Sakherbazar metro station
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these template messages)
|
| Kolkata Metro | |||||||||||
| Location | Diamond Harbour Rd, Silpara, Purba Barisha, Kolkata, West Bengal 700008 India | ||||||||||
| Coordinates | 22°28′29″N 88°18′36″E / 22.474611°N 88.309991°E | ||||||||||
| Owned by | Metro Railway, Kolkata | ||||||||||
| Operated by | Metro Railway, Kolkata | ||||||||||
| Platforms | Side Platform | ||||||||||
| Tracks | 2 | ||||||||||
| Construction | |||||||||||
| Structure type | Elevated | ||||||||||
| Platform levels | 2 | ||||||||||
| Parking | No | ||||||||||
| Disabled access | Yes | ||||||||||
| Other information | |||||||||||
| Status | Under construction | ||||||||||
| History | |||||||||||
| Opening | 2022 | ||||||||||
| Electrified | 750V DC | ||||||||||
| Services | |||||||||||
| |||||||||||
| Location | |||||||||||
Sakherbazar is a planned metro station of Kolkata Metro Line 3, which is under construction.[1] It is an elevated station, and will have side platforms. It is due to open in the first phase of this line. This is expected to be opened in 2022.
The station[edit | edit source]
| G | Street Level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform doors will open on the left | |
| Northbound | Towards →Esplanade→ → | |
| Soithbound | →Towards ←Diamond Pak← ← | |
| Side platform doors will open on the left | ||
| L2 | ||
Connections[edit | edit source]
This section needs expansion. You can help by adding to it. (August 2019) |
Bus[edit | edit source]
Rail[edit | edit source]
Air[edit | edit source]
Entry/Exit[edit | edit source]
This section is empty. You can help by adding to it. (November 2019) |
References[edit | edit source]
- ↑ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 2019-08-25.
External links[edit | edit source]