Bhubaneswar–Anand Vihar Weekly Superfast Express

Revision as of 19:41, 12 July 2021 by imported>Colonies Chris
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

The Bhubaneswar–Anand Vihar Weekly Superfast Express is a Superfast train belonging to East Coast Railway zone that runs between Bhubaneswar and Anand Vihar Terminal in India. It is currently being operated with 22805/22806 train numbers on a weekly basis.[1][2][3]

Bhubaneswar–Anand Vihar Weekly Superfast Express
Overview
Service typeSuperfast
First service9 July 2013; 11 years ago (2013-07-09)
Current operator(s)East Coast Railway zone
Route
StartBhubaneswar (BBS)
Stops16
EndAnand Vihar Terminal (ANVT)
Distance travelled1,885 km (1,171 mi)
Service frequencyWeekly [lower-alpha 1]
Train number(s)22805/22806
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering
E-catering
Observation facilitiesLHB coaches
Entertainment facilitiesNo
Baggage facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed59 km/h (37 mph), including halts

ServiceEdit

The 22805/Bhubaneswar–Anand Vihar Weekly SF Express has an average speed of 59 km/hr and covers 1885 km in 32h 5m. The 22806/Anand Vihar Terminal–Bhubaneswar Weekly SF Express has an average speed of 57 km/hr and covers 1885 km in 33h.

Route and haltsEdit

The important halts of the train are:

Coach compositionEdit

The train has Hybrid-LHB rakes with a max speed of 110 kmph. The train consists of 17 coaches :

  • 1 First AC
  • 2 AC II Tier
  • 4 AC III Tier
  • 8 Sleeper coaches
  • 1 Pantry car
  • 8 General Unreserved
  • 2 Seating cum Luggage Rake

TractionEdit

Both trains are hauled by a Vadodara-based WAP-7 electric locomotive from Bhubaneswar to Anand Vihar Terminal.

Rake sharingEdit

The train shares its rake with 12281/12282 Bhubaneswar–New Delhi Duronto Express.

See alsoEdit

NotesEdit

  1. Runs one day in a week for every direction.

ReferencesEdit

  1. TEMPORARY AUGMENTATION OF TRAINS
  2. "Changes in the New Northern Railway Time Table Effective from 1.10.2015". Northern Railway. 30 September 2015. Retrieved 31 October 2018.
  3. Changes in the New Northern Railway Time Table Effective from 1.10.2015

External linksEdit