Hebbala | |||||
|---|---|---|---|---|---|
| Template:Namma Metro Infobox station line | |||||
| Location | Vayunandana Layout, Hebbal Kempapura, Bengaluru, Karnataka 560024 | ||||
| Coordinates | 13°02′39″N 77°35′34″E / 13.044287°N 77.592666°E | ||||
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||
| Operated by | Namma Metro | ||||
| Line(s) | Template:Rcb - Under Construction Template:Rcb - Approved Template:Rcb - Under Construction | ||||
| Platforms | Side platform (TBC) Platform-1 → Train Terminates Here * Platform-2 → Template:Stl Platform-3 → Template:Stl Platform-4 → Template:Stl Platform-5 → Train Terminates Here Platform-6 → Template:Stl Platform Numbers (TBC) * (Further extension to Template:Stl / Template:Stl in the future) | ||||
| Tracks | 06 (TBC) | ||||
| Connections | • • | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | (TBC) | ||||
| Parking | (TBC) | ||||
| Bicycle facilities | (TBC) | ||||
| Architect | Nagarjuna Constructions Company Ltd. (NCC Ltd). | ||||
| Other information | |||||
| Status | Under Construction Approved Under Construction | ||||
| Station code | (TBC) | ||||
| History | |||||
| Opening | June 2027 (TBC) 2029 (TBC) 2030 (TBC) | ||||
| Electrified | 750 V DC third rail | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station (under Blue Line) is slated to become operational around June 2027.[2][3][4][5][6] This metro station will have 6 platforms totally, for being an interchange of 3 lines - Blue Line, Orange Line and Red Line.
History[edit | edit source]
Blue Line[edit | edit source]
On November 17, 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Hebbala metro station, part of the 11.678 km Reach 2B – Package 2 (Hebbala - Bagalur Cross) of the 37.692 km Blue Line of Namma Metro. On September 14, 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates.[7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.[8]
Station layout[edit | edit source]
Template:Rcb Station Layout - To Be Confirmed
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| Hebbala track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| * Further Extension to Template:Stl in the future | ||||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** Under Construction | ||||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Southbound |
Towards → Train Terminates Here ** Next Station: Kempapura Change at the next station for Template:Rcb | |
| Platform # Northbound |
Towards ← Template:Stl Next Station: Kodigehalli | |
| Side platform | Doors will open on the left | ||
| L2 | Note: | ** To be further extended to Template:Stl / Template:Stl in the future |
Template:Rcb Station Layout - To Be Confirmed
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Hebbala track layout (TBC) | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** Under Construction | ||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Eastbound |
Towards → Template:Stl Change at the next station for Template:Rcb | |
| Platform # Westbound |
Towards ← JP Nagar 4th Phase Next Station: Template:Stl | |
| Side platform | Doors will open on the left | ||
| L2 | ||
Template:Rcb Station Layout - To Be Confirmed
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Hebbala track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** Proposed | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Northbound |
Towards → Train Terminates Here | |
| Platform # Southbound |
Towards ← Template:Stl Next Station: Template:Stl | |
| Side platform | Doors will open on the left | ||
| L2 | ||
See also[edit | edit source]
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References[edit | edit source]
- ↑ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ↑ Bureau, The Hindu (6 March 2026). "₹500 crore for suburban rail, 41 km of metro line to be operational in 2026-27, says Chief Minister". The Hindu. ISSN 0971-751X. Retrieved 14 April 2026.
{{cite news}}:|last=has generic name (help) - ↑ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
- ↑ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
- ↑ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
- ↑ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
- ↑ "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
- ↑ Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.
External links[edit | edit source]
- BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.