Sealdah শিয়ালদহ | |||||
|---|---|---|---|---|---|
![]() Main exterior of the Sealdah metro station | |||||
| Location | Acharya Prafulla Chandra Rd, Sealdah, Rajabazar, Kolkata, West Bengal 700009 | ||||
| Coordinates | 22°34′02″N 88°22′17″E / 22.567207°N 88.371497°E | ||||
| Owned by | Metro Railway, Kolkata | ||||
| Operated by | Kolkata Metro Rail Corporation | ||||
| Line(s) | Template:Rcb | ||||
| Platforms | 2 side platforms; 1 island platform (Spanish solution) | ||||
| Connections | |||||
| Construction | |||||
| Structure type | Underground | ||||
| Depth | 16 m | ||||
| Parking | Yes | ||||
| Bicycle facilities | No | ||||
| Other information | |||||
| Status | Operational | ||||
| Station code | SDHM | ||||
| History | |||||
| Opened | 2022 July 11 | ||||
| Services | |||||
|
Template:Adjstn | |||||
| |||||
| Location | |||||
| Lua error in Module:Location_map at line 501: Unable to find the specified location map definition: "Module:Location map/data/India Kolkata Metro" does not exist. | |||||
Sealdah (also known as DTDC Sealdah for sponsorship reasons) is an important underground metro station on the East-West corridor of the Green Line of Kolkata Metro, located in Sealdah, Kolkata. The underground station adjoins with Sealdah railway station of the Indian Railways on its eastern side. The Sealdah Court is on the west side of the station, the Sealdah Flyover (Vidyapati Setu) is on the northern side of the station. There is a pedestrian subway linking the metro station with the railway station.
Inauguration[edit | edit source]
In March 2022, the Commissioner of Railway Safety gave his approval for the commencement of commercial operations at this station and the station was likely to be inaugurated on the occasion of Poila Baisakh on 15 April 2022.[1][2] However, the inauguration on the Poila Baisakh could not happen as some issues pointed out by the Commissioner of Railway Safety, were yet to be fixed. After missing a few deadlines, the Station was ultimately inaugurated by the Union Minister Smriti Irani on 11 July 2022,[3] with the commercial run beginning on 14 July 2022.[4] The station was connected to Esplanade on 22 August 2025.[5]
Layout[edit | edit source]
| G | Ground level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Ticket/token, shops |
| L2 Platforms |
Side platform | |
| Platform 1 | towards Template:Ltl (Template:Stl) → | |
| Island platform | ||
| Platform 2 | ← towards Template:Ltl (Template:Stl*) | |
| Side platform | ||
- Change at Esplanade for Template:Rcb & Template:Rcb
Connections[edit | edit source]
Rail[edit | edit source]
It is directly connected to the Sealdah railway station.
Gallery[edit | edit source]
More photos on commons:Category:Sealdah_metro_station
-
1B platform
-
Concourse area
-
Automated ticket vending machines
-
Station Name Plate
See also[edit | edit source]
References[edit | edit source]
- ↑ "Kolkata Metro: East-West Sealdah link gets CRS nod, Poila Baisakh start likely". Times of India. Retrieved 2 May 2022.
- ↑ "Sealdah Metro Station : নববর্ষে শহর পাচ্ছে না মেট্রোর নতুন স্টেশন". ETV Bharat News. Retrieved 2 May 2022.
- ↑ Nag, Jayatri. "Sealdah station of Kolkata metro inaugurated". The Economic Times. Retrieved 14 July 2022.
- ↑ Bhowal, Tiasa. "Kolkata is super excited as services from Sealdah metro station begins. See pics". India Today. Retrieved 14 July 2022.
- ↑ "'Efforts on to open 3 new metro lines next week'". The Times of India. 12 August 2025. ISSN 0971-8257. Retrieved 14 August 2025.




