The Green Line (Line 2) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, Gujarat, India. This line consists of 20 metro stations from Bhesan to Saroli with a total distance of 18.74 km. It is expected to be operational by December 2027.[2][3]

Green Line
Overview
StatusUnder construction
LocaleSurat, Gujarat, India
TerminiBhesan
Saroli
Stations18
Service
TypeRapid transit
SystemSurat Metro
Operator(s)Gujarat Metro Rail Corporation Limited
Rolling stockTitagarh Rail Systems[1]
Technical
Line length18.74 km (11.64 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 32 km/h (20 mph) (average)
Route map
Template:Surat Metro Green Line Route

List of stationsEdit

Following is a list of stations on this route:

colspan="8" style="background:#Template:Rcr;" | Green Line
# Station Name Opening Connections Layout
English Gujarati
1 Bhesan ભેસાણ Under construction None Elevated
2 Botanical Garden બોટનિકલ ગાર્ડન Under construction None Elevated
3 Ugat Varigruh ઉગત વરિગૃહ Under construction None Elevated
4 Palanpur Road પાલનપુર રોડ Under construction None Elevated
5 LP Savani School એલ.પી.સવાણી સ્કૂલ Under construction None Elevated
6 Performing Art Centre પર્ફોર્મિંગ આર્ટ સેન્ટર Under construction None Elevated
7 Adajan Gam અડાજણ ગામ Under construction None Elevated
8 Jagdishchandra Bose Aquarium જગદીશચંદ્ર બોસ એક્વેરિયમ Under construction None Elevated
9 Badri Narayan Temple બદરી નારાયણ મંદિર Under construction None Elevated
10 Athwa Chopati અઠવા ચોપાટી Under construction None Elevated
11 Majura Gate મજુરા ગેટ Under construction Template:Rcb (Under construction) Elevated
12 Udhna Darwaja ઉધના દરવાજા Under construction None Elevated
13 Kamela Darwaja કમેલા દરવાજા Under construction None Elevated
14 Anjana Farm અંજના ફાર્મ Under construction None Elevated
15 Model Town મોડલ ટાઉન Under construction None Elevated
16 Magob મગોબ Under construction None Elevated
17 Bharat Cancer Hospital ભારત કેન્સર હોસ્પિટલ Under construction None Elevated
18 Saroli સારોલી Under construction None Elevated

See alsoEdit

ReferencesEdit

  1. PTI. "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
  2. "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. Retrieved 5 September 2023.
  3. "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. Retrieved 5 September 2023.