Benniganahalli metro station

From Bharatpedia, an open encyclopedia
Benniganahalli
Namma Metro station
Location316, Old Madras Rd, next to Salarpuria, Pai Layout, Mahadevapura, Bengaluru, Karnataka 560016
Coordinates12°59′48″N 77°40′06″E / 12.99655°N 77.66828°E / 12.99655; 77.66828Coordinates: 12°59′48″N 77°40′06″E / 12.99655°N 77.66828°E / 12.99655; 77.66828
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s) Purple Line 
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Kengeri
Tracks2
ConnectionsBus interchange Tin Factory Bus stop towards Hebbal or towards Krishnarajapuram
Construction
Structure typeElevated
Platform levels2
Other information
StatusUnder Construction
Station codeTBC
History
Opening22 August 2023; 18 months ago (2023-08-22)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).

Benniganahalli is an upcoming metro station on the east-west corridor of the Purple Line of Namma Metro. Around this station, holds the main Tin Factory Junction leading towards Baiyappanahalli followed by some locations like Benniganahalli Lake, Tin Factory Bus Stop, Royal Heritage Apartments and many more.[1][2]

As per latest updates from BMRCL, the K.R.Puram - Baiyappanahalli along with the Kengeri - Challeghatta trial runs are likely to happen with 6 coaches from August 22, 2023 and are expected to commence operations from end of August 2023.[3][4][5]

Station Layout[edit]

Station Layout - To Be Confirmed

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi) next station is Krishnarajapuram (KR Puram) Change at the next station for  Blue Line 
Platform 2
Westbound
Towards ← Kengeri next station is Baiyappanahalli
Side platform | Doors will open on the left Disabled access
L2

See also[edit]


References[edit]

  1. "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. Retrieved 2022-06-21.
  2. "Bengaluru Metro: Whitefield-Challaghatta Line Opening in August - TimesProperty". timesproperty.com. Retrieved 2023-07-18.
  3. "Trial run on Bengaluru's Baiyappanahalli - KR Puram metro line to begin from August 22: Report". Hindustan Times. Retrieved 2023-07-16.
  4. "Direct Metro Line from Whitefield to Challaghatta: Namma Metro To Start Trials on Missing Links on August 22". TimesNow. Retrieved 2023-07-16.
  5. "Trial runs on two Bengaluru Metro sections will commence on August 22: BMRCL". Moneycontrol. Retrieved 2023-07-16.

External links[edit]

  • BMRCL English - BMRCL Official Website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.

Template:Namma Metro