Created by TaylaA461435
Last edited February 19, 2026


Udhna–Danapur Superfast Express
Overview
Service typeSuperfast Express
First service22 August 2015; 10 years ago (2015-08-22)
Current operator(s)Western Railway
Route
StartUdhna Junction (UDN)
Stops16
EndDanapur (DNR)
Distance travelled1,593 km (990 mi)
Average journey time27 hrs 15 mins
Service frequencyBi-weekly [lower-alpha 1]
Train number(s)20933 / 20934
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper class, General Unreserved
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesOn-board catering,
E-catering
Observation facilitiesLarge windows
Baggage facilitiesAvailable
Other facilitiesBelow the seats
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed58 km/h (36 mph) average including halts.
Rake sharingRake sharing with 12911/12912 Valsad–Haridwar Superfast Express

The 20933 / 20934 Udhna–Danapur Superfast Express is an Superfast Express train belonging to Western Railway zone that runs between Udhna Junction and Danapur in India. It is currently being operated with 20933/20934 train numbers on a bi-weekly basis.[1][2]

Service[edit | edit source]

  • The 19063/Udhna–Danapur Express has an average speed of 54 km/h and covers 1593 km in 29h 15m.
  • The 19064/Danapur–Udhna Express has an average speed of 53 km/h and covers 1593 km in 30h 05m.

Route & halts[edit | edit source]

The important halts of the train are:

Coach composition[edit | edit source]

The train has standard ICF rakes with a maximum speed of 110 kmph. The train consists of 21 coaches:

  • 1 AC II Tier
  • 2 AC III Tier
  • 8 Sleeper coaches
  • 8 General Unreserved
  • 2 Seating cum Luggage Rake

Traction[edit | edit source]

The route is now fully electrified. Both trains are hauled by a Vadodara Loco Shed-based WAP-7 electric locomotive from Udhna Junction to Danapur and vice versa.

Direction reversal[edit | edit source]

Train reverses its direction 1 times:

Rake sharing[edit | edit source]

The train shares its rake with;

See also[edit | edit source]

Notes[edit | edit source]

  1. Runs two days in a week for every direction.

References[edit | edit source]

  1. "Due to non-interlocking work at the Rajatlab station of the North Eastern Railway Zone the changes and regulation of the following trains". North Central Railway. 23 May 2017. Archived from the original on 6 October 2018. Retrieved 5 October 2018.
  2. "Western Railway to attach extra coaches in 13 pairs of trains on temporary basis". Western Railway. 11 July 2017. Retrieved 5 October 2018.

External links[edit | edit source]