→Mumbai Metro Pink Line (Under Construction): sp
>BrownHairedGirl (removed Category:Buildings and structures completed in 1994; added Category:Transport infrastructure completed in 1994 using HotCat) |
imported>DisillusionedBitterAndKnackered |
||
Line 26: | Line 26: | ||
}} | }} | ||
The '''Jogeshwari – Vikhroli Link Road''' ('''JVLR'''), is a {{convert|10.6|km|mi|adj=mid|-long}} 6-lane road with a central median in [[Mumbai]] which connects the [[Western Express Highway]] and [[Eastern Express Highway]] providing speedier access from [[Jogeshwari]] in the [[Western Suburbs (Mumbai)|Western Suburbs]] to [[Vikhroli]] in the [[Eastern Suburbs (Mumbai)|Eastern Suburbs]]. It was opened to traffic in 1994, and widened from 2-lane to 6-lane road in 2012 at a cost of {{INRConvert|221.45|c|year=2012}}. | The '''Jogeshwari – Vikhroli Link Road''' ('''JVLR'''), is a {{convert|10.6|km|mi|adj=mid|-long}} 6-lane road with a central median in [[Mumbai]] which connects the [[Western Express Highway]] and [[Eastern Express Highway]] providing speedier access from [[Jogeshwari]] in the [[Western Suburbs (Mumbai)|Western Suburbs]] to [[Vikhroli]] in the [[Eastern Suburbs (Mumbai)|Eastern Suburbs]]. It was opened to traffic in 1994, and widened from 2-lane to 6-lane road in 2012 at a cost of {{INRConvert|221.45|c|year=2012}}. The Under construction Line 6 of Mumbai Metro is being Constructed on this Link road. | ||
''L&T flyover'' (''Magnetic flyover'') on this road has a [[gravity hill]] effect where vehicles seems to defy the gravity with the [[optical illusion]] of rolling up the slope.<ref name=ultaRd1/><ref name="metrotvnews.com"/> | ''L&T flyover'' (''Magnetic flyover'') on this road has a [[gravity hill]] effect where vehicles seems to defy the gravity with the [[optical illusion]] of rolling up the slope.<ref name=ultaRd1/><ref name="metrotvnews.com"/> | ||
Line 104: | Line 104: | ||
===Phase II=== | ===Phase II=== | ||
The contract for Phase II was put to tender for {{INRConvert|584.4|m}}, and was awarded to Unity Infraprojects Ltd. for {{INRConvert|531.3|m}}. Consulting Engineering Services (I) Pvt. Ltd. were appointed as Project Management Consultants for this phase. The work order for Phase II was issued on 10 February 2005, and construction was originally scheduled to complete in 14 months.<ref name="msrdc1"/> | The contract for Phase II was put to tender for {{INRConvert|584.4|m}}, and was awarded to Unity Infraprojects Ltd. for {{INRConvert|531.3|m}}. Consulting Engineering Services (I) Pvt. Ltd. were appointed as Project Management Consultants for this phase. The work order for Phase II was issued on 10 February 2005, and construction was originally scheduled to complete in 14 months.<ref name="msrdc1"/> | ||
== Mumbai Metro Pink Line (Under Construction) == | |||
As Part of the [[Mumbai Metro]] Master Plan the Under Construction Line 6 ( [[Line 6 (Mumbai Metro)|Pink Line]] ) is being Constructed on the Link road from [[Swami Samarth Nagar (Lokhandwala) metro station|Swami Samarth Nagar]] in [[Lokhandwala Complex]], Andheri to Kanjurmarg seamlessly Connecting the West & East part of Mumbai. It will also have 7 interchanges of which 2 will be with Western & Central lines of [[Mumbai Suburban Railway]] & 5 with Yellow, Red, Aqua, Green & Magenta Line of Mumbai Metro. It is Likely to also serve as extended track for [[Line 3 (Mumbai Metro)|Aqua Line]] of Mumbai Metro for a shared car shed at Kanjurmarg. | |||
== Other == | == Other == |