

References

  1. ↑ "Tender floated to prepare detailed project report for Madurai metro". Retrieved 15 April 2023.
  2. ↑ "Madurai metro to link airport in phase II; 5 km to be underground". Retrieved 7 April 2023.