City Railway Station metro station (Bangalore)

From Bharatpedia, an open encyclopedia


Krantivira Sangolli Rayanna Railway Station
Namma Metro station
Krantivira Sangoli Rayanna Railway Station.jpg
Other namesCity Railway Station
LocationTank Bund Road Subhash Nagar, Sevashrama, Bengaluru, Karnataka 560023
Coordinates12°58′33″N 77°33′57″E / 12.975814°N 77.565708°E / 12.975814; 77.565708Coordinates: 12°58′33″N 77°33′57″E / 12.975814°N 77.565708°E / 12.975814; 77.565708
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s) Purple Line 
PlatformsIsland platform
Platform-1 → Baiyappanahalli
Platform-2 → Kengeri
Tracks2
ConnectionsBangalore City railway station Mainline rail interchange
Construction
Structure typeUnderground
Platform levels2
Disabled accessYes Disabled access
Other information
StatusStaffed
Station codeSRCS
History
Opened30 April 2016; 9 years ago (2016-04-30)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Krantivira Sangolli Rayanna Railway Station is located in Bengaluru
Krantivira Sangolli Rayanna Railway Station
Krantivira Sangolli Rayanna Railway Station
Location in Bangalore
Krantivira Sangolli Rayanna Railway Station is located in Karnataka
Krantivira Sangolli Rayanna Railway Station
Krantivira Sangolli Rayanna Railway Station
Location in Karnataka
Krantivira Sangolli Rayanna Railway Station is located in India
Krantivira Sangolli Rayanna Railway Station
Krantivira Sangolli Rayanna Railway Station
Location in India

Krantivira Sangolli Rayanna Railway Station is an underground metro station on the Purple Line of the Namma Metro serving Subhash Nagar, Sevashrama, Bangalore. It was opened to the public on 30 April 2016.[1]

A foot overbridge connecting the metro station with platform 10 of the Bangalore City railway station was opened on 18 February 2019. The BMRC reported that monthly ridership at the metro station was 175,000 passengers per day prior to opening the bridge, and increased to 250,000 two months after its opening.[2]

Station layout[edit]

G Street Level Exit/ Entrance
M Mezzanine Fare control, station agent, Ticket/token, shops
P Eastbound Platform 1 → Towards → Baiyappanahalli next station is Nadaprabhu Kempegowda Stn., Majestic Change at the next station for  Green Line 
Island platform, doors will open on the right Disabled access
South West bound Platform 2 ← Towards ← Kengeri next station is Magadi Road
style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Krantivira Sangolli Rayanna Railway Station track layout
Station with two tracks and one Island platform

See also[edit]


References[edit]

  1. "Metro ready but how do we get to the station?". Deccan Herald. Retrieved 13 July 2017.
  2. "Bridge linking boosts Bengaluru metro ridership". Deccan Herald. 2 May 2019. Retrieved 4 May 2019.

External links[edit]

Template:Namma Metro