>BrownHairedGirl removed Category:2016 establishments in India; added Category:2016 establishments in Karnataka using HotCat |
>Sam2905 Platform 2 changed to Kengeri and infobox changed to platform 2 Kengeri |
||
| Line 4: | Line 4: | ||
{{Use Indian English|date=July 2017}} | {{Use Indian English|date=July 2017}} | ||
{{Infobox station | {{Infobox station | ||
| name | | name = Krantivera Sangolli Rayanna Railway Station | ||
| type | | type = '''[[Namma Metro]]''' '''[[List of Bangalore metro stations|station]]''' | ||
| style | | style = Namma Metro | ||
| image | | image = City Railway Station metro station.jpg | ||
| image_caption | | image_caption = | ||
| address | | address = Tank Bund Road Subhash Nagar, Sevashrama, Bengaluru, [[Karnataka]] 560023 | ||
| coordinates | | coordinates = {{coord|12.975814|77.565708|display=inline,title}} | ||
| line | | line = {{color box|#{{Namma Metro color|Purple}}}} [[Purple Line (Namma Metro)|Purple Line]] | ||
| other | | other = | ||
| structure | | structure = Underground | ||
| platform | | platform = [[Island platform]] | ||
Platform-1 →[[Baiyappanahalli metro station|Baiyappanahalli]] <br />Platform-2 → [[ | Platform-1 →[[Baiyappanahalli metro station|Baiyappanahalli]] <br />Platform-2 → [[Kengeri metro station|Kengeri]] | ||
| operator | | operator = [[Bangalore Metro Rail Corporation Ltd]] (BMRCL) | ||
| depth | | depth = | ||
| levels | | levels = 2 | ||
| tracks | | tracks = 2 | ||
| parking | | parking = | ||
| bicycle | | bicycle = | ||
| baggage_check | | baggage_check = | ||
| connections | | connections = [[Bangalore City railway station]] {{rint|rail|1}} | ||
| opened | | opened = {{start date and age|2016|April|30|df=yes}} | ||
| closed | | closed = | ||
| rebuilt | | rebuilt = | ||
| electrified | | electrified = 750 [[Volt|V]] [[Direct current|DC]] [[third rail]] | ||
| ADA | | ADA = Yes {{access icon}} | ||
| code | | code = | ||
| owned | | owned = [[Namma Metro]] | ||
| architect | | architect = | ||
| architectural_style = | | architectural_style = | ||
| zone | | zone = | ||
| smartcardname | | smartcardname = | ||
| smartcardstatus | | smartcardstatus = | ||
| former | | former = | ||
| passengers | | passengers = | ||
| pass_year | | pass_year = | ||
| pass_rank | | pass_rank = | ||
| pass_percent | | pass_percent = | ||
| pass_system | | pass_system = | ||
| mpassengers | | mpassengers = | ||
| services | | services = {{s-rail|title=Namma Metro}} | ||
{{s-line|system=Namma Metro|line=Purple |previous=Majestic |next=Magadi Road}} | {{s-line|system=Namma Metro|line=Purple |previous=Majestic |next=Magadi Road}} | ||
| map_type | | map_type = India Bangalore#Karnataka#India | ||
| map_caption | | map_caption = Location in Bangalore##Location in Karnataka##Location in India | ||
| map_dot_label | | map_dot_label = City Railway Station | ||
| map_size | | map_size = 300 | ||
| route_map | | route_map = {{BMR Purple Line}} | ||
| map_state | | map_state = collapsed | ||
}} | }} | ||
| Line 74: | Line 74: | ||
|- | |- | ||
|style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{Namma Metro color|Purple}}>'''South West bound'''</span> | |style="border-bottom:solid 1px gray;" width=100|<span style=color:#{{Namma Metro color|Purple}}>'''South West bound'''</span> | ||
| style="border-bottom:solid 1px gray;" width="390" |Platform 2 Toward ← [[ | | style="border-bottom:solid 1px gray;" width="390" |Platform 2 Toward ← [[Kengeri metro station|Kengeri]] | ||
|} | |} | ||
Revision as of 12:07, 1 September 2021
This article includes a list of general references, but it remains largely unverified because it lacks sufficient corresponding inline citations. (July 2017) |
City Railway Station or Krantivira Sangolli Rayanna is an underground metro station on the Purple Line of the Namma Metro serving Subhash Nagar, Sevashrama, Bangalore. It was opened to the public on 30 April 2016.[1]
A foot overbridge connecting the metro station with platform 10 of the Bangalore City railway station was opened on 18 February 2019. The BMRC reported that monthly ridership at the metro station was 175,000 passengers per day prior to opening the bridge, and increased to 250,000 two months after its opening.[2]
Station layout
| G | Street Level | Exit/ Entrance |
| M | Mezzanine | Fare control, station agent, Ticket/token, shops |
| P | Eastbound | Platform 1 → Toward →Baiyappanahalli |
| Island platform, doors will open on the right | ||
| South West bound | Platform 2 Toward ← Kengeri | |
See also
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References
- ↑ "Metro ready but how do we get to the station?". Deccan Herald. Retrieved 13 July 2017.
- ↑ "Bridge linking boosts Bengaluru metro ridership". Deccan Herald. 2 May 2019. Retrieved 4 May 2019.
External links
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
