Created by Shaunak88
Last edited April 14, 2026


Veerannapalya
Template:Namma Metro Infobox station line
Under Construction of this metro station under Phase 2B of Namma Metro's Blue Line as of August 2025
LocationService Rd, MS Ramaiah North City, Manayata Tech Park, Nagavara, Bengaluru, Karnataka 560045
Coordinates13°02′28″N 77°37′05″E / 13.04116°N 77.61814°E / 13.04116; 77.61814
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform (TBC)
Platform-1Template:Stl / Template:Stl
Platform-2Template:Stl
Platform numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
ArchitectURC Constructions Pvt. Ltd.
Other information
StatusUnder Construction
Station code(TBC)
History
OpeningDecember 2027; 16 months' time (December 2027) (TBC)
Electrified(TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Veerannapalya is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the Manyata Embassy Business Park, Veerannapalya Area and Nagawara Lake. This metro station is slated to become operational around December 2026.[2][3][4][5]

History[edit | edit source]

On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Veerannapalya metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]

Station layout[edit | edit source]

Template:Rcb Station Layout - To Be Confirmed

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Veerannapalya track layout (TBC)
Station with two tracks and two side platforms
** Under Construction and Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Eastbound
Towards → Template:Stl / Template:Stl
Next Station: Nagawara
Change at the next station for Template:Rcb
Platform #
Westbound
Towards ← Template:Stl / Template:Stl
Next Station: Kempapura
Change at the next station for Template:Rcb
Side platform | Doors will open on the left Disabled access
L2

References[edit | edit source]

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  3. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  4. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  5. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  6. "NCC Wins Bangalore Metro Airport Line's Construction Work". The Metro Rail Guy. 14 September 2021. Retrieved 24 October 2024.
  7. Service, Express News (16 September 2021). "Nagarjuna Construction Company wins bid to build Namma Metro's Airport Line". The New Indian Express. Retrieved 24 October 2024.

Template:Namma Metro