Agara | |||||
|---|---|---|---|---|---|
| Template:Namma Metro Infobox station line | |||||
![]() Under Construction of this metro station as of March 2025 under Phase 2A of Blue Line of Namma Metro | |||||
| Location | AH45, Agara Village, 1st Sector, HSR Layout, Bengaluru, Karnataka 560034 | ||||
| Coordinates | 12°55′14″N 77°38′37″E / 12.92053°N 77.64359°E | ||||
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||
| Operated by | Namma Metro | ||||
| Line(s) | Template:Rcb Template:Rcb (Under Construction) | ||||
| Platforms | Side platform (TBC) Platform-1 → Template:Stl Platform-2 → Template:Stl / Template:Stl Side platform (TBC) Platform-3 → Template:Stl Platform-4 → Template:Stl Platform Numbers (TBC) | ||||
| Tracks | 2 (TBC) | ||||
| Connections | |||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 (TBC) | ||||
| Parking | (TBC) | ||||
| Other information | |||||
| Status | Under Construction Under Construction | ||||
| Station code | AGRA (TBC) | ||||
| History | |||||
| Opening | December 2026 (TBC) 2030 (TBC) | ||||
| Electrified | (TBC) | ||||
| Services | |||||
|
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. | |||||
| |||||
| Location | |||||
| Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value). | |||||
Agara is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] and proposed Red Line of Namma Metro in Bangalore, India. Around this metro station holds the main Agara, a major suburban area which was operated by the Madras Engineer Groups and was one of the biggest army cantonments during the British Times. This metro station is adjacent to its neighbouring localities like HSR Layout, Koramangala, Outer Ring Road and Varthur. This metro station (under Blue Line) is slated to become operational December 2026 instead of June 2026.[2][3][4][5][6]
History[edit | edit source]
Blue Line[edit | edit source]
In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Agara metro station, part of the 9.859 km Reach 2A – Package 1 section (Central Silk Board – Kodibeesanahalli) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Afcons Infrastructure was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.
Station layout[edit | edit source]
Template:Rcb Station Layout - To Be Confirmed
| style="color:;background:#Template:Rail color;text-align:center;padding:5px"| Agara track layout (TBC) | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||
Station with two tracks and two side platforms
* Under Construction | ** Approved | ||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Eastbound |
Towards → Template:Stl ** Next Station: Ibbalur Change at the next station for Template:Rcb | |
| Platform # Westbound |
Towards ← Template:Stl Next Station: HSR Layout | |
| Side platform | Doors will open on the left | ||
| L2 | Note: | ** To be further extended to Template:Stl in future |
Template:Rcb Station Layout - To Be Confirmed
| style="color:white;background:#Template:Rail color;text-align:center;padding:5px"| Agara track layout (TBC) | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||
Station with two tracks and two side platforms
* Under Construction | ** Approved | ||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Southbound |
Towards → Template:Stl Next Station: Template:Stl Change at the next station for Template:Rcb | |
| Platform # Northbound |
Towards ← Template:Stl Next Station: Template:Stl | |
| Side platform | Doors will open on the left | ||
| L2 | ||
See also[edit | edit source]
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References[edit | edit source]
- ↑ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ↑ "Bengaluru Big Infra Push: How Karnataka Is Planning to Fast Track Namma Metro's Blue Line Construction". www.timesnownews.com. 8 December 2025. Retrieved 9 December 2025.
- ↑ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
- ↑ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
- ↑ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
- ↑ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
- ↑ "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.
External links[edit | edit source]
- BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
