Created by Ptrnext
Last edited February 10, 2026
UpdateBot (talk | contribs)
robot: Update article (please report if you notice any mistake or error in this edit)
general fix layout after review also and corrected details
 
Line 1: Line 1:
{{Short description|Rapid transit system in India to serve Surat city and surrounding region}}
{{Short description|Rapid transit system in Surat, Gujarat, India}}
{{Use dmy dates|date=July 2018}}
{{Use dmy dates|date=July 2018}}
{{Use Indian English|date=July 2018}}
{{Use Indian English|date=July 2018}}
{{update|date=November 2019}}
{{Infobox public transit
{{Infobox public transit
| name = Surat Metro
| name = Surat Metro
| image =  
| image =  
| caption = GMRC Logo
| caption = GMRC Logo
| imagesize = 100px
| locale = [[Surat]], [[Gujarat]]
| locale = [[Surat]], [[Gujarat]]
| transit_type = [[Rapid Transit]]
| transit_type = [[Rapid Transit]]
| began_operation =  
| began_operation =  
| operation_will_start = December 2023
| operation_will_start = {{start date and age|2027|12||df=y|p=n|br=n}}<ref name="Ops from Dec 2026"/>
<ref>{{Cite web|url=https://www.deshgujarat.com/2021/10/23/surat-metro-rail-will-start-operating-by-december-2023/|title = Surat Metro rail will start operating by December 2023|date = 23 October 2021}}</ref>
| system_length = {{convert|40.35|km}}
| system_length = {{convert|40.35|km}}
| chief_executive =  
| chief_executive =  
Line 17: Line 16:
| lines = 2 (Phase - I)
| lines = 2 (Phase - I)
| stations = 38
| stations = 38
| website =  
| website = {{URL|https://www.gujaratmetrorail.com/|Gujarat Metro}}
| ridership =  
| ridership =  
| train_length = 5 Coach
| character = Elevated & Underground
| stock = [[Titagarh Rail Systems]]<ref>{{Cite web |last=PTI |date=2023-06-27 |title=Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail |url=https://theprint.in/economy/titagarh-rail-systems-bags-rs-857-cr-order-for-surat-metro-rail/1645126/ |access-date=2023-06-29 |website=ThePrint |language=en-US}}</ref>
| vehicles =  
| track_gauge = {{Track gauge|sg|allk=on}}
| track_gauge = {{Track gauge|sg|allk=on}}
| el = 750 V DC [[third rail]]
| el = 750 V DC [[third rail]]
| average_speed =  
| average_speed = 80 km/h<ref name="Ops from Dec 2026"/>
| top_speed =  
| top_speed =  
| operator =  
| operator =  
Line 30: Line 31:
| owner = [[Gujarat Metro Rail Corporation Limited]]
| owner = [[Gujarat Metro Rail Corporation Limited]]
| area served =  
| area served =  
| line_number = 2 (Phase - I)
| line_number = * '''Under Construction:'''<br/>{{rcb|Surat Metro|Red|croute}}<br />{{rcb|Surat Metro|Green|croute}}<ref name="Ops from Dec 2026">{{cite news|last=Gupta|first=Mayank|title=Surat Metro: Phase I to Start Operations in Dec 2026, Check Route, Distance, Stations and More|url=https://www.news18.com/auto/surat-metro-phase-i-to-start-operations-in-dec-2026-check-route-distance-stations-and-more-8310193.html|work=[[News18]]|date=12 July 2023|access-date=12 July 2023|language=en}}</ref>
| start =  
| start =  
| end =  
| end =  
| annual_ridership =  
| annual_ridership =  
| character =
| vehicles =
}}
}}


The '''Surat Metro''' is an under-construction [[rapid transit]] rail system for [[Surat]] in [[Gujarat]] state of India. Two corridors with a combined length of 40.35 kilometers are under construction since 18 January 2021.<ref name=":0">{{Cite web|title='Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat|url=https://www.timesnownews.com/india/article/pm-modi-bhoomi-poojan-ahmedabad-metro-phase-2-surat-metro/708480|access-date=2021-01-18|website=www.timesnownews.com|language=en}}</ref> The project is expected to be completed by December 2023 at an estimated cost of {{INRconvert|12020.32|c}}.<ref>{{Cite web|date=2021-10-23|title=Surat Metro rail will start operating by December 2023|url=https://www.deshgujarat.com/2021/10/23/surat-metro-rail-will-start-operating-by-december-2023/|access-date=2021-10-24|website=DeshGujarat|language=en-US}}</ref>
'''Surat Metro''' is an under-construction [[rapid transit]] system for the city of [[Surat]] in [[Gujarat]] state of [[India]]. Two corridors with a combined length of 40.35 kilometers are under construction since 18 January 2021.<ref name=":0">{{Cite web|title='Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat|url=https://www.timesnownews.com/india/article/pm-modi-bhoomi-poojan-ahmedabad-metro-phase-2-surat-metro/708480|access-date=2021-01-18|website=www.timesnownews.com|date=18 January 2021 |language=en}}</ref> The project is expected to be completed by December 2026 at an estimated cost of {{INRconvert|12020.32|c}}.<ref name="Ops from Dec 2026">{{cite news|last=Gupta|first=Mayank|title=Surat Metro: Phase I to Start Operations in Dec 2026, Check Route, Distance, Stations and More|url=https://www.news18.com/auto/surat-metro-phase-i-to-start-operations-in-dec-2029-check-route-distance-stations-and-more-8310193.html|work=[[News18]]|date=12 July 2023|access-date=12 July 2023|language=en}}</ref>


==History==
==History==
In August 2012, the [[Surat Municipal Corporation]] (SMC) proposed four rail routes for the metro project.<ref>[http://www.dnaindia.com/india/report_smc-to-check-feasibility-of-four-metro-routes_1723024 "SMC to check feasibility of four Metro routes"]. DNA India. 2 August 2012. Retrieved 7 August 2012.</ref><ref name=StateApproval>{{cite web|url=http://deshgujarat.com/2012/08/11/narendra-modi-announces-states-aproval-to-surat-metro-train-project/|title=Narendra Modi announces state's approval to Surat Metro train project|publisher=DeshGujarat.com|date=11 August 2012|access-date=1 January 2013}}</ref> The [[Government of Gujarat]] approved two corridors in January 2017.
[[File:Surat Metro under construction pillars.jpg|thumb|Under construction pillars of Green Line near L P Savani School Station|left]]
 
In August 2012, the [[Surat Municipal Corporation]] (SMC) proposed four rail routes for the metro project.<ref>[http://www.dnaindia.com/india/report_smc-to-check-feasibility-of-four-metro-routes_1723024 "SMC to check feasibility of four Metro routes"]. DNA India. 2 August 2012. Retrieved 7 August 2012.</ref><ref name=StateApproval>{{cite web|url=http://deshgujarat.com/2012/08/11/narendra-modi-announces-states-aproval-to-surat-metro-train-project/|title=Narendra Modi announces state's approval to Surat Metro train project|publisher=DeshGujarat.com|date=11 August 2012|access-date=1 January 2013}}</ref> The [[Government of Gujarat]] approved two corridors in January 2017.<ref>{{Cite web |date=2024-05-02 |title=Surat Metro Route Map, Station List, and Latest Updates - Infra Info Hub |url=https://infrainfohub.com/surat-metro/ |access-date=2024-06-05 |language=en-US}}</ref>
The union government approved the project on 11 March 2019.<ref>{{Cite web|url=http://news.railanalysis.com/surat-2-metro-rail-project-approved-by-central-government/|title=DPR approved by Union govt|access-date=2019-03-11}}</ref> It will be implemented by [[Gujarat Metro Rail Corporation Limited]] and it will be financed mainly through equity from [[Government of India]] and [[Government of Gujarat]] on 50:50 basis and loan from bilateral/ multilateral agencies.<ref>{{Cite web|url=https://www.timesnownews.com/amp/business-economy/industry/article/surat-to-get-two-metro-rail-corridors-check-details/379888#referrer=https%3A%2F%2Fwww.google.com&amp_tf=From%20%251%24s|title=Surat metro will have 2 corridors|access-date=10 March 2019 }}</ref> [[French Development Agency|AFD]] has committed to lend 250 million euros for the project, which was signed on January 28, 2021.<ref>{{Cite web|title=AFD to Lend €250 million for Surat Metro Phase 1 Project|url=https://themetrorailguy.com/2020/05/01/afd-to-lend-e250-million-for-surat-metro-phase-1-project/|date=2020-05-01|website=The Metro Rail Guy|language=en-US|access-date=2020-05-02}}</ref> On 9 March 2019, the Public Investment Board (PIB) approved {{INRconvert|12000|c}} for the project.<ref>{{Cite web|url=https://www.metrorailnews.in/pib-approves-surat-metro-rail-project-dpr/|title=PIB has approved the DPR of Surat Metro|access-date=2019-03-08}}</ref> On 17 December 2021, Germany Development Bank [[KfW]] and Government of India signed a €442.26 million loan pact towards the project.<ref>{{Cite news|url=https://economictimes.indiatimes.com/industry/transportation/railways/india-germany-development-bank-sign-442-26-mn-loan-pact-for-surat-metro-rail-project/articleshow/88346447.cms|title=India, Germany Development Bank sign 442.26 mn loan pact for Surat Metro Rail Project|newspaper=The Economic Times|access-date=17 December 2021}}</ref>
 
In June 2020, the construction bids were invited for Phase-1.<ref>{{cite web |url=https://www.urbantransportnews.com/first-construction-bids-invited-for-phase-1-corridor-of-surat-metro-project/ |title=First Construction bids invited for phase 1 corridor of Surat Metro project |website=www.urbantransportnews.com |url-status=dead |archive-url=https://web.archive.org/web/20200607155200/https://www.urbantransportnews.com/first-construction-bids-invited-for-phase-1-corridor-of-surat-metro-project/ |archive-date=2020-06-07}} </ref>
 
The foundation of the project was laid on 18 January 2021 by Indian Prime Minister [[Narendra Modi]].<ref>{{Cite web|url=https://indianexpress.com/article/cities/ahmedabad/ahmedabad-surat-metro-projects-pm-modi-7137374/lite/|title = PM Modi to lay foundation stone of Ahmedabad, Surat metro projects on Jan 18|date = 7 January 2021}}</ref><ref name=":0" /> Construction is expected to complete by early 2024.<ref>{{Cite web|url=https://www.livemint.com/news/india/pm-modi-launches-ahmedabad-and-surat-metro-rail-projects-everything-you-need-to-know-11610956526405.html|title = 'Very important gifts for Surat, Ahmedabad': Modi launches 2 metro rail projects|date = 18 January 2021}}</ref>
 
==Route Network==
The corridors are from [[Sarthana]], [[Varachha]] to  ({{convert|22|km|mi|adj=on}}) and from [[Bhesan, Surat|Bhesan]] Depot to [[Saroli, Surat|Saroli]] ({{convert|18|km|mi|adj=on}}). [[Sarthana]]-[[DREAM City]] corridor will have 20 stations and Bhesan Depot-Saroli corridor will have 18 stations. Out of approved {{convert|40|km|mi|adj=on}} corridor, {{convert|33|km|mi|adj=on}} will be elevated, whereas {{convert|7|km|mi|adj=on}} will be underground.
 
In Phase 1, 20 metro stations will be built on first corridor from [[Sarthana]] to [[DREAM City]] route and 18 metro stations will be built on second corridor from [[Bhesan, Surat|Bhesan]] to Saroli.<ref>{{Cite web|url=https://themetrorailguy.com/surat-metro-information-route-maps-fares-tenders-updates/|title=Surat Metro – Information, Route Maps, Fares, Tenders & Updates|website=The Metro Rail Guy|language=en-US|access-date=2020-03-28}}</ref>
 
===Line 1 (Sarthana - DREAM City)===
Length: 21.61&nbsp;km


Alignment: Elevated (15.14&nbsp;km) & Underground (6.47&nbsp;km)
The union government approved the project on 11 March 2019.<ref name="DPR approved by Union govt">{{Cite web|url=http://news.railanalysis.com/surat-2-metro-rail-project-approved-by-central-government/|title=DPR approved by Union govt|access-date=2019-03-11}}</ref> It will be implemented by [[Gujarat Metro Rail Corporation Limited]] and financed mainly through equity from [[Government of India]] and [[Government of Gujarat]] on 50:50 basis and loan from bilateral/ multilateral agencies.<ref>{{Cite web|url=https://www.timesnownews.com/business-economy/industry/article/surat-to-get-two-metro-rail-corridors-check-details/379888|title=Surat metro will have 2 corridors|access-date=10 March 2019 }}</ref> French development agency [[French Development Agency|AFD]] has committed to lend 250 million euros for the project, which was signed on January 28, 2021.<ref>{{Cite web|title=AFD to Lend €250 million for Surat Metro Phase 1 Project|url=https://themetrorailguy.com/2020/05/01/afd-to-lend-e250-million-for-surat-metro-phase-1-project/|date=2020-05-01|website=The Metro Rail Guy|language=en-US|access-date=2020-05-02}}</ref> On 9 March 2019, the Public Investment Board (PIB) approved {{INRconvert|12000|c}} for the project.<ref name="metrorailnews.in">{{Cite web|url=https://www.metrorailnews.in/pib-approves-surat-metro-rail-project-dpr/|title=PIB has approved the DPR of Surat Metro|date=7 March 2019 |access-date=2019-03-08}}</ref> On 17 December 2021, Germany Development Bank [[KfW]] and Government of India signed a €442.26 million loan pact towards the project.<ref>{{Cite news|url=https://economictimes.indiatimes.com/industry/transportation/railways/india-germany-development-bank-sign-442-26-mn-loan-pact-for-surat-metro-rail-project/articleshow/88346447.cms|title=India, Germany Development Bank sign 442.26 mn loan pact for Surat Metro Rail Project|newspaper=The Economic Times|access-date=17 December 2021}}</ref>


No. of Stations: 20
In June 2020, the construction bids were invited for Phase-1.<ref name="ref1">{{cite web |url=https://www.urbantransportnews.com/first-construction-bids-invited-for-phase-1-corridor-of-surat-metro-project/ |title=First Construction bids invited for phase 1 corridor of Surat Metro project |website=www.urbantransportnews.com |url-status=dead |archive-url=https://web.archive.org/web/20200607155200/https://www.urbantransportnews.com/first-construction-bids-invited-for-phase-1-corridor-of-surat-metro-project/ |archive-date=2020-06-07}}</ref>


Stations:
The foundation of the project was laid on 18 January 2021 by [[Prime Minister of India|Prime Minister]] [[Narendra Modi]].<ref>{{Cite web|url=https://indianexpress.com/article/cities/ahmedabad/ahmedabad-surat-metro-projects-pm-modi-7137374/lite/|title = PM Modi to lay foundation stone of Ahmedabad, Surat metro projects on Jan 18|date = 7 January 2021}}</ref><ref name=":0" /> Construction was expected to be completed by the end of 2024.<ref>{{Cite web|url=https://www.livemint.com/news/india/pm-modi-launches-ahmedabad-and-surat-metro-rail-projects-everything-you-need-to-know-11610956526405.html|title = 'Very important gifts for Surat, Ahmedabad': Modi launches 2 metro rail projects|date = 18 January 2021}}</ref> However, as of July 2023, the deadline for the completion of the first phase has been rescheduled to December 2027, due to some slowdowns and delays in work.<ref name="Ops from Dec 2027">{{cite news|last=Gupta|first=Mayank|title=Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More|url=https://www.news18.com/auto/surat-metro-phase-i-to-start-operations-in-dec-2027-check-route-distance-stations-and-more-8310193.html|work=[[News18]]|date=12 July 2023|access-date=12 July 2023|language=en}}</ref>
* Sarthana
* Nature Park
* Varachha Chopati Garden
* Shri Swaminarayan Mandir Kalakunj
* Kapodra
* Labheshwar Chowk
* Central Warehouse
* [[Surat Railway Station]]
* Maskati Hospital
* Gandhi Baug
* Kadarsha Ni Nal
* Majura Gate (Interchange to Line 2)
* Rupali Canal
* Althan Tenament
* Althan Gam
* VIP Road
* Woman ITI
* Bhimrad
* Convention Center
* DREAM City


===Line 2 (Bhesan - Saroli)===
==Route network==
Length: 18.74&nbsp;km
=== Phase 1 ===
The corridors are from [[Sarthana]], [[Varachha]] to [[DREAM City]] ({{convert|22|km|mi|adj=on}}) and from [[Bhesan, Surat|Bhesan]] Depot to [[Saroli, Surat|Saroli]] ({{convert|18|km|mi|adj=on}}). Sarthana-DREAM City corridor will have 20 stations and Bhesan - Saroli corridor will have 18 stations. Out of approved {{convert|40|km|mi|adj=on}} corridor, {{convert|33|km|mi|adj=on}} will be elevated, whereas {{convert|7|km|mi|adj=on}} will be underground.


Alignment: Elevated
In Phase 1, 20 metro stations will be built on first corridor from Sarthana to DREAM City route ([[Red Line (Surat Metro)|Red Line]]) and 18 metro stations will be built on second corridor from Bhesan to Saroli ([[Green Line (Surat Metro)|Green Line]]).<ref>{{Cite web|url=https://themetrorailguy.com/surat-metro-information-route-maps-fares-tenders-updates/|title=Surat Metro – Information, Route Maps, Fares, Tenders & Updates|website=The Metro Rail Guy|language=en-US|access-date=2020-03-28}}</ref><ref name="Ops from Dec 2027"/>


No. of Stations: 18
{| class="wikitable"
!Line Name
! colspan="2" |Terminals
!Length
!Stations
|-
|style="background:#{{rcr|Surat Metro|Red}}; text-align: center;"|'''[[Red Line (Surat Metro)|<span style="color:white;">Red Line</span>]]'''
|Sarthana
|DREAM City
|21.61&nbsp;km
|20
|-
|style="background:#{{rcr|Surat Metro|Green}}; text-align: center;"|'''[[Green Line (Surat Metro)|<span style="color:white;">Green Line</span>]]'''
|Bhesan
|Saroli
|18.74&nbsp;km
|18
|-
!colspan="3" |'''Total'''
!40.35&nbsp;km
!38
|}


Stations:
==Status updates==
* Bhesan
* '''9 March 2019:''' Public Investment Board (PIB) approves 12,000 Crores INR Surat Metro rail project.<ref name="metrorailnews.in"/>
* Botanical Garden
* '''11 March 2019:''' Surat metro rail project approved by central govt with combined length of 40.35&nbsp;km.<ref name="DPR approved by Union govt"/>
* Ugat Vaarigruh
*'''28 April 2020''': GMRC invited tenders for Detailed Design Consultancy Services for Corridor 1 and 2.<ref>{{Cite web|url=https://themetrorailguy.com/2020/04/28/gmrc-invites-ddc-bids-for-surat-metro-phase-1s-elevated-section/|title=GMRC Invites DDC Bids for Surat Metro Phase 1's Elevated Section|date=2020-04-28|website=The Metro Rail Guy|language=en-US|access-date=2020-04-28}}</ref>
* Palanpur Road
*'''30 April 2020''': GMRC invited Expression of Interest for Phase 1's General Engineering Consultant<ref>{{Cite web|title=GMRC Invites EOI for Surat Metro's General Engineering Consultant|url=https://themetrorailguy.com/2020/05/01/gmrc-invites-eoi-for-surat-metros-general-engineering-consultant/|date=2020-05-01|website=The Metro Rail Guy|language=en-US|access-date=2020-05-02}}</ref>
* LP Savani School
* '''Jun 2020''': Construction bids invited for Phase-1. Construction work to begin soon.<ref name="ref1"/>
* Performing Art Centre
* '''18 Jan 2021''': Prime Minister Narendra Modi laid down foundation stone of Surat Metro. Construction is expected to complete by late 2027.<ref>{{Cite web |last= |first= |date=2021-01-18 |title='Very important gifts for Surat, Ahmedabad': Modi launches 2 metro rail projects |url=https://www.livemint.com/news/india/pm-modi-launches-ahmedabad-and-surat-metro-rail-projects-everything-you-need-to-know-11610956526405.html |access-date=2024-02-14 |website=mint |language=en}}</ref>
* Adajan Gam
* Jagdishchandra Bose Aquarium
* Badri Narayan Temple
* Athwa Chopati
* Majura Gate (Interchange to Line 1)
* Udhna Dawaja
* Kamela Darwaja
* Anjana Farm
* Model Town
* Magob
* Bharat Cancer Hospital
* Saroli


==See also==
==See also==
*[[Urban rail transit in India]]
* [[Urban rail transit in India]]
*[[Ahmedabad Metro]]
** [[Gujarat Metro Rail Corporation Limited]]
*[[List of tourist attractions in Surat]]
*** [[Ahmedabad Metro]]


==References==
==References==
Line 120: Line 96:
{{Surat topics}}
{{Surat topics}}
{{Rapid transit in India}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}


{{coord missing|Gujarat}}
{{coord missing|Gujarat}}
Line 126: Line 103:
[[Category:Transport in Surat]]
[[Category:Transport in Surat]]
[[Category:Rail transport in Gujarat]]
[[Category:Rail transport in Gujarat]]
[[Category:Standard gauge railways in India]]
[[Category:Buildings and structures in Surat]]
[[Category:Standard-gauge railways in India]]
[[Category:Surat Metro|Surat Metro stations]]

Latest revision as of 09:28, 10 February 2026


Surat Metro
Overview
OwnerGujarat Metro Rail Corporation Limited
LocaleSurat, Gujarat
Transit typeRapid Transit
Number of lines2 (Phase - I)
Line number
Number of stations38
WebsiteGujarat Metro
Operation
Operation will startDecember 2027; 1 years' time (2027-12)[1]
CharacterElevated & Underground
Rolling stockTitagarh Rail Systems[2]
Technical
System length40.35 kilometres (25.07 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Average speed80 km/h[1]

Surat Metro is an under-construction rapid transit system for the city of Surat in Gujarat state of India. Two corridors with a combined length of 40.35 kilometers are under construction since 18 January 2021.[3] The project is expected to be completed by December 2026 at an estimated cost of 12,020.32 crore (US$1.7 billion).[1]

History[edit | edit source]

Under construction pillars of Green Line near L P Savani School Station

In August 2012, the Surat Municipal Corporation (SMC) proposed four rail routes for the metro project.[4][5] The Government of Gujarat approved two corridors in January 2017.[6]

The union government approved the project on 11 March 2019.[7] It will be implemented by Gujarat Metro Rail Corporation Limited and financed mainly through equity from Government of India and Government of Gujarat on 50:50 basis and loan from bilateral/ multilateral agencies.[8] French development agency AFD has committed to lend 250 million euros for the project, which was signed on January 28, 2021.[9] On 9 March 2019, the Public Investment Board (PIB) approved 12,000 crore (US$1.7 billion) for the project.[10] On 17 December 2021, Germany Development Bank KfW and Government of India signed a €442.26 million loan pact towards the project.[11]

In June 2020, the construction bids were invited for Phase-1.[12]

The foundation of the project was laid on 18 January 2021 by Prime Minister Narendra Modi.[13][3] Construction was expected to be completed by the end of 2024.[14] However, as of July 2023, the deadline for the completion of the first phase has been rescheduled to December 2027, due to some slowdowns and delays in work.[15]

Route network[edit | edit source]

Phase 1[edit | edit source]

The corridors are from Sarthana, Varachha to DREAM City (22-kilometre (14 mi)) and from Bhesan Depot to Saroli (18-kilometre (11 mi)). Sarthana-DREAM City corridor will have 20 stations and Bhesan - Saroli corridor will have 18 stations. Out of approved 40-kilometre (25 mi) corridor, 33-kilometre (21 mi) will be elevated, whereas 7-kilometre (4.3 mi) will be underground.

In Phase 1, 20 metro stations will be built on first corridor from Sarthana to DREAM City route (Red Line) and 18 metro stations will be built on second corridor from Bhesan to Saroli (Green Line).[16][15]

Line Name Terminals Length Stations
style="background:#Template:Rcr; text-align: center;"|Red Line Sarthana DREAM City 21.61 km 20
style="background:#Template:Rcr; text-align: center;"|Green Line Bhesan Saroli 18.74 km 18
Total 40.35 km 38

Status updates[edit | edit source]

  • 9 March 2019: Public Investment Board (PIB) approves 12,000 Crores INR Surat Metro rail project.[10]
  • 11 March 2019: Surat metro rail project approved by central govt with combined length of 40.35 km.[7]
  • 28 April 2020: GMRC invited tenders for Detailed Design Consultancy Services for Corridor 1 and 2.[17]
  • 30 April 2020: GMRC invited Expression of Interest for Phase 1's General Engineering Consultant[18]
  • Jun 2020: Construction bids invited for Phase-1. Construction work to begin soon.[12]
  • 18 Jan 2021: Prime Minister Narendra Modi laid down foundation stone of Surat Metro. Construction is expected to complete by late 2027.[19]

See also[edit | edit source]

References[edit | edit source]

  1. 1.0 1.1 1.2 1.3 Gupta, Mayank (12 July 2023). "Surat Metro: Phase I to Start Operations in Dec 2026, Check Route, Distance, Stations and More". News18. Retrieved 12 July 2023. Cite error: Invalid <ref> tag; name "Ops from Dec 2026" defined multiple times with different content
  2. PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 29 June 2023.
  3. 3.0 3.1 "'Very important gifts for Ahmedabad, Surat': PM Modi launches metro rail projects in Gujarat". www.timesnownews.com. 18 January 2021. Retrieved 18 January 2021.
  4. "SMC to check feasibility of four Metro routes". DNA India. 2 August 2012. Retrieved 7 August 2012.
  5. "Narendra Modi announces state's approval to Surat Metro train project". DeshGujarat.com. 11 August 2012. Retrieved 1 January 2013.
  6. "Surat Metro Route Map, Station List, and Latest Updates - Infra Info Hub". 2 May 2024. Retrieved 5 June 2024.
  7. 7.0 7.1 "DPR approved by Union govt". Retrieved 11 March 2019.
  8. "Surat metro will have 2 corridors". Retrieved 10 March 2019.
  9. "AFD to Lend €250 million for Surat Metro Phase 1 Project". The Metro Rail Guy. 1 May 2020. Retrieved 2 May 2020.
  10. 10.0 10.1 "PIB has approved the DPR of Surat Metro". 7 March 2019. Retrieved 8 March 2019.
  11. "India, Germany Development Bank sign 442.26 mn loan pact for Surat Metro Rail Project". The Economic Times. Retrieved 17 December 2021.
  12. 12.0 12.1 "First Construction bids invited for phase 1 corridor of Surat Metro project". www.urbantransportnews.com. Archived from the original on 7 June 2020.
  13. "PM Modi to lay foundation stone of Ahmedabad, Surat metro projects on Jan 18". 7 January 2021.
  14. "'Very important gifts for Surat, Ahmedabad': Modi launches 2 metro rail projects". 18 January 2021.
  15. 15.0 15.1 Gupta, Mayank (12 July 2023). "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". News18. Retrieved 12 July 2023.
  16. "Surat Metro – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 28 March 2020.
  17. "GMRC Invites DDC Bids for Surat Metro Phase 1's Elevated Section". The Metro Rail Guy. 28 April 2020. Retrieved 28 April 2020.
  18. "GMRC Invites EOI for Surat Metro's General Engineering Consultant". The Metro Rail Guy. 1 May 2020. Retrieved 2 May 2020.
  19. "'Very important gifts for Surat, Ahmedabad': Modi launches 2 metro rail projects". mint. 18 January 2021. Retrieved 14 February 2024.