Created by anon
Last edited June 2, 2025
Talk
No edit summary
 
->ArnabSaha
rmv title sponsor
Line 3: Line 3:
{{Use Indian English|date=May 2018}}
{{Use Indian English|date=May 2018}}
{{Infobox station
{{Infobox station
| name = [[File:Kolkata Metro Logo.svg|50px]]    [[File:Kolkata Metro Rail Corporation Logo.svg|40px]]<br>Salt Lake Sector – V<br>সল্টলেক সেক্টর ৫
| name = [[File:Kolkata Metro Logo.svg|50px]]    [[File:Kolkata Metro Rail Corporation Logo.svg|40px]]<br>Salt Lake Sector V
| type = [[Kolkata Metro]] station
| type = [[Kolkata Metro]] station
| other_name = Bandhan Bank Salt Lake Sector V
| style = Kolkata Metro
| style = Kolkata Metro
| image = Under Construction Sector V Metro Station.jpg
| image = Under Construction Sector V Metro Station.jpg
Line 40: Line 41:
| map_type = India Kolkata
| map_type = India Kolkata
| map_size = 300
| map_size = 300
| map_dot_label = Salt Lake Sector-V
| map_dot_label = Bandhan Bank Salt Lake Sector-V
| route_map = {{Kolkata Metro line 2}}{{Kolkata Metro line 6}}
| route_map = {{Kolkata Metro line 2}}{{Kolkata Metro line 6}}
| map_state = collapsed
| map_state = collapsed
}}
}}
'''Salt Lake Sector – V''' is a station of the [[Kolkata Metro]] close to Nabadiganta Industrial Township, [[Salt Lake City, Kolkata]], India. This metro station will be for [[Kolkata Metro Line 2]] and [[Kolkata Metro Line 6]]. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress.<ref>{{cite news|title=Trial runs for new East-West Metro rakes to start in May|url=https://timesofindia.indiatimes.com/city/kolkata/trial-runs-for-new-east-west-metro-rakes-to-start-in-may/articleshow/63572717.cms|newspaper=[[The Times of India ]]}}</ref> The stations of Line 2 and Line 6 will be connected by over-bridge.<ref>{{cite news|title=Tech hub to mass-transit interface|url=https://www.telegraphindia.com/calcutta/tech-hub-to-mass-transit-interfaceoverbridge-to-link-sec-v-stations-201668|newspaper=[[The Telegraph (Calcutta)|The Telegraph]]}}</ref>
'''Salt Lake Sector – V''' (also known as '''Bandhan Bank Salt Lake Sector-V''') is a station of the [[Kolkata Metro]] close to Nabadiganta Industrial Township, [[Salt Lake City, Kolkata]], India. This metro station will be for [[Kolkata Metro Line 2]] and [[Kolkata Metro Line 6]]. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress.<ref>{{cite news|title=Trial runs for new East-West Metro rakes to start in May|url=https://timesofindia.indiatimes.com/city/kolkata/trial-runs-for-new-east-west-metro-rakes-to-start-in-may/articleshow/63572717.cms|newspaper=[[The Times of India ]]}}</ref> The stations of Line 2 and Line 6 will be connected by over-bridge.<ref>{{cite news|title=Tech hub to mass-transit interface|url=https://www.telegraphindia.com/calcutta/tech-hub-to-mass-transit-interfaceoverbridge-to-link-sec-v-stations-201668|newspaper=[[The Telegraph (Calcutta)|The Telegraph]]}}</ref>


== Structure ==
== Structure ==

Revision as of 12:45, 21 July 2021


Salt Lake Sector V
Kolkata Metro station
Sector V, Metro Station
Other namesBandhan Bank Salt Lake Sector V
LocationSector – V, Salt Lake Bidhannagar, Kolkata – 700091
Coordinates22°34′53″N 88°25′47″E / 22.581318°N 88.429822°E / 22.581318; 88.429822
Owned byKolkata Metro Rail Corporation
Operated byMetro Railway, Kolkata
Platforms Line 2   Line 6 
Tracks4
Construction
Structure typeElevated (Line 2)
Elevated (Line 6)
Platform levels2
Disabled accessYes Disabled access
History
Opened13 February 2020; 6 years ago (13 February 2020)[1]
Electrified750V DC
Services
Preceding station   Kolkata Metro   Following station
TerminusLine 2
toward Kavi Subhash
Line 6
toward Biman Bandar
Location
Location within Kolkata

Salt Lake Sector – V (also known as Bandhan Bank Salt Lake Sector-V) is a station of the Kolkata Metro close to Nabadiganta Industrial Township, Salt Lake City, Kolkata, India. This metro station will be for Kolkata Metro Line 2 and Kolkata Metro Line 6. The construction of station for the Line 2 is complete and it has been inaugurated in February 2020 while that of Line 6 is in progress.[2] The stations of Line 2 and Line 6 will be connected by over-bridge.[3]

Structure

 Line 2 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Eastbound Terminus
Westbound Towards ←Karunamoyee← ←
Side platform doors will open on the left Disabled access
L2

 Line 6 

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform doors will open on the left Disabled access
Northbound Towards →Nicco Park→ →
Southbound Towards ← Bidhannagar← ←
Side platform doors will open on the left Disabled access
L2

See also

Island Platform
Two tracks and one island platform

References

  1. ↑ "অবশেষে চলার পথে, ১৩ ফেব্রুয়ারি থেকে শুরু ইস্ট-ওয়েস্ট মেট্রো" (in Bengali). Kolkata: eisamay.indiatimes.com. 3 February 2020. Retrieved 3 February 2020.
  2. ↑ "Trial runs for new East-West Metro rakes to start in May". The Times of India .
  3. ↑ "Tech hub to mass-transit interface". The Telegraph.

External links