Created by Ajay Kumar
Last edited September 1, 2023


Central Silk Board
Template:Namma Metro Infobox station line
LocationOuter Ring Rd, Central Silk Board Colony, Stage 2, BTM Layout, Bengaluru, Karnataka 560068
Coordinates12°54′59″N 77°37′14″E / 12.91652°N 77.62056°E / 12.91652; 77.62056
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb Template:Rcb
PlatformsSide platform
Platform-1Rashtreeya Vidyalaya Road
Platform-2Bommasandra
Side platform (TBC)
Platform-3 - Train Terminates Here
Platform-4 - Krishnarajapuram or KIAL Terminals
Platform numbers (TBC)
Tracks(TBC)
Construction
Structure typeElevated, Double track
Platform levels(TBC)
Parking(TBC)
Disabled access(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
Opening  December 2023; 2 years ago (December 2023) (TBC)
  2026; 0 years ago (2026) (TBC)
Electrified750 V DC third rail (TBC)
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Central Silk Board is an upcoming important elevated interchange metro station on the North-South corridor of the Yellow Line and Blue Line of Namma Metro in Bangalore, India. Around this metro station holds the main Central Silk Board area which leads towards the city, Outer Ring Road (towards Hebbal), Electronic City and Hosur, an industrial city in Tamil Nadu. This metro station (under Yellow Line) is stated to be operational around December 2023 (under Blue Line, around 2026).[1][2][3]

Station layout[edit | edit source]

Station Layout (TBC)

style="color:black;background:#Template:Rail color;text-align:center;padding:5px"|
Central Silk Board track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Bommasandra next station is Bommanahalli
Platform 1
Northbound
Towards ← Rashtreeya Vidyalaya Road next station is BTM Layout
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. "Namma Metro Update: Bengaluru's biggest metro station, Jayadeva junction slated for year-end launch". Financialexpress. 26 July 2023. Retrieved 31 August 2023.
  2. "Namma Metro News: Bengaluru's Biggest Metro Station at Jayadeva Junction Set to Open by Year-End". TimesNow. 25 July 2023. Retrieved 31 August 2023.
  3. Reporter, Staff (24 July 2023). "Bengaluru's Jayadeva Junction: Largest Metro Station Expected to Open by End of 2023". Metro Rail News. Retrieved 31 August 2023.

External links[edit | edit source]

Template:Namma Metro