Mumbai Metro

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Mumbai Metro
Maha Mumbai Metro.png
Mumbai metro fleet.jpg
Overview
Native nameमुंबई मेट्रो
OwnerMMRDA (all lines except Lines 3),
Mumbai Metro Rail Corporation (Line 3)
Area servedMumbai Metropolitan Region
LocaleMumbai Metropolitan Region
Transit typeRapid Transit
Number of linesOperational 3 | Under-construction 8 | Approved 5 | Proposed 1 |
Line number
Number of stations31
Daily ridership4,50,000 (daily average, Jan 2019)
Annual ridership12.6 crore (126 million)[1]
Chief executiveDevendra Kumar Sharma
HeadquartersMumbai
Website
Operation
Began operation8 June 2014 (9 years ago) (8 June 2014)
Operator(s)Maha Mumbai Metro Operation Corporation Limited (MMMOCL)
Character100% Elevated
Train length
  • 4 (Line 1)
  • 6 (Lines 7, 2A)
Headway
  • 4 minutes (peak hours)
  • 8 minutes (off-peak hours)
Technical
System length30.65 km (19.05 mi) (Operational) , 150.250 km (93.361 mi) (Under Construction) , 151.75 km (94.29 mi) (Proposed)
Track gauge1,435 mm (4 ft 8+12 in) (Standard gauge)
Electrification25 kV, 50 Hz AC through overhead catenary[2]
Average speed33 km/h (21 mph)[3]
Top speed80 km/h (50 mph)[3]

The Mumbai Metro (Marathi: मुंबई मेट्रो) is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India. The system is designed to reduce traffic congestion in the city, and supplement the overcrowded Mumbai Suburban Railway network. It is being built in three phases over a 15-year period, with overall completion expected in October 2026. When completed, the core system will comprise fourteen high-capacity metro railway lines and one metrolite line, spanning a total of 356.972 kilometres (221.812 mi) (24% underground, the rest elevated, with a minuscule portion built at-grade), and serviced by 286 stations.

As of August 2018, Mumbai Metro consisted of one operational line (Line 1 - elevated metro from Versova to Ghatkopar), and four lines under various stages of construction.[4][5]

Line 1 of the Mumbai Metro Line 1 is operated by Mumbai Metro One Private Limited (MMOPL), a joint venture between Reliance Infrastructure (69%), Mumbai Metropolitan Region Development Authority, (26%) and RATP Dev Transdev Asia, France (5%).[6] While lines 2, 4, 6, 7 (under construction), 5 and their extensions (bidding in progress) will be built by the Mumbai Metropolitan Region Development Authority (MMRDA), the completely underground line 3 (also under construction) will be built by Mumbai Metro Railway Corporation Limited (MMRCL). The total financial outlay for the expansion of the metro system beyond the currently operational Line 1 is 82,172 crore (equivalent to 930 billion or US$13.00 billion in 2019), to be funded through a mix of equity and bilateral, multilateral as well as syndicated debt.[7] In another boost to connectivity, the Mumbai Metropolitan Region Development Authority (MMRDA) has decided to connect Mumbai and Virar with a Metro line.

In June 2006, Prime Minister Manmohan Singh laid the foundation stone for the first phase of the Mumbai Metro project, although construction work began in February 2008.[8][9][10] A successful trial run was conducted in May 2013,[11][12][13] and the system's first line entered into operation on 8 June 2014. Many metro projects were being delayed because of late environmental clearances, land acquisition troubles and protests.

The financial capital of India received its first Metro in June 2014, and nearly after 8 years, Mumbai welcomed its two new metro corridors 2A and 7, which is now partially operational. Chief Minister Uddhav Thackeray flagged off the new metro lines 2A and 7 on 2nd April 2022. The line was opened for commercial operation on the same day of the inauguration in the evening from 8 PM onwards. The minimum fare is ₹10 for 3km, and the maximum fare is ₹50 for 30km. As a part of the Phase 1 plan, both metro corridors cover a 20 km route (Dahanukarwadi–Dahisar–Aarey). The Metro runs between Dahanukarwadi on Metro Line 2A and Aarey on Line 7. [14][15]

History[edit]

Mumbai is the capital of Maharashtra. It is among the largest cities in the world, with a total metropolitan area population of over 2 crore (20 million) as of 2011,[16] and a population growth rate of around 2% per annum.[17] Mumbai has the advantage of a high modal share of the public (88%) in favour of a public mass transport system.[citation needed] The existing Mumbai Suburban Railway carries over 70 lakh (7 million) passengers per day,[18] and is supplemented by the Brihanmumbai Electric Supply and Transport (BEST) bus system, which provides feeder services to station-going passengers to allow them to complete their journeys. Until 1980s, transport in Mumbai was not a big problem. The discontinuation of trams resulted in a direct increase of passenger pressure on the suburban railway network. By 2010 the population of Mumbai doubled. However, due to the city's geographical constraints and rapid population growth, road and rail infrastructure development has not been able to keep pace with growing demand over the last 4-5 decades.[19] Moreover, the Mumbai Suburban Railway, though extensive, is not built to rapid transit specifications. The main objective of the Mumbai Metro is to provide mass rapid transit services to people within an approach distance of between 1 and 2 kilometres, and to serve the areas not connected by the existing Suburban Rail network.

Original Mumbai Metro master plan[19]
Phase Line Name of the corridor Length (km)
Phase I
(2006–2011)
1 Versova - Andheri – Ghatkopar 11.07
2 Bandra - Kurla – Mankhurd 13.37
3 Colaba - Bandra – Seepz 38.24
Phase II
(2011–2016)
4 Charkop - Dahisar 7.5
5 Ghatkopar – Mulund 12.4
Phase III
(2016–2021)
6 BKC - Kanjurmarg via Airport 19.5
7 Bandra (E) - Dahisar (E) 16.5
8 Hutatma Chowk – Ghatkopar 21.8
9 Sewri – Prabhadevi 3.5

The master plan unveiled by the MMRDA in 2004 encompassed a total of 146.5 kilometres (91.0 mi) of track, of which 32 kilometres (20 mi) would be underground.[20] The Mumbai Metro was proposed to be built in three phases, at an estimated cost of 19,525 crore.[19] In September 2009, the proposed Hutatma ChowkGhatkopar was reduced to a line between Hutatma Chowk and Carnac Bunder.

In 2011, the MMRDA unveiled plans for an extended Colaba-Bandra-SEEPZ metro line. According to its earlier plans, a 20-km Colaba-to-Bandra metro line was to be constructed, running underground for 10 kilometres (6.2 mi) from Colaba to Mahalaxmi, and then on an elevated track from Mahalaxmi to Bandra. However, the MMRDA decided to increase ridership on the line by running it out past Bandra to Chhatrapati Shivaji Maharaj International Airport. The 33.5-kilometre (20.8 mi) Colaba-Bandra-SEEPZ line will be built at a cost of 21,000 crore (US$2.9 billion),[21] and will be the city's first underground metro line. It will have 27 stations.[22]

On 27 February 2012, the Union Government gave in-principle approval to the plan for Line 3. Money for the project is being borrowed from Japanese International Cooperation Agency (50%), the state government (16%), the central government (14%), and others.[23] In April 2012, the MMRDA announced plans to grant the Mumbai Metro Rail Company increased management autonomy, in an effort to enhance the project's operational efficiency.[24] In July 2012, the MMRDA announced plans to add more metro lines to its existing plan, including a line parallel to the Western Express Highway from Bandra to Dahisar. This line is expected to reduce the passenger load on the Western Line and vehicle traffic on the highway. Another proposed route, the 30-kilometre (19 mi), 28-station WadalaKasarvadavali line, received in-principle approval from the state government in 2013.[25] The MMRDA also intends to convert the proposed Lokhandwala–SEEPZ–Kanjurmarg monorail route into a metro line.[26]

A metro station under construction in Andheri in March 2012.

The Mumbai Metro master plan was revised by the MMRDA in 2012, increasing the total length of the proposed network to 160.90 km.[27] In June 2015, two new lines were proposed. A line from Andheri West to Dahisar West, and a line from BKC to Mankhurd.[28] The following table shows the updated master plan unveiled by the MMRDA:

Metro rake of Line 1 approaching Andheri station in 2019
Line Name of Corridor[29] Length (km) Stations Estimated cost Status Opening
1 Versova–Andheri–Ghatkopar 11.40 12 ₹4,321 crores Opened 8 June 2014
2 2A: Dahisar-Charkop-Andheri West 18.5 17 ₹6,410 crores Partially Opened 2 April 2022
2B: Andheri West-Mandala 23.6 22 ₹10,986 crores Under construction TBA
3 Colaba - Bandra – SEEPZ 33.5 27 ₹24,430 crore Under construction TBA
4 Wadala–Ghatkopar-Mulund–Teen Hath Naka–Kasarvadavali 32.32 32 ₹14,549crore Under construction TBA
4A Kasarwadavali-Gaimukh 2.7 2 ₹949 crores Under construction TBA
5 Thane-Bhiwandi-Kalyan 24.9 17 ₹8,417 crores Under construction TBA
6 Lokhandwala-Jogeshwari-Kanjurmarg 14.5 13 ₹6,716 crores Under construction TBA
7 Dahisar (East) - Bandra (East) 16.5 13 ₹6,208 crores Partially Opened 2 April 2022
7A Andheri-CSMIA 3.17 2 TBA Under construction TBA
8 CSMIA T2-NMIA 35 ₹15,000 crores (approx) Proposed
9 Dahisar (East)-Mira-Bhayander 10.3 8 ₹6,518 crores Under construction
10 Gaimukh-Shivaji Chowk (Mira Road) 9.2 9 ₹5,000 crores Approved
11 Wadala-CSMT 12.7 11 ₹8,739 crores Approved
12 Kalyan-Dombivali-Taloja 20.7 17 ₹5,865 crores Approved
13 Mira Bhayander-Virar 23 TBA ₹6,900 Proposed
14 Kanjurmarg-Badlapur 45 TBA ₹13,500 Approved
Total 337 202 ₹1,40,814+ crores

On 18 February 2013, the MMRDA signed a memorandum of understanding with Transport for London, the transit authority in Greater London. The arrangement will facilitate the exchange of information, personnel and technology in the transportation sector.[30][31][32][33]

The revised Mumbai Metro master plan had proposed a line along the Thane-Teen Haath Naka-Kaapurbavdi-Ghodbunder Road route. The feasibility report concluded that the line was not feasible as most residents of Thane and its neighbouring areas travelled to Mumbai for work daily. On 14 June 2014, Chavan announced that the MMRDA was instead examining a proposal for a metro line along the new proposed route of Wadala-Ghatkopar-Teen Haat Naka route. RITES will prepare the detailed project report and is expected to submit it by August 2014. The preliminary report proposed a 32 km line with 29 stations, to be built at an estimated cost of 22,000 crore.[34] This would be the fourth line of the metro, after the previously proposed Charkop-Dahisar route was merged with the Charkop-Bandra-Mankhurd route to form Line 2.[35]

Following the opening of Line 1, MMRDA metropolitan commissioner UPS Madan stated that the authority would focus on constructing the Colaba-Bandra-SEEPZ, Dahisar-Bandra-Mankhurd, and Wadala-Thane-Kasarvadavali lines. He also stated that the other proposed lines had not been cancelled and that they may be implemented in the future.[36] In May 2015, the MMRDA stated that it had begun planning for the Andheri-Dahisar line and Seepz-Kanjurmarg. Both lines are expected to be elevated, although the latter could be constructed underground if a proposal to extend Line 3 to Kanjurmarg is undertaken. DPRs for both lines had been prepared in 2004, along with the master plan, and the MMRDA would now update the DPRs. The agency also intends to construct Line 9 of the metro as an underground corridor from Sewri to Worli. However, planning for the project will only begun after the construction of the proposed Mumbai Trans Harbour Link commences.[37]

In a report on 14 November 2014 about the cancellation of the PPP agreement for Line 2, Mint quoted a senior MMRDA official as stating, "as decided earlier, all future lines of Mumbai Metro will be constructed by the Mumbai Metro Railway Corp. Ltd (MMRCL), a joint venture between the state government and the Union government."[38] On 20 May 2015, Chief Minister Devendra Fadnavis requested officials to consider constructing the Charkop-Bandra-Dahisar and the Wadala-Thane-Kasarvadavali lines as elevated corridors. Although, both corridors had been planned as elevated lines in the Mumbai Metro master plan, the previous Congress-NCP had decided to construct all metro lines underground, after delays and difficulties caused by acquiring land for Line 1. However, Fadnavis believes that the two proposed lines can be constructed quicker and cheaper if they were elevated due to the proposed route of the alignment.[39] The Government plans to implement all future metro lines (except Line 3) as elevated corridors.[40] On 15 June 2015, the MMRDA announced that it would implement Line 2 of the metro in three parts. The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line.[40]

In June 2015, Fadnavis announced that he would request the Delhi Metro Rail Corporation (DMRC) to assist in the implementation of the Mumbai Metro. He stated that he intends to expand the metro system by 109 km before the state assembly elections in October 2019.[41][42][43] In July 2015, UPS Madan announced that the State Government formally appointed the DMRC to revise and update the Mumbai Metro master plan. The DMRC will prepare DPRs for the Andheri East to Dahisar East, Jogeshwari to Kanjurmarg, Andheri West to Dahisar West and Bandra Kurla Complex to Mankhurd lines.[44] The Andheri-Dahisar line will have connectivity with the existing Line 1 and the proposed JVLR-Kanjurmarg line.[40] All four lines are proposed to be elevated and constructed as cash contracts. The lines are estimated to cost a total of 21,000 crore (US$2.9 billion), or about 350 crore (US$49 million) per km.[28] In addition, the planned Line 3 and Wadala-Ghatkopar-Thane-Kasarvadavli line of the metro would also be constructed.[44]

Fadnavis announced on 8 April 2017 that the government was considering a circular metro loop line along the Kalyan-Dombivli-Taloja route. The proposed 15 km line would link Kalyan and Shil Phata with 13 stations, bring metro connectivity to Kalyan East, Dombivli, Ambernath and Diva.[45][46]

The Mumbai Metro resumed services for general public on 19 October 2020, after being shut down since March 2020 due to the COVID-19 pandemic.[47][48]

Network[edit]

Lines on the Mumbai Metro are currently identified by numbers. In March 2016, MMRDA Metropolitan Commissioner, U.P.S. Madan, announced that all lines on the system would be color-coded after more lines are opened.[49]

Operational Lines[edit]

Color Line
No.
First Operational Last Extension Terminal Depot Length Total
Stations
Layout Rolling
Stock
Annual
Rider-
ship
(millions)
Operator Owner
Blue
Line
1
8 June 2014 N/A Versova Ghatkopar DN Nagar 11.40 km (7.08 mi) 12 Elevated CRRC
Nanjing
Puzhen

129.58[50] MMOPL MMOPL

Reliance
Infrastructure
MMRDA
RATP Dev-
Transdev Asia

Yellow
Line
2A
2 April 2022 N/A Dahisar (East) Dahanukarwadi Charkop 9.50 km (5.90 mi) 9 Elevated BEML N/A MMMOCL MMRDA
Red
Line
7
2 April 2022 N/A Dahisar (East) Aarey Road Junction Charkop (interim) Bhayandar West (tendering) 9.75 km (6.06 mi) 10 Elevated BEML N/A
3 Total 30.65 km (19.05 mi) 31 129.58

Future Lines[edit]

  UC → Under construction
  APR → Approved
  PLA→ planned
Color Line
No.
Termininal Depot Length Total
Stations
Layout
Rolling
Stock
Operator Owner
Yellow
Line
2B
DN
Nagar

Mandala
(Mankhurd)
Mandala 23.643 km (14.691 mi) 20 Elevated BEML
MMMOCL MMRDA
Aqua
Line
3
Aarey
Colony

Cuffe
Parade
Aarey Colony

(According to DPR) / Kanjurmarg (Possible new site)

33.5 km (20.8 mi) 27 Underground Alstom
MMRCL MMRCL GOI GOM
Green
Line
4
Kasar-
vadavali

Wadala
Vikhroli 32.32 km (20.08 mi) 32 Elevated TBD MMMOCL MMRDA
Green
Line
4A
Gaimukh
Kasar-
vadavali
Mogharpada 2.7 km (1.7 mi) 2
Orange
Line
5
(Kapurbawdi)
Thane

Kalyan
APMC
Kasheli 24.9 km (15.5 mi) 17
Pink
Line
6
Swami
Samarth
Nagar
(Lokhand
wala)

Vikhroli EEH
Kanjurmarg 14.47 km (8.99 mi) 13
Gold
Line
8
CSMIA International
NMIA
TBD 40 km (25 mi) 12 Elevated

and Underground

TBD MMMOCL MMRDA
Red
Line
9
Dahisar
(East)

Mira-
Bhayandar
Bhayandar
(West)
11.38 km (7.07 mi) 10 Elevated BEML MMMOCL MMRDA
Green
Line
10
Gaimukh
Shivaji Chowk
(Mira Road)
Gaimukh 9 km (5.6 mi) 5 Elevated TBD MMMOCL MMRDA
Green
Line
11
Wadala
CSMT
TBD 14 km (8.7 mi) 10 Elevated

and Underground

Orange
Line
12
Kalyan
APMC

Taloja
20.75 km (12.89 mi) 17 Elevated
Purple
Line
13
Shivaji Chowk
(Mira Road)

Virar
23 km (14 mi) 20 TBD
Magenta
Line
14
Vikhroli EEH
Badlapur
45 km (28 mi) 40
13 Total 345.572 km (214.728 mi) 274

§ Numbers in italics denote data that is estimated
Lines labeled APR are either in DPR stage, or have not yet entered the planning stage, while those labelled Planned are awaiting clearances to enter the tendering stage
E=Elevated
†† UG=Underground
§§§ Extrapolated from weekday daily ridership numbers reported for the last reported fiscal

Lines[edit]

 Blue Line 1 [edit]

Metro trains arriving at different stations.
Infodesk at stations.

Line 1 connects Versova in the Western Suburbs to Ghatkopar in the Central Suburbs, covering a distance of 11.4 kilometres (7.1 mi).[51] It is fully elevated, and consists of 12 stations.[51] Work on the Versova-Andheri-Ghatkopar corridor, a part of Phase I, began on 8 February 2008. A crucial bridge on the project was completed at the end of 2012.[52] The line opened for service on 8 June 2014.[53]

 Yellow Line 2 [edit]

This corridor is being executed in two phases i.e. 2A and 2B.

The 18.589 km (11.551 mi)[54] long 2A corridor is being executed by DMRC on behalf of MMRDA. The corridor has 17 stations (Dahisar (West) to D N Nagar), and is expected to cost 6,410 crore (equivalent to 72 billion or US$1.01 billion in 2019).

Its civil works, including viaduct and stations, are being executed by J.Kumar Infra-CRTG JV. The corridor is partially operational since April 2, 2022.

The 2B corridor will be 23.643 km (14.691 mi) long, and is estimated to cost 109.7 billion (equivalent to 120 billion or US$1.74 billion in 2019), including land acquisition cost of 1,274 crore (equivalent to 14 billion or US$201.62 million in 2019). This section will have 22 stations (D N Nagar to Mandale), work on which began in mid 2018.[55]

Its civil works, including viaduct and stations, is being executed by Simplex Infrastructure, RCC-MBZ JV and Neeraj-Guam JV. It'll be operational by October 2022.

Line 2 is being partially funded through multilateral debt to the tune of 7,498 crore (equivalent to 85 billion or US$1.19 billion in 2019) from ADB.

2A

Expected Cost: ₹6,410 crore

Expected Daily Ridership: 9 Lakh (900,000)

2B

Expected Cost: ₹10,986 crore

Expected Daily Ridership: 10.5 Lakh (1,500,000)

Rolling Stock: BEML

 Aqua Line 3 [edit]

This corridor is entirely built underground, and is 33.50 km (20.82 mi) long, with 27 stations.[56] The metro line will connect the Cuffe Parade business district in the south of Mumbai with SEEPZ and Aarey in the north.[57] It will also pass through the Domestic and International airports of Mumbai, for which the airport operator (GVK) has promised an equity infusion of 777 crore (equivalent to 944 crore or US$132.29 million in 2019).[58]

The cost of this corridor is estimated at 23,136 crore (equivalent to 260 billion or US$3.66 billion in 2019).[59][60] The original deadline for the project was 2016, but it is currently expected to be completed only by Dec 2023 due to Covid delays.

Upon completion, it will have interchanges with the planned Line 6 at SEEPZ, Line 1 at Marol Naka, Line 2 at BKC, Central Line at Chhatrapati Shivaji Terminus, Mumbai Monorail at Mahalaxmi (Jacob Circle), and Western Line at Mahalaxmi, Mumbai Central and Churchgate.

57% of the funds needed for this project are being sourced as multilateral debt from JICA.

Expected Cost: ₹23,136 crore

Expected Daily Ridership: 17 Lakh (1,700,000)

Rolling Stock: Alstom

 Green Line 4 [edit]

The line 4 of Mumbai Metro is envisaged to be a 32.32 km (20.08 mi)[61] long elevated corridor, covering 32[61] stations from Kasarvadavali (near Thane) in the north to Wadala in the south. It is estimated to cost 14,549 crore (equivalent to 160 billion or US$2.30 billion in 2019). This project will help connect the city of Thane with Mumbai with an alternate mode of public transport.

The line was approved by the Maharashtra Government on 27 September 2016,[62][63] and construction work on this line began in mid 2018.[55]

The construction of viaducts and stations is being executed by consortium of Reliance-Astaldi JV and Tata Projects-CHEC JV.

The Asian Infrastructure Investment Bank has extended a multilateral loan of 3,916 crore (equivalent to 44 billion or US$619.75 million in 2019)[64] for this project.[65] It is expected to get completed by October 2022.

Expected Cost: ₹15,498 crore

Expected Daily Ridership: 13.4 Lakh (1,340,000)

 Orange Line 5 [edit]

The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost ₹8,416 crore. It will be totally an elevated corridor. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs, with further extension to Taloja in Navi Mumbai that is line 12.

The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan railway station and Kalyan APMC.

The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016.[66][67] The MMRDA plans to begin construction of the line by December 2017.[68] The line is getting delayed due to finalisation of alignment which is facing resistance of locals. It will be ready by August 2022. The corridor is being constructucted by Afcons in one package from Kalyan to Bhiwandi including 7 stations.

Expected Cost: ₹8,417 crore

Expected Daily Ridership: 3 Lakh (300,000)

 Pink Line 6 [edit]

The 14.47 km long Lokhandwala-Jogeshwari-Vikhroli-Kanjurmarg Metro-VI corridor will have 13 stations and cost ₹6,672 crore. It will be an elevated corridor. It will connect Lokhandwala Complex in Andheri in the western suburbs to Vikhroli and Kanjurmarg in the eastern suburbs.

The stations include Lokhandwala Complex, Adarsh Nagar, Momin Nagar, JVLR, Shyam Nagar, Mahakali Caves, SEEPZ Village, Saki Vihar Road, Ram Baug, Powai Lake, IIT Powai, Kanjurmarg (W), Vikhroli-Eastern Express Highway.

Metro 6 will provide interchange with Metro 2 at Infinity Mall in Andheri, with Metro 3 at SEEPZ, with Metro 4 and the Mumbai Suburban Railway at Jogeshwari and Kanjurmarg, and with Metro 7 at JVLR.[69]

The line was approved by Chief Minister Devendra Fadnavis on 19 October 2016.[66][67] The MMRDA issued a tender to conduct a detailed aerial mapping survey of the alignment in April 2017. Authorities will also be able to determine the location of trees along the alignment accuracy of up to 10 cm utilizing a differential GPS (DGPS), while a digital aerial triangulation system will help determine the types of trees, their heights and diameters.[70]

The MMRDA plans to begin construction of the line by late 2018. It will be ready by October 2022.

The construction of viaduct and station work is being executed by J Kumar Infraprojects and MBZ-EIIL JV.

Expected Cost: ₹6,672 crore

Expected Daily Ridership: 7.2 Lakh (720,000)

 Red Line 7 [edit]

This corridor is 16.475 km (10.237 mi)[71] long, and runs from Dahisar (East) in the north to Andheri (East) in the south, with a further extension till Bhayander[72] in the north, and Mumbai International Airport Terminal 2[73] in the south. The line is partially elevated (under construction, with completion slated for 2019), and partially underground (approved, with construction planned to begin in 2018).

The elevated section is expected to cost 6,208 crore (equivalent to 72 billion or US$1.01 billion in 2019), while the outlay for the recently approved underground section is 600 crore (equivalent to 677 crore or US$94.96 million in 2019). Civil works, including viaduct and station works, is being executed by NCC, Simplex Infrastructure, and J. Kumar Infraprojects. The corridor is partially operational since April 2, 2022.

The corridor is being funded through multilateral debt to the tune of 2,246 crore (equivalent to 25 billion or US$355.45 million in 2019)[64] by Asian Development Bank. The cost of the 13.5 km extension till Bhayander in the north is expected to be around 3,600 crore (equivalent to 41 billion or US$569.74 million in 2019).[72][74]

Expected Cost: ₹6,208 crore

Expected Daily Ridership: 6.7 Lakh (670,000)

Rolling stock: BEML

 Gold Line 8 [edit]

This is a proposed metro line between the Chhatrapati Shivaji Maharaj International Airport and the proposed Navi Mumbai International Airport.[75] It will connect Mumbai airport to upcoming Navi Mumbai airport • and its length would be approx 32 km.

Expected Cost: ₹15,000 crore approx.

Expected time of completion: October 2026

Expected Daily Ridership: 3 Lakh (300,000)[76]

 Red Line 9 [edit]

Extension of line 7 (Red line)

Metro line 9 will ply between Dahisar-Mira Bhayander route. It will have 10 stations all elevated. The proposed Metro of Dahisar to Mira-Bhayandar will cut down approximately 30 km of travel distance between the Mira-Bhayandar and Mumbai suburbs. It is an extension of Line 7

Expected time of completion: October 2022

Expected Daily Ridership: 4.4 Lakh (440,000)

 Green Line 10 [edit]

Extension of line 4 (Green Line)

In February 2017, the MMRDA announced that the DMRC was preparing a detailed project report (DPR) on Metro 10, a proposed 9 km elevated extension of Metro 4 from Gaimukh to Chatrapati Shivaji.[77]

The project is estimated to cost 3,908 crore (US$550 million) with an estimated ridership of 2.5 lakh (250,000).[78][79][80][81] It will be completed by October 2024.

 Green Line 11 [edit]

Extension of line 4 (Green Line)

In November 2018, the MMRDA cleared the Metro 11, which connects Wadala with CSMT. This would be considered to be an extension to Metro 4. The length of the line is 11.4 km, and it proposed to cost ₹8,739 crore (US$1.207 billion). The line will be partially underground, with 8 underground and 2 elevated stations. It will be completed by October 2026.

 Orange Line 12 [edit]

Extension of line 5 (orange Line)

MMRDA has planned the Metro 12, which will connect Kalyan with Taloja. It is an extension of line 5. In another boost to connectivity, the Mumbai Metropolitan Region Development Authority (MMRDA) has decided to connect Mumbai, Thane and Navi Mumbai with a Metro line. The estimated cost of the project is ₹5,865 crore and construction began in August 2020.[82] It will be completed by October 2024.

 Purple Line 13 [edit]

It is a proposed metro project to connect Mira Road with Virar. The project length is 23 km and the estimated cost of the project is ₹6,900 crore.

This project is now at DPR stage. It will be completed by October 2026.

 Magenta Line 14 [edit]

It is an approved metro project to connect Vikhroli with Kanjurmarg and further to Ambernath-Badlapur. It will have an intersection at Kanjurmarg with line 6 i.e. Pink line. This project is now at the DPR stage. The project length is 45  km and the estimated cost of the project is ₹13,500 crore. It will be completed by October 2026.

Rolling stock[edit]

Reliance Infrastructure consulted a number of major international rolling stock builders to provide the train fleet for the Mumbai Metro. Bidders for the contract included established metro-vehicle manufacturers such as Kawasaki, Alstom, Siemens and Bombardier, but CRRC Nanjing Puzhen of China was ultimately chosen to supply rolling stock for ₹600 crore.[83][84] In May 2008, CSR Nanjing completed the first 16 trains, each comprising four cars.[83] The first ten trains were reported to be ready for operation in January 2013.[85]

The coaches are fire retardant,[86] air-conditioned and designed to reduce noise and vibration, and will feature both high seating capacity and ample space for standing passengers. They will be outfitted with a number of features for safety and convenience, including LCD screens, 3D route maps, first-aid kits, wheelchair facilities, fire-fighting equipment and intercom systems permitting communication with the train driver. Each coach will furthermore feature a black box to assist in accident investigations.[87] The trains will be capable of carrying over 1,100 passengers in a four-car unit, with each carriage being approximately 2.9 metres (9.5 ft) wide.[88]

In 2018, the Mumbai Metro Rail Corporation chose Alstom to supply 31 eight car trains for Aqua line (line 3). The trains will be capable of driverless operations and will be built at Alstom's factory in Sri City, Andhra Pradesh.[89]

In 2018, Mumbai Metropolitan Region Development Authority which will operate all metro lines except Line 3, awarded a tender to Bharat Earth Movers (BEM) to supply 63 trainsets (378 coaches) for Yellow Line(line 2) and Red Line (line 7) at a cost of ₹3,015 crores ($427.33 million). Capable of driverless operations, the trains are manufactured at BEM's factory in Bengaluru and first rake For Yellow Line arrives in Mumbai on 27 January 2021, and will continue to receive the rest of the rakes till 2022.[90][91] Recently on 17 January 2021, Bombardier won the tender to supply 234 driverless coaches for Green Line(line 4) of six-car configuration for Mumbai metro. However, the contract has been cancelled in March 2022 due to delays and uncertainties of the project.[92][93]

Power supply[edit]

Unlike 97% of metro corridors worldwide which run on direct current (DC), the Mumbai Metro runs on alternating current (AC) which is more labour and cost-intensive. MMRDA joint project director Dilip Kawathkar stated that AC power was chosen "after a proper study by a team of experts" which found that the AC model was "a better option". Bidders for Line 3 were reportedly in favour of the DC model. Experts believe that the decision to use AC will escalate the project cost of underground lines by 15%, since more digging is required for the rail to work on AC.[94]

Signalling and communications[edit]

The Mumbai Metro will feature an advanced signalling system, including an automatic train protection system (ATPS) and automated signalling to control train movements on the 11-kilometre (6.8 mi) Line 1. A four-minute service interval is anticipated on the route.[3]

Siemens will supply the signalling systems required for the project, while Thales Group will supply the Metro's communication systems. The network's signalling and train control systems will be based on LZB 700M technology.[95]

Ridership[edit]

On 21 October 2019, exactly after 1,960 days (approx. 5 years) of Mumbai Metro Line 1's inception, the system crossed 60 crore passengers, with an average daily ridership of around 4,50,000 (4.5 lakh) passengers.[96]

See also[edit]


References[edit]

  1. "BEST Strike Pushes daily metro ridership over 5 lakh for first time". The Times of India.
  2. "Overhead Metro wires to be charged". Hindustan Times. 27 February 2014. Archived from the original on 23 December 2013. Retrieved 5 March 2013.
  3. 3.0 3.1 3.2 "Mumbai Metro project". MMRDA. 1 January 2008. Retrieved 1 January 2010.
  4. "Our projects - MMRDA". mmrda. MMRDA. Retrieved 27 August 2018.
  5. "Know your metro". mmrcl. MMRCL. 27 June 2015. Retrieved 27 August 2018.
  6. "Mumbai Metro One Pvt. Ltd. (MMOPL)". MMOPL. Retrieved 4 March 2020.
  7. "Despite loan waiver, major projects not funded by govt to be on track". 27 June 2017.
  8. "Mumbai monorail to be ready by Dec, Metro by March". Business Standard. 12 June 2012. Retrieved 7 July 2013.
  9. "Mumbai's first metro may chug in 2013". DNA India. 6 May 2012. Retrieved 8 May 2012.
  10. "Metro, Monorail projects could miss deadline". The Indian Express. 14 August 2011. Retrieved 21 September 2011.
  11. "Mumbai: The connected city". Mint. 20 June 2013. Retrieved 7 July 2013.
  12. "Mumbai Metro trial run successful". Times of India. 1 May 2013. Archived from the original on 29 June 2013. Retrieved 5 June 2013.
  13. "Mumbai Metro: trial run with train draped in flowers". NDTV. 1 May 2013. Retrieved 5 June 2013.
  14. "Mumbai Metro Line 7 (Red Line): Stations, Fare, Route Map, Status, & Timeline". Mumbai Metro Times - Your Metro Guide. Retrieved 3 April 2022.
  15. "Mumbai Metro - Line 2A (Yellow Line): Stations, Fare, Route Map, Status, & Timeline". Mumbai Metro Times - Your Metro Guide. Retrieved 3 April 2022.
  16. United Nations Population Division - City Population Archived 10 March 2007 at the Wayback Machine. Retrieved 5 October 2011.
  17. Average Annual Rate of Change Archived 10 March 2007 at the Wayback Machine. United Nations Population Division. Retrieved 5 October 2011.
  18. Mumbai Suburban Railway Network. Western Railway – Indian Railways. Updated 9 April 2012. Retrieved 26 April 2012.
  19. 19.0 19.1 19.2 "Mmrda – Projects – Mumbai Metro Rail Project". Mmrdamumbai.org. Archived from the original on 19 March 2012. Retrieved 12 March 2014.
  20. "Metro Rail-I to be operational in Mumbai in 2012". The Economic Times. 5 September 2011. Retrieved 24 October 2011.
  21. "Development body in talks with CSIA". The Indian Express. 14 January 2012. Retrieved 16 January 2012.
  22. "Views on Colaba-Seepz underground metro sought". DNA India. 14 December 2011. Retrieved 30 December 2011.
  23. "Centre paves way for 3rd Metro line". The Times of India. 28 February 2012. Archived from the original on 2 February 2014. Retrieved 28 March 2012.
  24. "Mumbai Metro likely to get autonomy status: MMRDA". DNA India. 27 April 2012. Retrieved 3 May 2012.
  25. "Soon, take a metro from south Mumbai to Thane" Archived 30 April 2013 at the Wayback Machine. Hindustan Times. 23 April 2013. Retrieved 5 June 2013.
  26. "MMRDA to add more lines to Mumbai Metro railway project". DNA India. 8 July 2012. Retrieved 27 July 2012.
  27. "Third phase of metro rail inaugurated". @businessline.
  28. 28.0 28.1 "Over 130 km of Metro lines to criss-cross city by 2020". 16 June 2015.
  29. "MMRDA - Mumbai Metro Master Plan". mmrda.maharashtra.gov.in. Retrieved 3 April 2014.
  30. "Mumbai transport body, London counterpart ink MoU". Business Line. 2 March 2013. Retrieved 5 June 2013.
  31. "MMRDA inks pact with UK transport authority". Indian Express. 19 February 2013. Retrieved 5 June 2013.
  32. "MMRDA, Transport for London ink MoU for under ground metro in Mumbai". Business Standard. 18 February 2013. Retrieved 5 June 2013.
  33. Mumbai metro to run 150 km Deccan Herald 18 February 2013
  34. "Mumbai Metro services to be extended till Thane: Prithviraj Chavan". The Economic Times. 14 June 2014.
  35. "First Metro line to be extended to Wadala and Thane - Times of India". The Times of India.
  36. "MMRDA changes decade-old Mumbai Metro master plan". 14 June 2014.
  37. "MMRDA plans two new Metro lines for Mumbai". Hindustan Times. 20 May 2015.
  38. "Reliance Infra pulls out of Mumbai Metro Line 2". Mint. 13 November 2014.
  39. "Mumbai metro rail: State considers elevated Metro route". 21 May 2015.
  40. 40.0 40.1 40.2 "Metro 2 to be built in three phases, 2 other routes also on cards". Hindustan Times. 16 June 2015.
  41. "Business News: Business News India, Business News Today, Latest Finance News, Business News Live".
  42. Jog, Sanjay (16 June 2015). "Mumbai Metro seeks Delhi counterpart's help to expedite project". Business Standard India – via Business Standard.
  43. "Pan-Mumbai Metro network by 2019, targets Maharashtra". 11 June 2015.
  44. 44.0 44.1 "Mumbai Metro master plan: Maharashtra government nod for Delhi body revise and update blueprint". dna. 2 July 2015.
  45. "Metro loop to connect central suburbs, Navi Mumbai on cards". Asian Age. 9 April 2017. Retrieved 9 April 2017.
  46. "Kalyan-Dombivli-Taloja metro under consideration: Devendra Fadnavis". The Economic Times. Retrieved 9 April 2017.
  47. "Mumbai local services suspended till March 31 due to Covid-19: All you need to know". Hindustan Times. 22 March 2020. Retrieved 10 August 2021.
  48. "Mumbai Metro News: Mumbai Metro resumes operations with Covid protocols | Mumbai News - Times of India". The Times of India. ANI. 19 October 2020. Retrieved 10 August 2021.
  49. "Mumbai Metro to Color Code Lines ; Sreedharan Appointed as Advisor". The Metro Rail Guy. 31 March 2016. Retrieved 9 March 2017.
  50. "Mumbai Metro Line 1: Even as ridership falls short of target, losses mount, hope floats on new lines". 22 May 2017. Retrieved 3 January 2018.
  51. 51.0 51.1 "Know Your Metro - Features". Reliance Mumbai Metro. Archived from the original on 24 September 2015. Retrieved 8 June 2014.
  52. "Metro ride in June '13? Work on crucial bridge completed". The Times of India. 26 December 2012. Archived from the original on 28 September 2013. Retrieved 6 January 2013.
  53. "Maharashtra CM Prithivraj Chavan flags off Mumbai Metro". The Times of India. 8 June 2014. Retrieved 8 June 2014.
  54. "Mumbai Metro Line 2A (DAHISAR - D.N. NAGAR)". 6 June 2017. Retrieved 6 June 2017.
  55. 55.0 55.1 "Contractors appointed for Metro 2B and Metro 4". asianage.com/. 4 March 2018. Retrieved 6 March 2018.
  56. "Cabinet clears Mumbai Metro's third line". The Times of India. 29 June 2013. Retrieved 7 July 2013.
  57. "Further delay in Colaba-Seepz metro as govt tweaks bid norms | Business Standard". Business Standard India. business-standard.com. Press Trust of India. 4 February 2014. Retrieved 3 April 2014.
  58. "MIAL Signs MoU with MMRC to Contribute Rs 777 cr to Build Airport Stations on Mumbai's Line 3". 18 September 2015. Retrieved 25 June 2017.
  59. "Mumbai Metro Line 3 plan kicks off". Mumbai Mirror. 29 June 2013. Retrieved 7 July 2013.
  60. "Cabinet approves Mumbai Metro Line 3: FM". Zee News. 28 June 2013. Retrieved 7 July 2013.
  61. 61.0 61.1 "Mumbai Metro Line 4 (WADALA - KASARVADAVALI)". MMRDA. Retrieved 6 June 2017.
  62. "Maharashtra Cabinet Gives Go-Ahead For Two Metro Lines". NDTV.com. Retrieved 12 February 2017.
  63. "Metro-4 gets thumbs-up from Devendra Fadnavis". dna. 4 June 2016.
  64. 64.0 64.1 "Mumbai's Metro projects get a boost, two financial institutions agree to fund ₹13,660 crore". Hindustan Times. 20 June 2017.
  65. "Mumbai Metro Phase 4 may cover entire Ghodbunder Road stretch in Thane | mumbai news | Hindustan Times". 3 February 2017. Archived from the original on 3 February 2017. Retrieved 8 February 2017.
  66. 66.0 66.1 "New metro lines for Mumbai and Thane; project to cost Rs 15,000 crore". Business Standard India. 19 October 2016. Retrieved 12 February 2017.
  67. 67.0 67.1 "Kalyan-Thane, Lokhandwala-Kanjurmarg metro lines get approval". dna. 20 October 2016. Retrieved 12 February 2017.
  68. "Mumbai: MMRDA plans to begin work on five more Metro lines by December". The Indian Express. 7 April 2017. Retrieved 7 April 2017.
  69. "Mumbai's east-west connectivity to get a boost with another Metro corridor". hindustantimes.com. 2 March 2017. Retrieved 2 March 2017.
  70. "MMRDA to begin tree count for Metro 6". mid-day. 6 April 2017. Retrieved 6 April 2017.
  71. "Mumbai Metro Line 7 (ANDHERI EAST - DAHISAR EAST)". Retrieved 11 June 2017.
  72. 72.0 72.1 "Mira-Bhayander to be connected with Metro - Times of India". The Times of India. Retrieved 23 March 2017.
  73. "State clears extension of Metro 7 up to Terminal 2". Retrieved 23 May 2017.
  74. "Plans to extend metro stations to Bhayander may be implemented soon | Latest News & Updates at Daily News & Analysis". dna. 25 February 2017. Retrieved 23 March 2017.
  75. "Mumbai Metropolitan Region Development Authority - Metro Line - 8". mmrda.maharashtra.gov.in.
  76. https://mmrda.maharashtra.gov.in/documents/10180/11273712/62%2C943+cr+for+METRO+PROJECTS.pdf/cb92ba27-a1af-45d5-8047-7e145368e7cb[permanent dead link]
  77. "Bidding for Metro 10 line to start later this year | Latest News & Updates at Daily News & Analysis". dna. 22 March 2017. Retrieved 24 March 2017.
  78. Expected Daily Ridership – 2.5 Lakh
  79. "Mira-Bhayander to be connected with Metro". The Times of India. Retrieved 25 February 2017.
  80. "Plans to extend metro stations to Bhayander may be implemented soon". dna. 25 February 2017. Retrieved 25 February 2017.
  81. "Dahisar metro extension work to begin in December 2017". Asian Age. 25 February 2017. Retrieved 25 February 2017.
  82. Narendra Shah (12 January 2020). "MMRDA likely to begin work on Mumbai Metro line 10, 11 and 12 in 2020". Metro Rail News. News. Retrieved 3 September 2020.
  83. 83.0 83.1 Mumbai's beautiful butterfly emerges Railway Gazette International 25 March 2010
  84. "Mumbai Metro One Project updates". mumbai-metro.com. Archived from the original on 18 November 2011. Retrieved 25 August 2010.
  85. "Mumbai metro trains raring to run, but where are tracks?". DNAIndia. 23 January 2013. Retrieved 6 February 2013.
  86. "A Mumbai Metro train every three minutes". DNA India. 1 May 2013. Retrieved 7 July 2013.
  87. "Metro first line hinges on Andheri bridge". Times of India. 11 October 2011. Retrieved 18 October 2011.
  88. Katkurwar, Saurabh (26 February 2012). "CIDCO opts for wider metro coaches". MiD DAY. Retrieved 28 March 2012.
  89. Nag, Devanjana (11 September 2018). "Mumbai Metro Line 3: Alstom wins 'Make in India' contract for modern train sets worth 315 million euros". The Financial Express. Retrieved 13 April 2020.
  90. "BEML receives order worth Rs 3015 crore for Mumbai Metro". Capital Market. Business Standard. 24 November 2018. Retrieved 30 November 2018.
  91. "BEML secures $427.33m Mumbai metro car supply contract". Railway Technology. 26 November 2018. Retrieved 30 November 2018.
  92. "Alstom terminates Mumbai Line 4 fleet contract". 10 March 2022. Retrieved 6 April 2022.
  93. "Alstom cancels order bagged from MMRDA for supply of coaches for Mumbai Metro 4". 4 March 2022. Retrieved 6 April 2022.
  94. "Mumbai s Metro-3 will be one of the few in the world to run on AC". mid-day. 15 May 2014.
  95. "MMOPL awards contract to ABB, Siemens, SEW". Projects Today. 8 January 2008. Retrieved 15 January 2010.
  96. "Versova-Ghatkopar Metro One crosses 60 crore ridership in 5 years". The Times of India. 21 October 2019. Retrieved 21 October 2019.

External links[edit]

Template:Maharashtra transit