Created by Ilushikpub
Last edited April 10, 2026


Dairy Circle
Template:Namma Metro Infobox station line
Under Construction of this metro station under Namma Metro's Pink Line as of April 2026
LocationLakkasandra, Laljinagar, Wilson Garden, Bengaluru, Karnataka 560030
Coordinates12°56′26″N 77°36′08″E / 12.94045°N 77.60235°E / 12.94045; 77.60235
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb Template:Rcb
PlatformsTemplate:RcbIsland platform (TBC)

Platform-1 → Template:Stl
Platform-2 → Template:Stl
Platform numbers (TBC)
Template:Rcb Platform numbers (TBC)

(TBC)
Tracks2 (TBC)
Construction
Structure typeUnderground, double track
Platform levels2 (TBC)
Parking(TBC)
ArchitectAfcons Infrastructure
Other information
Status  Under Construction
  Under Construction
Station code(TBC)
History
Opening  December 2026; 4 months' time (December 2026) (TBC)
  2030; 4 years' time (2030) (TBC)
Electrified(TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Dairy Circle is an upcoming underground metro station on the North-South corridor of the Pink Line[1] of Namma Metro in Bengaluru, India with plans to make an interchange with the proposed Red Line. This metro station consists of the main Dairy Circle Flyover where to the east leads towards Silk Board junction and Christ University, to the west leads towards NIMHANS Hospital, Indira Gandhi Institute of Child Health Hospital, to the north leads towards Bosch (Bengaluru South Campus), Karnataka Federal Foundation and to the south leads towards Sri Jayadeva Institute of Cardiovascular Sciences and Research, a healthcare institute in South Bengaluru.

As per the latest updates, this metro station, under the second phase (Pink Line), covering the total distance of 13.8 km stretch (Dairy Circle - Nagawara) is expected to be operational around December 2026. [2][3][4][5][6][7]

History[edit | edit source]

Pink Line[edit | edit source]

In June 2017, Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for constructing the Dairy Circle metro station along the 3.66 km South Ramp - National Military School stretch of the 21.25 km Pink Line of Namma Metro. In November 2019, Afcons Infrastructures emerged as the lowest bidders for this stretch which aligned closely with the original estimate, thus leading to a successful award for this company. They commenced the construction of this metro station as per the agreements.

Station layout[edit | edit source]

Template:Rcb Station layout - to be confirmed

style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Dairy Circle track layout (TBC)
P#
P#
Station with two tracks and one Island platform
G Street level Exit/ Entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Southbound
Towards → Template:Stl
Next station: Tavarekere
Island platform | Doors will open on the right Disabled access
Platform #
Northbound
Towards ← Template:Stl
Next station: Lakkasandra
L2

Template:Rcb Station layout - to be confirmed

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Dairy Circle track layout (TBC)
to NIMHANS
P#
P#
to Koramangala II Block
Station with two tracks and one Island platform
G Street level Exit/ entrance
L1 Mezzanine Fare control, station agent, Ticket/token, shops
L2 Platform #
Northbound
Towards → Template:Stl
Next station: NIMHANS
Island platform | Doors will open on the right Disabled access
Platform #
Southbound
Towards ← Sarjapura
Next station: Koramangala 2nd Block
L2

Connections[edit | edit source]

Entry/exit[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. "Namma Metro's Pink line likely to open in phases". The Hindu. 4 August 2024. ISSN 0971-751X. Retrieved 7 August 2024.
  4. "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.

External links[edit | edit source]

  • BMRCL English - BMRCL official website
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations

Template:Namma Metro