Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Kolkata Metro Logo.svg Kolkata Metro Rail Corporation Logo.svg
Salt Lake Sector V
Kolkata Metro station
Under Construction Sector V Metro Station.jpg
Sector V, Metro Station
Other namesBandhan Bank Salt Lake Sector V
LocationSector – V, Salt Lake Bidhannagar, Kolkata – 700091
Coordinates22°34′53″N 88°25′47″E / 22.581318°N 88.429822°E / 22.581318; 88.429822
Owned byKolkata Metro Rail Corporation
Operated byMetro Railway, Kolkata
Platforms Line 2   Line 6 
Tracks4
Construction
Structure typeElevated (Line 2)
Elevated (Line 6)
Platform levels2
Disabled accessYes Disabled access
History
Opened13 February 2020; 4 years ago (13 February 2020)[1]
Electrified750V DC
Services
Preceding station   Kolkata Metro   Following station
TerminusLine 2
toward Kavi Subhash
Line 6
toward Biman Bandar
Location
Bandhan Bank Salt Lake Sector-V is located in Kolkata
Bandhan Bank Salt Lake Sector-V
Bandhan Bank Salt Lake Sector-V
Location within Kolkata

Salt Lake Sector – V (also known as Bandhan Bank Salt Lake Sector-V) is a station of the Kolkata Metro close to Nabadiganta Industrial Township, Salt Lake City, Kolkata, India. This metro station will be for Kolkata Metro Line 2 and Kolkata Metro Line 6. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress.[2] The stations of Line 2 and Line 6 will be connected by over-bridge.[3]

Structure[edit]

 Line 2 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Eastbound Terminus
Westbound Towards ←Karunamoyee← ←
Side platform doors will open on the left Disabled access
L2

 Line 6 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Northbound Towards →Nicco Park→ →
Southbound Towards ← Bidhannagar← ←
Side platform doors will open on the left Disabled access
L2

See also[edit]

Island Platform
Two tracks and one island platform

References[edit]

  1. "অবশেষে চলার পথে, ১৩ ফেব্রুয়ারি থেকে শুরু ইস্ট-ওয়েস্ট মেট্রো" (in Bengali). Kolkata: eisamay.indiatimes.com. 3 February 2020. Retrieved 3 February 2020.
  2. "Trial runs for new East-West Metro rakes to start in May". The Times of India .
  3. "Tech hub to mass-transit interface". The Telegraph.

External links[edit]