Sarasvathi Nagar
Template:Namma Metro Infobox station line
Under Construction of this metro station as of March 2025 under Phase 2A of Blue Line of Namma Metro
LocationNH 44, Badavala Nagar, B Narayanapura, Mahadevapura, Bengaluru, Karnataka 560016
Coordinates12°59′38″N 77°41′08″E / 12.99375°N 77.68559°E / 12.99375; 77.68559
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform (TBC)
Platform-1 → Template:Stl
Platform-2 → Template:Stl / Template:Stl
Platform Numbers (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
ArchitectShankaranarayana Constructions (SNC)
Other information
StatusUnder Construction
Station codeSNS (TBC)
History
OpeningDecember 2026; 4 months' time (December 2026) (TBC)
Electrified(TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Sarasvathi Nagar is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bengaluru, India. This metro station serves mainly Lowry Memorial Educational Institutions, and also a few automotive companies such as Tata Motors, Hyundai, MG (Morris Garages), Renault and Honda Motors. This is a prime location for its neighbouring areas like Krishnarajapura, Mahadevapura and Whitefield. This metro station is slated to become operational December 2026 instead of June 2026.[2][3][4][5][6]

History[edit | edit source]

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Sarasvathi Nagar metro station, part of the 8.377 km Reach 2A – Package 2 (Kodibeesanahalli - Krishnarajapura) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [7] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout[edit | edit source]

Station Layout - To Be Confirmed

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Sarasvathi Nagar track layout (TBC)
P#
P#
Station with two tracks and two side platforms
** Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Template:Stl
Next Station: Bagmane Developers - DRDO Sports Complex
Platform #
Northbound
Towards ← Template:Stl **
Change at the next station for Template:Rcb
Side platform | Doors will open on the left Disabled access
L2 Note: ** To be further extended to Template:Stl in future

See also[edit | edit source]

References[edit | edit source]

  1. "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
  2. "Bengaluru Big Infra Push: How Karnataka Is Planning to Fast Track Namma Metro's Blue Line Construction". www.timesnownews.com. 8 December 2025. Retrieved 9 December 2025.
  3. "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
  4. "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
  5. "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
  6. "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
  7. "Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work". The Metro Rail Guy. 13 October 2020. Retrieved 24 October 2024.