Chikkajala | |||||
|---|---|---|---|---|---|
| Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. station | |||||
![]() Under construction of this metro station as of October 2024 under Phase 2B of Blue Line of Namma Metro | |||||
| Location | Survey No 70/10, A2, Bellary Rd, Chikkajala, Bengaluru, Karnataka 562157 | ||||
| Coordinates | 13°10′09″N 77°37′54″E / 13.16929°N 77.63179°E | ||||
| Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | ||||
| Operated by | Namma Metro | ||||
| Line(s) | Lua error in Module:Adjacent_stations at line 432: Unknown line "Blue". | ||||
| Platforms | Side platform (TBC) Platform-1 → Krishnarajapura / Central Silk Board Platform-2 → KIAL Terminals Platform Numbers (TBC) | ||||
| Tracks | 2 (TBC) | ||||
| Construction | |||||
| Structure type | Elevated, Double track | ||||
| Platform levels | 2 (TBC) | ||||
| Parking | (TBC) | ||||
| Other information | |||||
| Status | Currently axed from Blue Line & converted to Future Station | ||||
| Station code | (TBC) | ||||
| History | |||||
| Opening | (TBC) | ||||
| Electrified | (TBC) | ||||
| Services | |||||
|
Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found. | |||||
| |||||
| Location | |||||
![]() | |||||
Chikkajala is a cancelled elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This metro station will consist of the main Chikkajala village which holds the main Chikkajala Fort Ruins followed by prime locations like Decathlon Anubhava Sports Arena, Chikkajala Police Station and Chikkajala Lake. This metro station will not be operational on June 2026 due to lack of funds.[2][3][4][5]
Station layout[edit | edit source]
Station Layout - To Be Confirmed
Chikkajala track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
**Skipping Bettahalasuru | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform # Northbound |
Towards → KIAL Terminals Next Station: Doddajala | |
| Platform # Southbound |
Towards ← Krishnarajapura / Central Silk Board Next Station: Bagalur Cross (Skipping Bettahalasuru) | |
| Side platform | Doors will open on the left | ||
| L2 | ||
See also[edit | edit source]
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References[edit | edit source]
- ↑ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ↑ Lalitha, S. (16 September 2024). "Chikkajala, Bettahalasur stations axed from Metro Airport Line". The New Indian Express. Retrieved 17 October 2024.
- ↑ Vivan, Sridhar (18 September 2024). "Uncertainty clouds Bettahalsuru, Chikkajala Metro project". Bangalore Mirror. Retrieved 17 October 2024.
- ↑ vinaykumar.patil. "Bengaluru: BMRCL drops two stations on Airport line amid funding shortfall". Asianet News Network Pvt Ltd. Retrieved 17 October 2024.
- ↑ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
External links[edit | edit source]
- BMRCL English - BMRCL Official Website
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.

