Created by CourtneySugden
Last edited December 15, 2024

Konanakunte Cross
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station
Konanakunte Cross metro station
Other namesMunireddy Layout
LocationMunireddy Layout, Konanakunte, Bengaluru, Karnataka 560062, India
India
Coordinates12°53′05″N 77°33′10″E / 12.884740962943033°N 77.55289793065505°E / 12.884740962943033; 77.55289793065505
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Green
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
ArchitectNagarjuna Construction Company (NCC)
Other information
StatusStaffed
Station codeAPRC
History
Opened21 January 2021; 5 years ago (2021-01-21)
Electrified750 V DC third rail
Services
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Map

Konanakunte Cross is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Konanakunte area of Bengaluru, India. It was opened to the public on 21 January 2021.[1]

Station layout[edit | edit source]

Konanakunte Cross track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute
Next Station: Doddakallasandra
Platform 1
Northbound
Towards ← Madavara
Next Station: Yelachenahalli
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit | edit source]

There are 2 Entry/Exit points – A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A: Towards Prestige Falcon City side
  • Entry/Exit point B: Towards Siddalingappa Memorial Hospital side

See also[edit | edit source]

References[edit | edit source]

  1. "Namma Metro's 6 km Yelachenahalli to Silk Institute stretch flagged-off". www.moneycontrol.com. Retrieved 6 February 2021.


External links[edit | edit source]