JP Nagar 4th Phase | |||||
|---|---|---|---|---|---|
| Template:Namma Metro Infobox station line | |||||
![]() This metro station's final stages before Operations under Namma Metro's Pink Line and the upcoming Orange Line as of April 2026 | |||||
| Location | Outer Ring Road, JP Nagar 4th Phase, Bengaluru, Karnataka 560078 | ||||
| Coordinates | 12°54′35″N 77°36′01″E / 12.909841°N 77.600237°E | ||||
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||
| Operated by | Namma Metro | ||||
| Line(s) | Template:Rcb Template:Rcb | ||||
| Platforms | Side platform Platform-1 → Template:Stl Platform-2 → Template:Stl * * (Further extension to Template:Stl in the future) (TBC) | ||||
| Tracks | 4 (2 Operational under Pink Line and 2 Under Construction under Orange Line) | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 (TBC) | ||||
| Parking | (TBC) | ||||
| Architect | GR Infraprojects Ltd. (Simplex contract terminated in 2021) | ||||
| Other information | |||||
| Status | Final Stages before Operations Approved | ||||
| Station code | (TBC) | ||||
| History | |||||
| Opening | May 2026 2029 (TBC) | ||||
| Electrified | 750 V DC third rail (Pink Line) (TBC) (Orange Line) | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
JP Nagar 4th Phase is an upcoming elevated interchange metro station on the North-South corridor of the Pink Line and the ORR-West corridor of the Orange Line[1] of Namma Metro in Bengaluru, India. This station is located near the popular Vega City Mall and serves the residential areas of BTM Layout and JP Nagar 3rd & 4th Phase. This metro station will also act as the terminal station of the proposed Orange Line under Namma Metro Phase 3.
As per the latest updates, this metro station, under the first phase of Pink Line, covering a total distance of 7.5 km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around May 2026 [2][3][4][5] instead of December 2025.[6][7][8][9][10]
History[edit | edit source]
Pink Line[edit | edit source]
In March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the JP Nagar 4th Phase metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated.[11] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement.[12]
Station layout[edit | edit source]
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| JP Nagar 4th Phase track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
| ||||||||||||||||||||||||||||||||||||||||||
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| JP Nagar 4th Phase track layout ** | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
** (Under Construction) | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Southbound |
Towards → Template:Stl Next Station: Template:Stl | |
| Platform # Northbound |
Towards ← Template:Stl ** Next Station: Template:Stl Change at the next station for Template:Rcb | |
| Island platform | P# & P# doors will open on the left Template:Rcb & Template:Rcb Station Layout & Platform Numbers - (TBC) | ||
| Platform # Southbound |
Towards → Template:Stl Next Station: Template:Stl | |
| Platform # Northbound |
Towards ← Train Terminates Here | |
| Side platform | Doors will open on the left | ||
| L2 | Note: | ** To be further extended to Template:Stl in the future |
Connections[edit | edit source]
This section is empty. You can help by adding to it. (June 2024) |
Entry/Exit[edit | edit source]
This section is empty. You can help by adding to it. (June 2024) |
See also[edit | edit source]
- Bengaluru
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bengaluru Metropolitan Transport Corporation
References[edit | edit source]
- ↑ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
- ↑ Bureau, The Hindu (26 January 2026). "7.5-km stretch of Pink Line metro in Bengaluru to open in May 2026". The Hindu. ISSN 0971-751X. Retrieved 1 March 2026.
{{cite news}}:|last=has generic name (help) - ↑ "Namma Metro Pink Line Opening Delayed: When Will It Finally Open For Bengaluru Residents?". Times Now. 14 May 2025. Retrieved 15 May 2025.
- ↑ B.P, Darshan Devaiah (13 May 2025). "Namma Metro's Pink Line deadline pushed to 2026". The Hindu. ISSN 0971-751X. Retrieved 15 May 2025.
- ↑ "Bengaluru Metro's Reach 6 Line Likely To Be Commissioned In Sept 2026; See Which Areas It Will Connect". Times Now. 13 May 2025. Retrieved 15 May 2025.
- ↑ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
- ↑ "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN 0971-751X. Retrieved 7 August 2024.
- ↑ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
- ↑ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
- ↑ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
- ↑ "Bangalore Metro Terminates Simplex Infra's Pink Line Contract". The Metro Rail Guy. 4 February 2021. Retrieved 29 March 2024.
- ↑ "GR Infra Wins Bangalore Metro Pink Line's Pending Work". The Metro Rail Guy. 16 July 2021. Retrieved 29 March 2024.
External links[edit | edit source]
- Bangalore Metro Rail Corporation Ltd. (Official site)
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
