->AnomieBOT m Dating maintenance tags: {{RJL}} |
slightly enhanced formatting additionally and cleaned formatting |
||
| Line 7: | Line 7: | ||
| type = E | | type = E | ||
| route = | | route = | ||
| image = | | image = | ||
| name = Western Peripheral Expressway | | name = Western Peripheral Expressway | ||
| alternate_name = Kundli–Manesar–Palwal Expressway | | alternate_name = Kundli–Manesar–Palwal Expressway | ||
| Line 13: | Line 13: | ||
| map_custom = yes | | map_custom = yes | ||
| map_notes = Western Peripheral Expressway in red | | map_notes = Western Peripheral Expressway in red | ||
| length_km = 135.6 | | length_km = 135.6 | ||
| length_round = 1 | | length_round = 1 | ||
| Line 21: | Line 20: | ||
| terminus_b = Dholagarh, [[Palwal]] | | terminus_b = Dholagarh, [[Palwal]] | ||
| junction = | | junction = | ||
| formed = | | formed = 19 November 2018 | ||
| maint = [[Haryana State Industrial and Infrastructure Development Corporation]] (HSIIDC) | | maint = [[Haryana State Industrial and Infrastructure Development Corporation]] (HSIIDC) | ||
| history = | | history = | ||
| states = [[Haryana]] | | states = [[Haryana]] | ||
| cities = [[Sonipat]], [[Kharkhoda, Haryana|Kharkhoda]], [[Bahadurgarh]], [[Badli]], [[Jhajjar]], [[Manesar]], [[Nuh (city)|Nuh]], [[Sohna]], [[Hathin]], [[Palwal]]<ref>{{cite news |url= http://www.thehindu.com/news/national/other-states/work-on-kmp-expressway-to-start-soon/article7082853.ece|title=Work on KMP Expressway to start soon|work=The Hindu|date=9 April 2015|access-date=9 January 2016|first=Ashok|last=Kumar}}</ref> | | cities = [[Sonipat]], [[Kharkhoda, Haryana|Kharkhoda]], [[Bahadurgarh]], [[Badli]], [[Jhajjar]], [[Manesar]], [[Nuh (city)|Nuh]], [[Sohna]], [[Hathin]], [[Palwal]]<ref>{{cite news |url= http://www.thehindu.com/news/national/other-states/work-on-kmp-expressway-to-start-soon/article7082853.ece|title=Work on KMP Expressway to start soon|work=The Hindu|date=9 April 2015|access-date=9 January 2016|first=Ashok|last=Kumar}}</ref> | ||
| photo_notes = | | photo_notes = Interchange in KMP Expressway | ||
}} | }} | ||
The '''Western Peripheral Expressway''' (WPE) or '''Kundli–Manesar–Palwal Expressway''' (KMP Expressway), is an operational 6-lane (3 lanes in each direction),<ref name=toie1>[https://timesofindia.indiatimes.com/city/delhi/ring-around-delhi-final-piece-to-fall-in-place-as-western-e-way-opens-today/articleshow/66686208.cms WPE opens in November 2018], Times of India, November 2018.</ref> {{convert|135.6|km|abbr=on}}-long [[Controlled-access highway|Expressway]]<ref>{{cite web|url=https://www.indiatoday.in/india/story/delhi-to-get-new-stretch-of-western-peripheral-expressway-vehicular-pollution-to-go-down-1388744-2018-11-14|title=Delhi to get new stretch of Western Peripheral Expressway, vehicular pollution to go down}}</ref> in the [[Haryana]] | The '''Western Peripheral Expressway''' (WPE) or '''Kundli–Manesar–Palwal Expressway''' (KMP Expressway), is an operational 6-lane (3 lanes in each direction),<ref name=toie1>[https://timesofindia.indiatimes.com/city/delhi/ring-around-delhi-final-piece-to-fall-in-place-as-western-e-way-opens-today/articleshow/66686208.cms WPE opens in November 2018], ''Times of India'', November 2018.</ref> {{convert|135.6|km|abbr=on}}-long [[Controlled-access highway|Expressway]]<ref>{{cite web|url=https://www.indiatoday.in/india/story/delhi-to-get-new-stretch-of-western-peripheral-expressway-vehicular-pollution-to-go-down-1388744-2018-11-14|title=Delhi to get new stretch of Western Peripheral Expressway, vehicular pollution to go down}}</ref> in the [[Haryana]] state of India.<ref>{{cite web|url=http://www.thehindu.com/news/cities/Delhi/3-projects-in-haryana-to-be-completed-soon/article24008708.ece|title=3 projects in Haryana to be completed soon}}</ref><ref>{{cite news|url=http://indianexpress.com/article/cities/delhi/hardlook-narendra-modi-eastern-peripheral-expressway-5193752/|title=First 'Smart' highway holds out hope for a congested, choking capital|work=The Indian Express|date=28 May 2018|first=Sourav Roy|last=Barman|access-date=5 June 2018}}</ref> Along with the [[Eastern Peripheral Expressway]], the Western Peripheral Expressway is expected to divert more than 50,000 heavy vehicles away from Delhi,<ref>{{cite news|url=https://timesofindia.indiatimes.com/city/gurgaon/83km-kmp-stretch-may-not-be-opened-on-haryana-diwas/articleshow/66422115.cms|title=83km Kundli-Manesar-Palwal stretch may not be opened on Haryana Diwas|access-date=5 June 2018}}</ref><ref>{{cite news|url=https://timesofindia.indiatimes.com/city/delhi/western-peripheral-expressway-50000-vehicles-may-go-off-delhi-roads/articleshow/66700406.cms|title=Western Peripheral Expressway: 50,000 vehicles may go off Delhi roads|work=The Times f India|date=19 November 2018|access-date=20 November 2018|first=Sidhartha|last=Roy}}</ref> which will help to maintain good [[air quality in Delhi]].<ref>{{cite web|url=https://www.indiatoday.in/mail-today/story/residents-of-delhi-to-wait-for-another-3-months-to-get-breather-from-heavy-vehicles-subsequent-air-pollution-1286033-2018-07-15|title=Residents of Delhi to wait for another 3 months to get breather from heavy vehicles, subsequent air pollution}}</ref> Western Peripheral Expressway along with Eastern Peripheral Expressway completes the largest Ring Road around Delhi.<ref>{{cite web|url=https://timesofindia.indiatimes.com/india/pm-modi-to-inaugurate-western-peripheral-expressway-all-you-need-to-know/articleshow/66676579.cms|title=PM Modi to inaugurate Western Peripheral Expressway: All you need to know}}</ref><ref>{{cite web|url=https://timesofindia.indiatimes.com/city/delhi/ring-around-delhi-final-piece-to-fall-in-place-as-western-e-way-opens-today/articleshow/66686208.cms|title=Ring around Delhi: Final piece to fall in place as Western Peripheral Expressway opens today}}</ref> There are 10 tolled entries and exits, from north to south - Kundli, Kharkhoda, Bahadurgarh, Badli, Farrukhnagar, Panchgaon, Manesar, Taoru, Sohna & Palwal.<ref name=tollrate1>[http://fincitizen.com/2018/12/19/toll-booths-to-open-at-all-kmp-entries-exits/ Toll booths to open at all KMP entries, exits], December 2018.</ref> Toll rate notified in December 2018 is INR1.35 per km for cars, INR2.18 per km for light motor vehicles, INR4.98 per km for trucks and buses, and two wheelers are not permitted on the expressway.<ref name=tollrate1/> | ||
Two kilometer belt on either side of this expressway has been notified as controlled zone where five new contiguous greenfield cities will be developed as part of Delhi-Sonipat-Rohtak-Gurugram-Faridabad agglomeration. [[Delhi Metro]] Phase-V entails a proposed new metro route along this expressway. | Two kilometer belt on either side of this expressway has been notified as controlled zone where five new contiguous greenfield cities will be developed as part of Delhi-Sonipat-Rohtak-Gurugram-Faridabad agglomeration. [[Delhi Metro]] Phase-V entails a proposed new metro route along this expressway.<ref>{{Cite web |date=2024-06-27 |title=KMP Expressway- Western Peripheral Expressway Route Map, Toll Charges and More - Infra Info Hub |url=https://infrainfohub.com/kmp-expressway-western-peripheral-expressway/ |access-date=2024-07-06 |language=en-US}}</ref> | ||
== History == | == History == | ||
[[File:Nitin Gadkari meeting the Chief Minister of Haryana, Shri Manohar Lal Khattar to discuss the issues of Kundli-Manesar-Palwal, KMP Expressway and various NH and road issues in Haryana, in New Delhi on December 01, 2014.jpg|thumb|Review meeting on the Expressway held by Union Minister and Chief Minister of Haryana]] | [[File:Nitin Gadkari meeting the Chief Minister of Haryana, Shri Manohar Lal Khattar to discuss the issues of Kundli-Manesar-Palwal, KMP Expressway and various NH and road issues in Haryana, in New Delhi on December 01, 2014.jpg|thumb|Review meeting on the Expressway held by Union Minister and Chief Minister of Haryana]] | ||
The 53-km [[Manesar]] to [[Palwal]] section was inaugurated by [[Nitin Gadkari]] in April 2016.<ref>{{cite web|url=https://www.tribuneindia.com/news/haryana/after-9-yr-delay-kmp-eway-to-be-completed-by-august/625454.html|title=After 9-yr delay, KMP eway to be completed by August}}</ref><ref>{{cite web|url=https://www.hindustantimes.com/gurugram/kundli-manesar-stretch-of-western-peripheral-e-way-ready-before-time/story-QU0nOAmMVcnnGTvxI3IuAJ.html|title=Kundli-manesar stretch of western peripheral e-way ready before time}}</ref> The remaining 83-km-long [[Kundli]] to [[Manesar]] section of KMP expressway was inaugurated by Prime Minister [[Narendra Modi]] on 19 November 2018.<ref name=stat1>{{cite news|url=https://indianexpress.com/article/cities/delhi/gurgaon-sultanpur-kundli-manesar-expressway-inauguration-5452647/|title=Gurgaon: Kundli-Manesar expressway inauguration today|access-date=5 November 2018}}</ref> Toll plazas became operational on KMP Expressway in December 2018.<ref>{{cite web|url=https://www.hindustantimes.com/gurugram/7-toll-plazas-begin-operations-on-kmp-e-way-200-marshals-deployed-to-manage-traffic/story-dmybuT3r4pT8DKYuzade3N.html|title=7 toll plazas begin operations on KMP e-way, 200 marshals deployed to manage traffic}}</ref> | The 53-km [[Manesar]] to [[Palwal]] section was inaugurated by [[Nitin Gadkari]] in April 2016.<ref>{{cite web|url=https://www.tribuneindia.com/news/haryana/after-9-yr-delay-kmp-eway-to-be-completed-by-august/625454.html|title=After 9-yr delay, KMP eway to be completed by August|access-date=30 July 2018|archive-date=30 July 2018|archive-url=https://web.archive.org/web/20180730171011/https://www.tribuneindia.com/news/haryana/after-9-yr-delay-kmp-eway-to-be-completed-by-august/625454.html|url-status=dead}}</ref><ref>{{cite web|url=https://www.hindustantimes.com/gurugram/kundli-manesar-stretch-of-western-peripheral-e-way-ready-before-time/story-QU0nOAmMVcnnGTvxI3IuAJ.html|title=Kundli-manesar stretch of western peripheral e-way ready before time}}</ref> The remaining 83-km-long [[Kundli]] to [[Manesar]] section of KMP expressway was inaugurated by Prime Minister [[Narendra Modi]] on 19 November 2018.<ref name=stat1>{{cite news|url=https://indianexpress.com/article/cities/delhi/gurgaon-sultanpur-kundli-manesar-expressway-inauguration-5452647/|title=Gurgaon: Kundli-Manesar expressway inauguration today|access-date=5 November 2018}}</ref> Toll plazas became operational on KMP Expressway in December 2018.<ref>{{cite web|url=https://www.hindustantimes.com/gurugram/7-toll-plazas-begin-operations-on-kmp-e-way-200-marshals-deployed-to-manage-traffic/story-dmybuT3r4pT8DKYuzade3N.html|title=7 toll plazas begin operations on KMP e-way, 200 marshals deployed to manage traffic}}</ref> | ||
In 2003, the Western Peripheral Expressway was first proposed along with the Eastern Peripheral Expressway as a Build Operate Transfer (BOT) project to construct a 135.6 km, access controlled four lane expressway from [[National Highway 1 (India, old numbering)|NH-1]] near Kundli, [[Sonipat]] to [[National Highway 2 (India, old numbering)|NH-2]] near [[Palwal]].<ref>{{cite news|url=http://www.moneycontrol.com/news/business/kmp-expressways-achieves-financial-closurebot-project_260449-0.html|title=KMP Expressways achieves financial closure of BOT project|work=Money Control|date=9 January 2007|access-date=9 January 2016|url-status=dead|archive-date=4 March 2016|archive-url=https://web.archive.org/web/20160304200525/http://www.moneycontrol.com/news/business/kmp-expressways-achieves-financial-closurebot-project_260449-0.html}}</ref> Since Delhi would benefit from rerouting the vehicular away from it, Delhi state agreed to bear half of the land acquisition cost of the expressway.<ref>{{cite news|url=http://www.newindianexpress.com/thesundaystandard/Rough-road-ahead-for-incomplete-Haryana-Delhi-Expressway/2013/07/14/article1682307.ece|title=Rough road ahead|work=The New Indian Express|date=14 July 2013|access-date=9 January 2016|first=Tarun|last=Nangia}}</ref> In 2006, the Haryana government began work on Western Peripheral Expressway project,<ref>{{cite web|url=https://indianexpress.com/article/cities/chandigarh/western-peripheral-expressway-likely-to-open-next-month-5237930/|title=Western Peripheral Expressway likely to open next month}}</ref> when the tender was awarded to KMP Expressways ltd. with commercial operations supposed to begin in June 2009, which was revised to May 2013.<ref>{{cite news|url=http://archive.financialexpress.com/news/lenders-to-ask-developer-to-give-up-highway-project/1102416|title=Lenders ask developer to give up|publisher=The Financial Express|date=5 April 2013|first=Vishwanath|last=Nair|access-date=9 January 2016}}</ref> In 2016, repeated delays forced the [[Government of Haryana]] to terminate the contract and pay KMP Expressways and lenders {{INRConvert|1300|c|lk=on|year=2015}} as termination payment.<ref>{{cite news|url=http://www.hindustantimes.com/haryana/bjp-govt-in-dilemma-over-kmp-e-way-project/article1-1291965.aspx|archive-url=https://web.archive.org/web/20150125162200/http://www.hindustantimes.com/haryana/bjp-govt-in-dilemma-over-kmp-e-way-project/article1-1291965.aspx|url-status=dead|archive-date=25 January 2015|title=BJP govt in dilemma over KMP E-way project |work=Hindustan Times|date=1 December 2014|first=Hitender|last=Rao|access-date=9 January 2016}}</ref><ref>{{cite news|url=http://timesofindia.indiatimes.com/city/delhi/Haryana-asks-Centre-to-take-over-incomplete-expressway/articleshow/45985999.cms|title=Haryana asks Centre to take over incomplete expressway|work=The Times of India|access-date=9 January 2016|date=23 January 2015|first=Dipak K|last=Dash}}</ref> In January 2016, after intervention of the [[Supreme Court of India]], the project was revived and new bids were invited,<ref>{{cite news|url=http://www.thehindu.com/news/national/other-states/kmp-expressway-project-put-on-fast-track/article6926771.ece|title=KMP Expressway put on fast track|work=The Hindu|access-date=9 January 2016|date=24 February 2015|first=Gaurav Vivek|last=Bhatnagar}}</ref> and the plan was upgrade from four lanes to six lanes.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/delhi/Finally-work-on-bypass-e-ways-begins/articleshow/46857383.cms|title=Finally, work on bypass e-ways begins|work=The Times of India|access-date=9 January 2016|date=9 April 2015|first=Deepak K|last=Dash}}</ref> The whole completed expressway became operational in November 2018. | In 2003, the Western Peripheral Expressway was first proposed along with the Eastern Peripheral Expressway as a Build Operate Transfer (BOT) project to construct a 135.6 km, access controlled four lane expressway from [[National Highway 1 (India, old numbering)|NH-1]] near Kundli, [[Sonipat]] to [[National Highway 2 (India, old numbering)|NH-2]] near [[Palwal]].<ref>{{cite news|url=http://www.moneycontrol.com/news/business/kmp-expressways-achieves-financial-closurebot-project_260449-0.html|title=KMP Expressways achieves financial closure of BOT project|work=Money Control|date=9 January 2007|access-date=9 January 2016|url-status=dead|archive-date=4 March 2016|archive-url=https://web.archive.org/web/20160304200525/http://www.moneycontrol.com/news/business/kmp-expressways-achieves-financial-closurebot-project_260449-0.html}}</ref> Since Delhi would benefit from rerouting the vehicular away from it, Delhi state agreed to bear half of the land acquisition cost of the expressway.<ref>{{cite news|url=http://www.newindianexpress.com/thesundaystandard/Rough-road-ahead-for-incomplete-Haryana-Delhi-Expressway/2013/07/14/article1682307.ece|archive-url=https://web.archive.org/web/20130718152436/http://newindianexpress.com/thesundaystandard/Rough-road-ahead-for-incomplete-Haryana-Delhi-Expressway/2013/07/14/article1682307.ece|url-status=dead|archive-date=18 July 2013|title=Rough road ahead|work=The New Indian Express|date=14 July 2013|access-date=9 January 2016|first=Tarun|last=Nangia}}</ref> In 2006, the Haryana government began work on Western Peripheral Expressway project,<ref>{{cite web|url=https://indianexpress.com/article/cities/chandigarh/western-peripheral-expressway-likely-to-open-next-month-5237930/|title=Western Peripheral Expressway likely to open next month}}</ref> when the tender was awarded to KMP Expressways ltd. with commercial operations supposed to begin in June 2009, which was revised to May 2013.<ref>{{cite news|url=http://archive.financialexpress.com/news/lenders-to-ask-developer-to-give-up-highway-project/1102416|title=Lenders ask developer to give up|publisher=The Financial Express|date=5 April 2013|first=Vishwanath|last=Nair|access-date=9 January 2016}}</ref> In 2016, repeated delays forced the [[Government of Haryana]] to terminate the contract and pay KMP Expressways and lenders {{INRConvert|1300|c|lk=on|year=2015}} as termination payment.<ref>{{cite news|url=http://www.hindustantimes.com/haryana/bjp-govt-in-dilemma-over-kmp-e-way-project/article1-1291965.aspx|archive-url=https://web.archive.org/web/20150125162200/http://www.hindustantimes.com/haryana/bjp-govt-in-dilemma-over-kmp-e-way-project/article1-1291965.aspx|url-status=dead|archive-date=25 January 2015|title=BJP govt in dilemma over KMP E-way project |work=Hindustan Times|date=1 December 2014|first=Hitender|last=Rao|access-date=9 January 2016}}</ref><ref>{{cite news|url=http://timesofindia.indiatimes.com/city/delhi/Haryana-asks-Centre-to-take-over-incomplete-expressway/articleshow/45985999.cms|title=Haryana asks Centre to take over incomplete expressway|work=The Times of India|access-date=9 January 2016|date=23 January 2015|first=Dipak K|last=Dash}}</ref> In January 2016, after intervention of the [[Supreme Court of India]], the project was revived and new bids were invited,<ref>{{cite news|url=http://www.thehindu.com/news/national/other-states/kmp-expressway-project-put-on-fast-track/article6926771.ece|title=KMP Expressway put on fast track|work=The Hindu|access-date=9 January 2016|date=24 February 2015|first=Gaurav Vivek|last=Bhatnagar}}</ref> and the plan was upgrade from four lanes to six lanes.<ref>{{cite news|url=http://timesofindia.indiatimes.com/city/delhi/Finally-work-on-bypass-e-ways-begins/articleshow/46857383.cms|title=Finally, work on bypass e-ways begins|work=The Times of India|access-date=9 January 2016|date=9 April 2015|first=Deepak K|last=Dash}}</ref> The whole completed expressway became operational in November 2018. | ||
==Route and Interchanges == | ==Route and Interchanges == | ||
| Line 54: | Line 53: | ||
!Highway | !Highway | ||
!Route | !Route | ||
!Type of | !Type of road interchange | ||
!Corresponding [[Western Peripheral Expressway#Multimodal Transit Centres|Multimodel Passenger Interchange]] | !Corresponding [[Western Peripheral Expressway#Multimodal Transit Centres|Multimodel Passenger Interchange]] | ||
|- | |- | ||
| [[Kundli]] || [[National Highway 44 (India)|NH 44]] || [[Delhi]] | | [[Kundli]] || [[National Highway 44 (India)|NH 44]] || [[Delhi]]–[[Panipat]]–[[Ambala]] [[Grand Trunk Road|GT-Road]] || [[Cloverleaf interchange|Cloverleaf]] || Kundli MMTS | ||
|- | |- | ||
| [[Kharkhoda]] || [[ | | [[Kharkhoda]] || [[List of state highways in Haryana#State highways (SH)|SH 18]] || [[Delhi]]-[[Bawana]]-Kharkhoda-Rohtak || T-Roundabout interchange & flyover || | ||
|- | |- | ||
| [[ | | [[Delhi-Amritsar-Katra Expressway]] || [[Delhi–Amritsar–Katra Expressway|NE 5]]|| [[Delhi]]-[[Bawana|Kharkhoda]]-[[Amritsar]]-[[Katra, Jammu and Kashmir|Katra]]|| Double roundabout interchange & flyover || | ||
|- | |- | ||
| [[ | | [[Bahadurgarh]] || [[National Highway 9 (India)|NH 9]] || [[Delhi]]-[[Rohtak]]–[[Hisar (city)|Hisar]]–[[Sirsa]] || T-Roundabout interchange & flyover || Bahadurgarh MMTS | ||
|- | |- | ||
| [[ | | [[Badli, Jhajjar|Badli]] || [[List of state highways in Haryana#State highways (SH)|SH 123]] || [[Jhajjar]]–[[Badli, Jhajjar|Badli]]-[[Gurugram]]|| T-Roundabout interchange & flyover || | ||
|- | |- | ||
| [[ | | [[Farrukhnagar]] || [[List of state highways in Haryana#State highways (SH)|SH 15A]] || [[Gurugram]]-[[Jhajjar]] || T-Roundabout interchange & flyover || | ||
|- | |- | ||
| [[ | |[[Pataudi]] | ||
|[[National Highway 352W (India)|NH 352W]] | |||
|Gurugram-[[Pataudi]]-[[Rewari]] | |||
|T-Roundabout interchange & flyover | |||
| | |||
|- | |- | ||
| [[ | | [[Pachgaon (Manesar)|Panchgaon]]|| [[National Highway 48 (India)|NH 48]]|| [[Gurugram]]-[[Bhiwadi]]–[[Rewari]]–[[Jaipur]]|| Cloverleaf || Panchgaon Chowk MMTS | ||
|- | |- | ||
| [[ | | [[Taoru]]|| [[National Highway 919 (India)|NH 919]]|| [[Gurugram]]-[[Sohna]]-[[Bhiwadi]]-[[Jaipur]]-[[Rewari]]|| T-Roundabout interchange & flyover || | ||
|- | |- | ||
| [[Palwal]] || [[National Highway 19 (India)| | | [[Sohna]]|| [[National Highway 248A (India)|NH 248A]]|| [[Gurugram]]-[[Nuh (city)|Nuh]]–[[Ferozepur Jhirka]]|| T-Roundabout interchange & flyover || | ||
|- | |||
|Triple Interchange | |||
[[Delhi-Mumbai Expressway]] | |||
[[DND–KMP Expressway|DND-KMP Expressway]] | |||
|[[Delhi–Mumbai Expressway|NE 4]] | |||
[[DND–KMP Expressway|NH 148NA]] | |||
|Delhi-Gurugram-[[Vadodara|Vadodra]]-[[Mumbai]] | |||
Delhi-Gurugram-Sohna-Faridabad-[[Palwal]] | |||
|Triple roundabout interchange & connecting road | |||
| | |||
|- | |||
| [[Palwal]] || [[National Highway 19 (India)|NH 19]] || [[Faridabad]]–[[Hodal]]–[[Mathura]]–[[Agra]]–[[Yamuna Expressway]] || [[Cloverleaf interchange|Cloverleaf]] || Balramgarh MMTS | |||
|} | |} | ||
== Facilities == | == Facilities == | ||
The expressway has [[Filling station|fuel refilling stations]], 2 [[truck stops]], 4 [[bus stand]]s, 1 [[Trauma center|medical trauma centre]] with helipad, [[Traffic police|traffic police stations]] and 5 passenger [[Multimodal transport|multimodel]] [[Transport hub|transit station]]s (MMTS) with refreshment and recreational facilities. | The expressway has [[Filling station|fuel refilling stations]], 2 [[truck stops]], 4 [[bus stand]]s, 1 [[Trauma center|medical trauma centre]] with helipad, [[Traffic police|traffic police stations]] and 5 passenger [[Multimodal transport|multimodel]] [[Transport hub|transit station]]s (MMTS) with refreshment and recreational facilities. | ||
=== Theme Cities === | === Theme Cities === | ||
The [[Government of Haryana]] envisages development of profile land uses as Knowledge City, Medi City, Fashion City, Leisure and Entertainment Cities, Cyber City and Dry-Port facility along with other similar developments, resulting in establishment of five new cities 2 km wide on either side along this express way in public-private partnership (PPP) mode. Haryana govt has notified this plan and implementation started by inviting bids for preparing the Master Plan for the first city as 50,000 hectare '''Manesar Global City''.<ref name=kmpcities1>[ | |||
The [[Government of Haryana]] envisages development of profile land uses as Knowledge City, Medi City, Fashion City, Leisure and Entertainment Cities, Cyber City and Dry-Port facility along with other similar developments, resulting in establishment of five new cities 2 km wide on either side along this express way in public-private partnership (PPP) mode. Haryana govt has notified this plan and implementation started by inviting bids for preparing the Master Plan for the first city as 50,000 hectare '''Manesar Global City''.<ref name=kmpcities1>[https://www.newindianexpress.com/nation/2018/jun/29/five-new-cities-to-be-developed-along-the-kundli-manesar-palwal-expressway-1835666.html Five new cities in Haryana along KMP expressway]</ref> | |||
=== Multimodal Transit Centres === | === Multimodal Transit Centres === | ||
[[Haryana State Industrial and Infrastructure Development Corporation]] is building 5 Multimodal Transit Centres (MMTC) along this expressway at Sonipat, Bahadurgarh, Gurugram and Faridabad in the following places for which the land has been already acquired (c. Dec 2018):<ref name=out1>{{cite news|url=https://www.outlookindia.com/newsscroll/haryana-govt-to-set-up-multi-modal-transit-centres/1227684|title=Haryana govt to set up multi modal transit centres|work=Outlook|date=11 January 2018|access-date=5 June 2018}}</ref> | [[Haryana State Industrial and Infrastructure Development Corporation]] is building 5 Multimodal Transit Centres (MMTC) along this expressway at Sonipat, Bahadurgarh, Gurugram and Faridabad in the following places for which the land has been already acquired (c. Dec 2018):<ref name=out1>{{cite news|url=https://www.outlookindia.com/newsscroll/haryana-govt-to-set-up-multi-modal-transit-centres/1227684|title=Haryana govt to set up multi modal transit centres|work=Outlook|date=11 January 2018|access-date=5 June 2018}}</ref> | ||
From north to south: | From north to south: | ||
* '''Kundli MMTS''': Located at [[Kundli]] (Sonipat): between [[Rajiv Gandhi Education City, Sonipat|Rajiv Gandhi Education City]] and under- | * '''Kundli MMTS''': Located at [[Kundli]] (Sonipat): between [[Rajiv Gandhi Education City, Sonipat|Rajiv Gandhi Education City]] and under-construction [[Delhi–Panipat Regional Rapid Transit System|Delhi–Panipat RRTS station]]. | ||
* '''Bahadurgarh MMTS''': Located at [[Bahadurgarh]] between the bus stand and [[Bahadurgarh City metro station]]. | * '''Bahadurgarh MMTS''': Located at [[Bahadurgarh]] between the bus stand and [[Bahadurgarh City metro station]]. | ||
* '''Panchagaon Chowk MMTS''': Located at [[Pachgaon (Manesar)|Pachgaon Chowk]] in [[Manesar]] between the proposed metro station and under-construction [[Delhi–Alwar Regional Rapid Transit System| | * '''Panchagaon Chowk MMTS''': Located at [[Pachgaon (Manesar)|Pachgaon Chowk]] in [[Manesar]] between the proposed metro station and under-construction [[Delhi–Alwar Regional Rapid Transit System|Delhi–Alwar RRTS station]], [[Delhi Metro#Phase V: Proposed|Gurugram–Manesar Metro]] and [[Railway in Haryana#Future projects|Jhajjar–Palwal rail line]]. | ||
* '''Kherki Daula MMTS''': Located at [[Kherki Daula]] in [[Gurugram]] near the proposed metro station, under- | * '''Kherki Daula MMTS''': Located at [[Kherki Daula]] in [[Gurugram]] near the proposed metro station, under-construction Delhi-Alwar RRTS station and bus stand on the junction of Chhapra and Naihati villages. | ||
* '''Balramgarh MMTS''': Located at [[Ballabhgarh|Balramgarh]] (Ballabhgarh) between [[Raja Nahar Singh metro station]], bus stand and Balramgarh railway station. | * '''Balramgarh MMTS''': Located at [[Ballabhgarh|Balramgarh]] (Ballabhgarh) between [[Raja Nahar Singh metro station]], bus stand and Balramgarh railway station. | ||
==Ring roads, Regional Circular Expressways (RCE) & Zonal Circular Expressways (ZCE)== | |||
{{anchor| Inter }} | |||
''[[Delhi|Delhi NCT]]'' (national capital territory) is the area of Delhi state. ''Core NCR'' (CNCR), which also includes Delhi NCT area, is the area contained within and 5 km outside the circle formed around Delhi by the combination of WPE and EPE. Area outside of CNCR included in the NCR plan is called ''NCR Region''. In addition to 4 ring roads in Delhi CNCR, the ''NCR Regional Plan 2041'' also envisages construction of series of concentric expressways expanding away from and around Delhi which will be interconnected through several national and state highways originating from Delhi, which includes 3 ''Regional circular Expressways'' (RCE) within NCR region and at least 3 ''Zonal circular Expressways'' (ZCE).<ref name=cr1>[https://www.amarujala.com/uttar-pradesh/shamli/circular-expressway-will-pass-through-shamli-shamli-news-mrt557425382 शामली से होकर गुजरेगा सर्कुलर एक्सप्रेस-वे], Amar Ujala, 22 sept 2021.</ref><ref name=cr2>[https://ncrpb.nic.in/drp2041.html Draft NCR Regional plan 2041], NCR planning board accessed, 6 dec 2022.</ref> | |||
{{anchor| Ring }} | |||
* '''Ring roads''' in Delhi NCR. | |||
** '''[[Inner Ring Road, Delhi|Inner Ring Road]]''': 40 km ring from [[Shalimar Bagh, Delhi|Shalimar Bagh]], [[Ashok Vihar]], [[Punjabi Bagh]], [[Rajouri Garden]], [[New Moti Bagh]], [[Hyatt|Hyatt Hotel]], [[All India Institute of Medical Sciences, New Delhi|AIIMS Delhi]], [[Lajpat Nagar]], [[Maharana Pratap Inter State Bus Terminus|Kashmere Gate ISBT]], [[ITO metro station|ITO]] and [[Azadpur]] Mandi. | |||
** '''[[Outer Ring Road, Delhi|Outer Ring Road]]''': | |||
*** '''Salimgarh–Rohini–Okhla Outer Ring Road''': 47 km long 6-lane highway,<ref>{{cite news|last1=Kaushik|first1=Krishn|title=Highways and others: How India classifies roads, reclassifies them|url=http://indianexpress.com/article/explained/highways-and-others-how-india-classifies-roads-reclassifies-them-4602694/|access-date=26 April 2017|work=[[The Indian Express]]|date=7 April 2017}}</ref> ends abruptly at [[Salimgarh Fort]], hence Kalindi Bypass is constructed to close the loop.<ref name=ext11>[https://www.indiatoday.in/mail-today/story/nhai-third-ring-road-decongest-delhi-nitin-gadkari-1044276-2017-09-14 NHAI proposes 'Third Ring Road' in an attempt to decongest Delhi], India Today, 14 sept 2017.</ref> | |||
*** {{anchor| ERR | Kalindi }} '''Kalindi Bypass''' ('''Delhi Eastern Ring Road''': along the western bank of [[Yamuna]] river from Salimgarh Fort to [[DND Flyway]] & [[DND–KMP Expressway|Faridabad Bypass Expressway]], with connection to Badarpur interchange along the way. | |||
** {{anchor| Third }}'''Third Ring Road''': formed by the '''[[Urban Extension Road-II]] (UER II)''': | |||
*** '''[[Urban Extension Road-II#P1|UER-II phase-1]]:''' from Alipur on NH44 in north Delhi to [[National Highway 48 (India)|NH48]] [[IGI Airport]] Shiv Murti. | |||
*** '''[[Urban Extension Road-II#P2|UER-II phase-2]]:''' from NH48 IGI Airport Shiv Murti to [[Badarpur, Delhi|Badarpur]], via Rangpuri Bypass. | |||
*** '''[[Urban Extension Road-II#P3|UER-II phase-3]]:''' from Badarpur to [[Noida-Greater Noida Expressway]] (NGNE), over & along Sahadra Drain, to [[Swaminarayan Akshardham (Delhi)|Akshardham]] and Loni. | |||
** {{anchor| Fourth }}'''Fourth Ring Road''' ('''Delhi Elevated Ring Expressway''') in Core NCR:<ref name=cr1/> This greenfield route will have following subsections, it will be partially elevated and rest at grade. | |||
*** {{anchor | KNDB | KNDBE }}'''Kundli–Narela–Dariyapur–Bahadurgarh Expressway (KNDBE)''': begins in north Delhi at ''NH48 Kundli Drain No 8'', via northwest of ITBP Camp at [[Saboli]]<!--NOTE: please retain a red link to encourage article creation. -->, west of Lampur, between Katlupur & Ghoga, [[Darya Pur Kalan|Dariyapur]], [[Jaunti]], [[Garhi Rindhala]]<!--NOTE: please retain a red link to encourage article creation. -->, build a north bypass around Bahadurgarh, NH9 Bahadurgarh east bypass near UHBVN power station. | |||
*** {{anchor | BMDG | BMDSG BMDSGE | BMDSG }}'''Bahadurgarh–Mitraon–Dharampur–South Gurugaon Expressway (BMDSGE)''': in the west from Bahadurgarh south bypass at Balaur, [[Mitrao]], [[Pandwala Kalan|Pandwala]], bridge over [[Sahibi River]] ([[Najafgarh drain]] [[Najafgarh drain bird sanctuary|bird sanctuary]]) between Jhatikara in Delhi to [[Dharampura, Haryana|Dharampura]]<!--NOTE: please retain a red link to encourage article creation. --> in Gurugaon in Haryana, to [[Dwarka Expressway]] at Daultabad Chowk. | |||
*** {{anchor | GBP | GBPE }}'''Gurgaon–Bandhwari–Pali Expressway (GBPE):''' southwest of Delhi via [[Dwarka Expressway]] (from Daultabad Chowk to Gurgaon sector 88 at Rao Sheoram Chowk), Gurgaon Southern Peripheral Road to Ghata, [[Bandhwari]] (realign existing Ghata-Bandhwari ''Rajesh Piolet Road'' so that it will not pass over the hill), Dera Mandi, tunnel between Jirkhod temple & Pakhal (or between Kholi Dham Temple & Pali). | |||
*** {{anchor | PAF | PAFE }}'''Pali–Ankheer–FNG Expressway (PAFE):''' south of Delhi from Pakhal (or Pali), via [[Badkhal Lake|Badkhal]], to Ankheer Chowk where [[Faridabad–Noida–Ghaziabad Expressway|FNG]] begins. | |||
*** '''[[Faridabad–Noida–Ghaziabad Expressway]] (FNG)''' - Ankheer–Badshahpur–Noida Sector 168–Ghaziabad (Rahul Vihar & Hindan Vihar Sewa Nagar): 56 km long, with 28 km in UP & 28.1 km in Haryana, from Ankheer, to NH19, Faridabad Bypass Expressway, [[Badshahpur]], Dhadhar, Lal Pur bridge over Yamuna to Chak Mangrola, Noida sectors (sec 168 near Chhaproli Khadar, 150, 149, 122, 121) to NE3 [[Delhi–Meerut Expressway]] (near Rahul Vihar), to NH34 near Arya Nagar (in Hindan Vihar of Sewa Nagar in Ghaziabad).<ref>{{cite web|url=http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=CAP/2014/04/12&PageLabel=57&EntityId=Ar05700&ViewMode=HTML|archive-url=https://web.archive.org/web/20140707141108/http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=CAP/2014/04/12&PageLabel=57&EntityId=Ar05700&ViewMode=HTML|url-status=dead|archive-date=7 July 2014|title=Article Window|website=epaper.timesofindia.com}}</ref> | |||
*** {{anchor | GS | GSE }}'''Ghaziabad NPR–Loni–NH709B Expressway''': from Ghaziabad NPR in west to Madhuban Bapudham–Raj Nagar Extension–Bhopura Road in Loni, to NH708B. Proposal has been sent by the Ghaziabad Development Authority (GHA) to NHAI in January 2023.<ref name=navb1>[https://navbharattimes.indiatimes.com/state/uttar-pradesh/ghaziabad/ghaziabad-northern-peripheral-road-will-be-connected-to-dehradun-expressway-gda-has-prepared-plan-know-detail/articleshow/96843012.cms गाजियाबाद से देहरादून जाना हो जाएगा आसान, एक्सप्रेसवे से जुड़ेगा नॉदर्न पेरिफेरल रोड, GDA ने तैयार की योजना.], ''Navbharat Times'', 9 Jan 2023.</ref> | |||
*** {{anchor | GS | GSE }}'''Ghaziabad–Singhola Expressway (GSE):''' from FNG, Raj Nagar Extension Road, NH9 NAI Colony, Farukh Nagar (northeast of [[Hindon Airport]]), to Singhola. | |||
*** {{anchor | NSS | NSSE | Singhola | Subhanpur }}'''Narela–Singhola–Subhanpur Expressway (NSSE):''' from Narela at NH44 Singhola, via Jantipur, to Singhola (Delhi–Saharanpur–Dehradun Expressway & NH709B). | |||
*** '''Spurs''': either express or signalfree. | |||
**** '''Ferozepur Bangar–Nahra–Saboli–Singhu Road''': from between Saboli–Safiabad to NH44 Singhu between Kundli & Narela. | |||
**** '''Kharkhoda–Fereozepur Bangar–Ghoga–South Narela Road''' terminating at Sri Balaji Mandir on Bawana-Narela Road. | |||
**** '''Bawana–Kanoda–Jasore Kheri Road''' to connect with [[Delhi–Amritsar–Katra Expressway]]. | |||
**** '''Kanjhawala–Bahadurgarh Road''': | |||
**** '''Badli–Ghevra Road''': along the way interchanges Kair and also with [[Urban Extension Road-II#Najafgarh|Najafgarh–Bahadurgarh Bypass spur of UER-II]] at south of Neelwal. Connect to Ghevra-Kanjhawala Road at Ghevra. | |||
**** '''Najafgarh–Badli Road''': interchange near Mitraon. | |||
**** '''Badli–Qutub Vihar Road''': | |||
**** '''Badsa–Najafgarh Road''': with bridge over Sahibi river. | |||
**** '''Badli-BSF Camp- Dwarka Phase-II Road''': to meet UER-II on southwest of IGI Airport. | |||
**** '''Bamnoli-Shobha City Road''': to connect Golf Course Road in Dwarka to Dhankot. | |||
**** '''Farukh Nagar–Meoka-Sihi Roard''': for direct connectivity. | |||
**** '''Palra–Bhondsi–Ghata–Chattarpur–Chandani Chowk Road''': interchange with NH248A ([[Sohna Elevated Corridor|Gurugaon–Sohna Elevated Road]]) at Bhondsi near Lemon Tree Hotel. Near Chattarpur it splits into two spurs to UER-II Phase-2 at two places – Mehrauli and Madangir (Shri Lal Bahadur Shashtri Marg to reach signal-free to [[Chandni Chowk]]). With a short spur as tunnel or elevated between Khshboo Chowk–Aya Nagar to Jaunaur to eliminate hill road. | |||
**** '''Pali–[[Prithla]]–Hathin–Uttawar Road''' (Faridabad–Govardhan–Gwalior–Raipur Expressway): will continue as greenfield expressway to Punhana, Nandgaon & Barsana, Govardhan & Deeg, greenfield bridge over Chambal between Bari & Joura then to Gwalior–Orai–Chattarpur–Raipur–Katni. | |||
**** '''Prithla–Mohna Road''': to Jewar Airport. With Shahpura–Maujpur spur, Prithla–Badshahpur along DFC. | |||
**** ''' Ankheer–NHPC-NSEZ''': From Pali-[[Badkhal Lake|Badkhal]]-NHPC-Ninay Nagar to bridge over Yamuna–Basantpur–ATS village–NSEZ to FNG (near Habibpur). | |||
**** '''Pali–Sohna''': From Sohna (Baluda) to [[Delhi–Mumbai Expressway]] (at Paroli–Ghangola). | |||
**** '''Wazirabad–Burari–Manauli–[[Bapauli]] Expressway''': will begin at Shinghali bridge near Sangam Vihar along Bund Road to Burari (with another spur beginning from Wazirabadval9ng Wazirabad Rd & Raj Marg to Bund Road), to WPE interchange at Manauli, to NH709AD Bapauli in Panipat. With following spurs: [[Burari]]–[[Loni, Ghaziabad|Loni]]–Hindon–Bhopura, Burari–Agraula–Farukh Nagar, Ghazibad NAI Colony, UER-III to Bakhtawarpur, Singhola on Narela-Bawana Road to Janti Khurd to Agraula, from NH44 Drain No 8 junction to Khstkar along the drain to WPE interchange at Bahera. | |||
{{anchor| RCE | Regional }} | |||
* '''Regional Circular Expressways (RCE)''' in NCR: These will form the circular expressways around Delhi within NCR region. | |||
** '''Regional Circular Expressway-1 (RCE1): WPE & EPE''': The combination of existing Western Peripheral Expressway and Eastern Peripheral Expressway together form an inner-most regional circular expressway around the Core NCR (CNCR).<ref name=cr1/> | |||
** '''Regional circular Expressway-2 (RCE-2)''' - Panipat–Rewari–Nuh–Jewar–Shamli: <br>This greenfield route will run through [[Panipat]] ([[Samalkha]]–[[Israna]]), [[Shamli]] ([[Chhaprauli]]), [[Meerut]] ([[Barnava]] & [[Gulaothi]]), Jewar [[Noida Airport]] (connect to [[Yamuna Expressway]] at [[Tappal]]), [[Palwal]] (between [[Hathin]]–[[Uttawar]]),<!--Note: retain the red link to encourage article creation.--> Nuh (Tajpur & Meoli), [[Bhiwadi]] (connect planned greenfield Bhiwadi airport at [[Tapukara]]), [[Rewari]] ([[Bawal]] & [[Kosli]]), [[Jhajjar]] (between [[Matanhail]] & [[Chhuchhakwas]], [[Beri, Jhajjar|Beri]]), [[Rohtak]] (Kharawar) and Panipat (between Samalkha-Panipat).<ref name=cr1/> | |||
** '''Regional circular Expressway-3 (RCE-3):''' <br>This greenfield route will run through Karnal ([[Gharaunda]]–[[Pandit Deen Dayal Upadhayaya University of Health Sciences|Kutail]]), [[Muzaffarnagar]], [[Garhmukteshwar]], Narora, [[Aligarh]], [[Mathura]] ([[Vrindavan]], [[Agra Airport]], [[Govardhan]]), [[Deeg]], [[Alwar]] (see [[Narnaul–Alwar Expressway]]), [[Mahendragarh]] (Baberi–Shamda, Gandala, [[Narnaul Airport]], [[Kanina Khas|Kanina]]), Charkhi Dadri (east of [[Badhra]], east of [[Jui Khurd]]), Bhiwani (east of [[Tosham]], [[Bawani Khera]], Garhi), [[Narnaund]] ([[Rakhi Garhi]]), Jind ([[Uchana]]), Kaithal (between [[Rajaund]]–[[Assandh]]) and Karnal (with spur from new bridge on [[Yamuna]] to [[Karnal Airport]]–[[Jyotisar]]).<ref name=cr1/> | |||
{{anchor| ZCE | Zonal }} | |||
* '''Zonal Circular Expressway (ZCE)''' will connect the [[National Capital Region (India)#Counter_Magnets|NCR Counter Magnet Cities]] (NCRCMC) & other important hubs with each other. | |||
** '''Zonal Circular Expressway (ZCE1)''' – [[Hisar (city)|Hisar]]–[[Dausa]]–Agra–[[Roorke]]–[[Kurukshetra]]: Hisar–[[Neem Ka Thana]]–Shahpura–Dausa–Agra–[[Hathras]]–[[Sambhal]]–between [[Moradabad]] & [[Amroha]] to [[Bijnore]]–Roorke–Kurukshetra (Ladwa)–[[Narwana]]–Durjanpur–Kharkari–Hisar ([[Hisar Airport]]). | |||
** '''Zonal Circular Expressway (ZCE2)''' – [[Agroha (town)|Agroha]]–[[Patiala]]–[[Chandigarh]]–[[Haridwar]]–[[Bareilly]]–[[Gwalior]]–[[Jaipur]]-: It will pass through Agroha (Hisar), Dhanaurie–Cheeka–Patiala–Chandigarh–Yanumanagar (Naraingargh & [[Chhachhrauli]])–Chhutmalpur–Haridwar–Bareilly–Firozabad–Pinahat–Morena (with Pinahat–Gwalior–Morena loop)–Sirmathura–Karauli–Lalsot–Jaipur–Neem Ka Thana–Sidhpur–Bhadra–Adampur. | |||
** '''Zonal Circular Expressway (ZCE3)''' – Bareilly–Kota–Dabwali–Baddi–Dehradun–Tikampur: will pass through Kalawali (Sirsa), Budhlada, Samana (Patiala), Adi Badri (Haryana), Kolar, Dehradun, Rishikesh, Lansdown, Nainital, Tikampur, Bisalpur, Bewar (between Mainpuri & Farrukhabad, Sheopur (between Kota–Gwalior). | |||
== See also == | == See also == | ||
* [[List of | |||
* [[ | * [[List of highways in Haryana|Expressways in Haryana]] | ||
* [[ | ** [[Delhi–Amritsar–Katra Expressway]] | ||
* [[ | ** [[Delhi–Mumbai Expressway]] | ||
* [[Eastern Peripheral Expressway]] | ** [[Delhi–Jaipur Expressway]] | ||
* [[Yamuna Expressway]] | |||
* [[Railway in Haryana]] | * [[Uttar Pradesh Expressways Industrial Development Authority#Expressways|Expressways in Uttar Pradesh]] | ||
** [[Eastern Peripheral Expressway]] | |||
** [[Yamuna Expressway]] | |||
* Other | |||
** [[Railway in Haryana]] | |||
** [[List of longest ring roads]] | |||
== References == | == References == | ||
| Line 116: | Line 234: | ||
[[Category:Roads in Delhi]] | [[Category:Roads in Delhi]] | ||
[[Category:Expressways in Haryana]] | [[Category:Expressways in Haryana]] | ||
[[Category:Transport in Gurgaon | [[Category:Transport in Gurgaon]] | ||
[[Category:Transport in Haryana]] | [[Category:Transport in Haryana]] | ||
[[Category:Ring roads in India]] | [[Category:Ring roads in India]] | ||
Latest revision as of 10:54, 27 August 2025
| Western Peripheral Expressway | |
|---|---|
| Kundli–Manesar–Palwal Expressway | |
| Route information | |
| Maintained by Haryana State Industrial and Infrastructure Development Corporation (HSIIDC) | |
| Length | 135.6 km (84.3 mi) |
| Existed | 19 November 2018–present |
| Major junctions | |
| North end | Kundli, Sonipat |
| South end | Dholagarh, Palwal |
| Location | |
| States | Haryana |
| Major cities | Sonipat, Kharkhoda, Bahadurgarh, Badli, Jhajjar, Manesar, Nuh, Sohna, Hathin, Palwal[1] |
| Highway system | |
|
| |
The Western Peripheral Expressway (WPE) or Kundli–Manesar–Palwal Expressway (KMP Expressway), is an operational 6-lane (3 lanes in each direction),[2] 135.6 km (84.3 mi)-long Expressway[3] in the Haryana state of India.[4][5] Along with the Eastern Peripheral Expressway, the Western Peripheral Expressway is expected to divert more than 50,000 heavy vehicles away from Delhi,[6][7] which will help to maintain good air quality in Delhi.[8] Western Peripheral Expressway along with Eastern Peripheral Expressway completes the largest Ring Road around Delhi.[9][10] There are 10 tolled entries and exits, from north to south - Kundli, Kharkhoda, Bahadurgarh, Badli, Farrukhnagar, Panchgaon, Manesar, Taoru, Sohna & Palwal.[11] Toll rate notified in December 2018 is INR1.35 per km for cars, INR2.18 per km for light motor vehicles, INR4.98 per km for trucks and buses, and two wheelers are not permitted on the expressway.[11]
Two kilometer belt on either side of this expressway has been notified as controlled zone where five new contiguous greenfield cities will be developed as part of Delhi-Sonipat-Rohtak-Gurugram-Faridabad agglomeration. Delhi Metro Phase-V entails a proposed new metro route along this expressway.[12]
History[edit | edit source]

The 53-km Manesar to Palwal section was inaugurated by Nitin Gadkari in April 2016.[13][14] The remaining 83-km-long Kundli to Manesar section of KMP expressway was inaugurated by Prime Minister Narendra Modi on 19 November 2018.[15] Toll plazas became operational on KMP Expressway in December 2018.[16]
In 2003, the Western Peripheral Expressway was first proposed along with the Eastern Peripheral Expressway as a Build Operate Transfer (BOT) project to construct a 135.6 km, access controlled four lane expressway from NH-1 near Kundli, Sonipat to NH-2 near Palwal.[17] Since Delhi would benefit from rerouting the vehicular away from it, Delhi state agreed to bear half of the land acquisition cost of the expressway.[18] In 2006, the Haryana government began work on Western Peripheral Expressway project,[19] when the tender was awarded to KMP Expressways ltd. with commercial operations supposed to begin in June 2009, which was revised to May 2013.[20] In 2016, repeated delays forced the Government of Haryana to terminate the contract and pay KMP Expressways and lenders ₹1,300 crore (equivalent to ₹16 billion or US$220 million in 2019) as termination payment.[21][22] In January 2016, after intervention of the Supreme Court of India, the project was revived and new bids were invited,[23] and the plan was upgrade from four lanes to six lanes.[24] The whole completed expressway became operational in November 2018.
Route and Interchanges[edit | edit source]
There are 10 tolled entry and exit points. There are 52 underpasses and 23 overpasses,[25][26][27] including the following:[26]
- 4 railway overbridges,
- 10 overpasses and underpasses at crossings on the national highways and state highways,
- 7 overpasses, 9 underpasses and 27 underpasses at crossings on major district roads and village roads,
- 33 agricultural vehicular underpasses, 31 cattle crossing passages, 61 pedestrian crossing passages.
Template:RJL Interchanges from north to south are:[25]
| Location | Highway | Route | Type of road interchange | Corresponding Multimodel Passenger Interchange |
|---|---|---|---|---|
| Kundli | NH 44 | Delhi–Panipat–Ambala GT-Road | Cloverleaf | Kundli MMTS |
| Kharkhoda | SH 18 | Delhi-Bawana-Kharkhoda-Rohtak | T-Roundabout interchange & flyover | |
| Delhi-Amritsar-Katra Expressway | NE 5 | Delhi-Kharkhoda-Amritsar-Katra | Double roundabout interchange & flyover | |
| Bahadurgarh | NH 9 | Delhi-Rohtak–Hisar–Sirsa | T-Roundabout interchange & flyover | Bahadurgarh MMTS |
| Badli | SH 123 | Jhajjar–Badli-Gurugram | T-Roundabout interchange & flyover | |
| Farrukhnagar | SH 15A | Gurugram-Jhajjar | T-Roundabout interchange & flyover | |
| Pataudi | NH 352W | Gurugram-Pataudi-Rewari | T-Roundabout interchange & flyover | |
| Panchgaon | NH 48 | Gurugram-Bhiwadi–Rewari–Jaipur | Cloverleaf | Panchgaon Chowk MMTS |
| Taoru | NH 919 | Gurugram-Sohna-Bhiwadi-Jaipur-Rewari | T-Roundabout interchange & flyover | |
| Sohna | NH 248A | Gurugram-Nuh–Ferozepur Jhirka | T-Roundabout interchange & flyover | |
| Triple Interchange | NE 4 | Delhi-Gurugram-Vadodra-Mumbai
Delhi-Gurugram-Sohna-Faridabad-Palwal |
Triple roundabout interchange & connecting road | |
| Palwal | NH 19 | Faridabad–Hodal–Mathura–Agra–Yamuna Expressway | Cloverleaf | Balramgarh MMTS |
Facilities[edit | edit source]
The expressway has fuel refilling stations, 2 truck stops, 4 bus stands, 1 medical trauma centre with helipad, traffic police stations and 5 passenger multimodel transit stations (MMTS) with refreshment and recreational facilities.
Theme Cities[edit | edit source]
The Government of Haryana envisages development of profile land uses as Knowledge City, Medi City, Fashion City, Leisure and Entertainment Cities, Cyber City and Dry-Port facility along with other similar developments, resulting in establishment of five new cities 2 km wide on either side along this express way in public-private partnership (PPP) mode. Haryana govt has notified this plan and implementation started by inviting bids for preparing the Master Plan for the first city as 50,000 hectare 'Manesar Global City.[28]
Multimodal Transit Centres[edit | edit source]
Haryana State Industrial and Infrastructure Development Corporation is building 5 Multimodal Transit Centres (MMTC) along this expressway at Sonipat, Bahadurgarh, Gurugram and Faridabad in the following places for which the land has been already acquired (c. Dec 2018):[29]
From north to south:
- Kundli MMTS: Located at Kundli (Sonipat): between Rajiv Gandhi Education City and under-construction Delhi–Panipat RRTS station.
- Bahadurgarh MMTS: Located at Bahadurgarh between the bus stand and Bahadurgarh City metro station.
- Panchagaon Chowk MMTS: Located at Pachgaon Chowk in Manesar between the proposed metro station and under-construction Delhi–Alwar RRTS station, Gurugram–Manesar Metro and Jhajjar–Palwal rail line.
- Kherki Daula MMTS: Located at Kherki Daula in Gurugram near the proposed metro station, under-construction Delhi-Alwar RRTS station and bus stand on the junction of Chhapra and Naihati villages.
- Balramgarh MMTS: Located at Balramgarh (Ballabhgarh) between Raja Nahar Singh metro station, bus stand and Balramgarh railway station.
Ring roads, Regional Circular Expressways (RCE) & Zonal Circular Expressways (ZCE)[edit | edit source]
Delhi NCT (national capital territory) is the area of Delhi state. Core NCR (CNCR), which also includes Delhi NCT area, is the area contained within and 5 km outside the circle formed around Delhi by the combination of WPE and EPE. Area outside of CNCR included in the NCR plan is called NCR Region. In addition to 4 ring roads in Delhi CNCR, the NCR Regional Plan 2041 also envisages construction of series of concentric expressways expanding away from and around Delhi which will be interconnected through several national and state highways originating from Delhi, which includes 3 Regional circular Expressways (RCE) within NCR region and at least 3 Zonal circular Expressways (ZCE).[30][31]
- Ring roads in Delhi NCR.
- Inner Ring Road: 40 km ring from Shalimar Bagh, Ashok Vihar, Punjabi Bagh, Rajouri Garden, New Moti Bagh, Hyatt Hotel, AIIMS Delhi, Lajpat Nagar, Kashmere Gate ISBT, ITO and Azadpur Mandi.
- Outer Ring Road:
- Salimgarh–Rohini–Okhla Outer Ring Road: 47 km long 6-lane highway,[32] ends abruptly at Salimgarh Fort, hence Kalindi Bypass is constructed to close the loop.[33]
- Outer Ring Road:
- Kalindi Bypass (Delhi Eastern Ring Road: along the western bank of Yamuna river from Salimgarh Fort to DND Flyway & Faridabad Bypass Expressway, with connection to Badarpur interchange along the way.
- Third Ring Road: formed by the Urban Extension Road-II (UER II):
- UER-II phase-1: from Alipur on NH44 in north Delhi to NH48 IGI Airport Shiv Murti.
- Third Ring Road: formed by the Urban Extension Road-II (UER II):
- UER-II phase-2: from NH48 IGI Airport Shiv Murti to Badarpur, via Rangpuri Bypass.
- UER-II phase-3: from Badarpur to Noida-Greater Noida Expressway (NGNE), over & along Sahadra Drain, to Akshardham and Loni.
- Fourth Ring Road (Delhi Elevated Ring Expressway) in Core NCR:[30] This greenfield route will have following subsections, it will be partially elevated and rest at grade.
- Kundli–Narela–Dariyapur–Bahadurgarh Expressway (KNDBE): begins in north Delhi at NH48 Kundli Drain No 8, via northwest of ITBP Camp at Saboli, west of Lampur, between Katlupur & Ghoga, Dariyapur, Jaunti, Garhi Rindhala, build a north bypass around Bahadurgarh, NH9 Bahadurgarh east bypass near UHBVN power station.
- Bahadurgarh–Mitraon–Dharampur–South Gurugaon Expressway (BMDSGE): in the west from Bahadurgarh south bypass at Balaur, Mitrao, Pandwala, bridge over Sahibi River (Najafgarh drain bird sanctuary) between Jhatikara in Delhi to Dharampura in Gurugaon in Haryana, to Dwarka Expressway at Daultabad Chowk.
- Gurgaon–Bandhwari–Pali Expressway (GBPE): southwest of Delhi via Dwarka Expressway (from Daultabad Chowk to Gurgaon sector 88 at Rao Sheoram Chowk), Gurgaon Southern Peripheral Road to Ghata, Bandhwari (realign existing Ghata-Bandhwari Rajesh Piolet Road so that it will not pass over the hill), Dera Mandi, tunnel between Jirkhod temple & Pakhal (or between Kholi Dham Temple & Pali).
- Faridabad–Noida–Ghaziabad Expressway (FNG) - Ankheer–Badshahpur–Noida Sector 168–Ghaziabad (Rahul Vihar & Hindan Vihar Sewa Nagar): 56 km long, with 28 km in UP & 28.1 km in Haryana, from Ankheer, to NH19, Faridabad Bypass Expressway, Badshahpur, Dhadhar, Lal Pur bridge over Yamuna to Chak Mangrola, Noida sectors (sec 168 near Chhaproli Khadar, 150, 149, 122, 121) to NE3 Delhi–Meerut Expressway (near Rahul Vihar), to NH34 near Arya Nagar (in Hindan Vihar of Sewa Nagar in Ghaziabad).[34]
- Ghaziabad NPR–Loni–NH709B Expressway: from Ghaziabad NPR in west to Madhuban Bapudham–Raj Nagar Extension–Bhopura Road in Loni, to NH708B. Proposal has been sent by the Ghaziabad Development Authority (GHA) to NHAI in January 2023.[35]
- Ghaziabad–Singhola Expressway (GSE): from FNG, Raj Nagar Extension Road, NH9 NAI Colony, Farukh Nagar (northeast of Hindon Airport), to Singhola.
- Narela–Singhola–Subhanpur Expressway (NSSE): from Narela at NH44 Singhola, via Jantipur, to Singhola (Delhi–Saharanpur–Dehradun Expressway & NH709B).
- Spurs: either express or signalfree.
- Ferozepur Bangar–Nahra–Saboli–Singhu Road: from between Saboli–Safiabad to NH44 Singhu between Kundli & Narela.
- Spurs: either express or signalfree.
- Kharkhoda–Fereozepur Bangar–Ghoga–South Narela Road terminating at Sri Balaji Mandir on Bawana-Narela Road.
- Bawana–Kanoda–Jasore Kheri Road to connect with Delhi–Amritsar–Katra Expressway.
- Kanjhawala–Bahadurgarh Road:
- Badli–Ghevra Road: along the way interchanges Kair and also with Najafgarh–Bahadurgarh Bypass spur of UER-II at south of Neelwal. Connect to Ghevra-Kanjhawala Road at Ghevra.
- Najafgarh–Badli Road: interchange near Mitraon.
- Badli–Qutub Vihar Road:
- Badsa–Najafgarh Road: with bridge over Sahibi river.
- Badli-BSF Camp- Dwarka Phase-II Road: to meet UER-II on southwest of IGI Airport.
- Bamnoli-Shobha City Road: to connect Golf Course Road in Dwarka to Dhankot.
- Farukh Nagar–Meoka-Sihi Roard: for direct connectivity.
- Palra–Bhondsi–Ghata–Chattarpur–Chandani Chowk Road: interchange with NH248A (Gurugaon–Sohna Elevated Road) at Bhondsi near Lemon Tree Hotel. Near Chattarpur it splits into two spurs to UER-II Phase-2 at two places – Mehrauli and Madangir (Shri Lal Bahadur Shashtri Marg to reach signal-free to Chandni Chowk). With a short spur as tunnel or elevated between Khshboo Chowk–Aya Nagar to Jaunaur to eliminate hill road.
- Pali–Prithla–Hathin–Uttawar Road (Faridabad–Govardhan–Gwalior–Raipur Expressway): will continue as greenfield expressway to Punhana, Nandgaon & Barsana, Govardhan & Deeg, greenfield bridge over Chambal between Bari & Joura then to Gwalior–Orai–Chattarpur–Raipur–Katni.
- Prithla–Mohna Road: to Jewar Airport. With Shahpura–Maujpur spur, Prithla–Badshahpur along DFC.
- Ankheer–NHPC-NSEZ: From Pali-Badkhal-NHPC-Ninay Nagar to bridge over Yamuna–Basantpur–ATS village–NSEZ to FNG (near Habibpur).
- Pali–Sohna: From Sohna (Baluda) to Delhi–Mumbai Expressway (at Paroli–Ghangola).
- Wazirabad–Burari–Manauli–Bapauli Expressway: will begin at Shinghali bridge near Sangam Vihar along Bund Road to Burari (with another spur beginning from Wazirabadval9ng Wazirabad Rd & Raj Marg to Bund Road), to WPE interchange at Manauli, to NH709AD Bapauli in Panipat. With following spurs: Burari–Loni–Hindon–Bhopura, Burari–Agraula–Farukh Nagar, Ghazibad NAI Colony, UER-III to Bakhtawarpur, Singhola on Narela-Bawana Road to Janti Khurd to Agraula, from NH44 Drain No 8 junction to Khstkar along the drain to WPE interchange at Bahera.
- Regional Circular Expressways (RCE) in NCR: These will form the circular expressways around Delhi within NCR region.
- Regional Circular Expressway-1 (RCE1): WPE & EPE: The combination of existing Western Peripheral Expressway and Eastern Peripheral Expressway together form an inner-most regional circular expressway around the Core NCR (CNCR).[30]
- Regional circular Expressway-2 (RCE-2) - Panipat–Rewari–Nuh–Jewar–Shamli:
This greenfield route will run through Panipat (Samalkha–Israna), Shamli (Chhaprauli), Meerut (Barnava & Gulaothi), Jewar Noida Airport (connect to Yamuna Expressway at Tappal), Palwal (between Hathin–Uttawar), Nuh (Tajpur & Meoli), Bhiwadi (connect planned greenfield Bhiwadi airport at Tapukara), Rewari (Bawal & Kosli), Jhajjar (between Matanhail & Chhuchhakwas, Beri), Rohtak (Kharawar) and Panipat (between Samalkha-Panipat).[30]
- Regional circular Expressway-2 (RCE-2) - Panipat–Rewari–Nuh–Jewar–Shamli:
- Regional circular Expressway-3 (RCE-3):
This greenfield route will run through Karnal (Gharaunda–Kutail), Muzaffarnagar, Garhmukteshwar, Narora, Aligarh, Mathura (Vrindavan, Agra Airport, Govardhan), Deeg, Alwar (see Narnaul–Alwar Expressway), Mahendragarh (Baberi–Shamda, Gandala, Narnaul Airport, Kanina), Charkhi Dadri (east of Badhra, east of Jui Khurd), Bhiwani (east of Tosham, Bawani Khera, Garhi), Narnaund (Rakhi Garhi), Jind (Uchana), Kaithal (between Rajaund–Assandh) and Karnal (with spur from new bridge on Yamuna to Karnal Airport–Jyotisar).[30]
- Regional circular Expressway-3 (RCE-3):
- Zonal Circular Expressway (ZCE) will connect the NCR Counter Magnet Cities (NCRCMC) & other important hubs with each other.
- Zonal Circular Expressway (ZCE1) – Hisar–Dausa–Agra–Roorke–Kurukshetra: Hisar–Neem Ka Thana–Shahpura–Dausa–Agra–Hathras–Sambhal–between Moradabad & Amroha to Bijnore–Roorke–Kurukshetra (Ladwa)–Narwana–Durjanpur–Kharkari–Hisar (Hisar Airport).
- Zonal Circular Expressway (ZCE2) – Agroha–Patiala–Chandigarh–Haridwar–Bareilly–Gwalior–Jaipur-: It will pass through Agroha (Hisar), Dhanaurie–Cheeka–Patiala–Chandigarh–Yanumanagar (Naraingargh & Chhachhrauli)–Chhutmalpur–Haridwar–Bareilly–Firozabad–Pinahat–Morena (with Pinahat–Gwalior–Morena loop)–Sirmathura–Karauli–Lalsot–Jaipur–Neem Ka Thana–Sidhpur–Bhadra–Adampur.
- Zonal Circular Expressway (ZCE3) – Bareilly–Kota–Dabwali–Baddi–Dehradun–Tikampur: will pass through Kalawali (Sirsa), Budhlada, Samana (Patiala), Adi Badri (Haryana), Kolar, Dehradun, Rishikesh, Lansdown, Nainital, Tikampur, Bisalpur, Bewar (between Mainpuri & Farrukhabad, Sheopur (between Kota–Gwalior).
See also[edit | edit source]
References[edit | edit source]
- ↑ Kumar, Ashok (9 April 2015). "Work on KMP Expressway to start soon". The Hindu. Retrieved 9 January 2016.
- ↑ WPE opens in November 2018, Times of India, November 2018.
- ↑ "Delhi to get new stretch of Western Peripheral Expressway, vehicular pollution to go down".
- ↑ "3 projects in Haryana to be completed soon".
- ↑ Barman, Sourav Roy (28 May 2018). "First 'Smart' highway holds out hope for a congested, choking capital". The Indian Express. Retrieved 5 June 2018.
- ↑ "83km Kundli-Manesar-Palwal stretch may not be opened on Haryana Diwas". Retrieved 5 June 2018.
- ↑ Roy, Sidhartha (19 November 2018). "Western Peripheral Expressway: 50,000 vehicles may go off Delhi roads". The Times f India. Retrieved 20 November 2018.
- ↑ "Residents of Delhi to wait for another 3 months to get breather from heavy vehicles, subsequent air pollution".
- ↑ "PM Modi to inaugurate Western Peripheral Expressway: All you need to know".
- ↑ "Ring around Delhi: Final piece to fall in place as Western Peripheral Expressway opens today".
- ↑ 11.0 11.1 Toll booths to open at all KMP entries, exits, December 2018.
- ↑ "KMP Expressway- Western Peripheral Expressway Route Map, Toll Charges and More - Infra Info Hub". 27 June 2024. Retrieved 6 July 2024.
- ↑ "After 9-yr delay, KMP eway to be completed by August". Archived from the original on 30 July 2018. Retrieved 30 July 2018.
- ↑ "Kundli-manesar stretch of western peripheral e-way ready before time".
- ↑ "Gurgaon: Kundli-Manesar expressway inauguration today". Retrieved 5 November 2018.
- ↑ "7 toll plazas begin operations on KMP e-way, 200 marshals deployed to manage traffic".
- ↑ "KMP Expressways achieves financial closure of BOT project". Money Control. 9 January 2007. Archived from the original on 4 March 2016. Retrieved 9 January 2016.
- ↑ Nangia, Tarun (14 July 2013). "Rough road ahead". The New Indian Express. Archived from the original on 18 July 2013. Retrieved 9 January 2016.
- ↑ "Western Peripheral Expressway likely to open next month".
- ↑ Nair, Vishwanath (5 April 2013). "Lenders ask developer to give up". The Financial Express. Retrieved 9 January 2016.
- ↑ Rao, Hitender (1 December 2014). "BJP govt in dilemma over KMP E-way project". Hindustan Times. Archived from the original on 25 January 2015. Retrieved 9 January 2016.
- ↑ Dash, Dipak K (23 January 2015). "Haryana asks Centre to take over incomplete expressway". The Times of India. Retrieved 9 January 2016.
- ↑ Bhatnagar, Gaurav Vivek (24 February 2015). "KMP Expressway put on fast track". The Hindu. Retrieved 9 January 2016.
- ↑ Dash, Deepak K (9 April 2015). "Finally, work on bypass e-ways begins". The Times of India. Retrieved 9 January 2016.
- ↑ 25.0 25.1 "KMP e-way to partially open in March". The Indian Express. 22 December 2010. Retrieved 22 May 2016.
- ↑ 26.0 26.1 "Chaos, theft, accident: All is not well with Delhi's 'smart' eastern expressway".
- ↑ "KMP to miss August deadline too, could take 3 more months".
- ↑ Five new cities in Haryana along KMP expressway
- ↑ "Haryana govt to set up multi modal transit centres". Outlook. 11 January 2018. Retrieved 5 June 2018.
- ↑ 30.0 30.1 30.2 30.3 30.4 शामली से होकर गुजरेगा सर्कुलर एक्सप्रेस-वे, Amar Ujala, 22 sept 2021.
- ↑ Draft NCR Regional plan 2041, NCR planning board accessed, 6 dec 2022.
- ↑ Kaushik, Krishn (7 April 2017). "Highways and others: How India classifies roads, reclassifies them". The Indian Express. Retrieved 26 April 2017.
- ↑ NHAI proposes 'Third Ring Road' in an attempt to decongest Delhi, India Today, 14 sept 2017.
- ↑ "Article Window". epaper.timesofindia.com. Archived from the original on 7 July 2014.