| Red Line | |||
|---|---|---|---|
| Overview | |||
| Status | Under construction | ||
| Locale | Surat, Gujarat, India | ||
| Termini | Sarthana DREAM City | ||
| Stations | 20 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Surat Metro | ||
| Operator(s) | Gujarat Metro Rail Corporation Limited | ||
| Rolling stock | Titagarh Rail Systems[1] | ||
| Technical | |||
| Line length | 21.61 km (13.43 mi) | ||
| Character | Elevated & Underground | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 750 V DC third rail | ||
| Operating speed |
| ||
| |||
The Red Line (Line 1) is an under-construction metro rail line of the Surat Metro, a rapid transit system in Surat, Gujarat, India. This line consists of 20 metro stations from Sarthana to DREAM City with a total distance of 21.61 km (Elevated (15.14 km) & Underground (6.47 )). It is expected to be operational by December 2027.[2][3]
List of stations[edit | edit source]
Following is a list of stations on this route:
| colspan="8" style="background:#Template:Rcr;" | Red Line | |||||
|---|---|---|---|---|---|
| # | Station Name | Opening | Connections | Layout | |
| English | Gujarati | ||||
| 1 | Sarthana | સરથાણા | Under construction | None | Elevated |
| 2 | Nature Park | નેચર પાર્ક | Under construction | None | Elevated |
| 3 | Varachha Chopati Garden | વરાછા ચોપાટી ગાર્ડન | Under construction | None | Elevated |
| 4 | Shri Swaminarayan Mandir Kalakunj | શ્રી સ્વામિનારાયણ મંદિર કલાકુંજ | Under construction | None | Elevated |
| 5 | Kapodra | કાપોદ્રા | Under construction | None | Underground |
| 6 | Labheshwar Chowk | લાભેશ્વર ચોક | Under construction | None | Underground |
| 7 | Central Warehouse | સેન્ટ્રલ વેરહાઉસ | Under construction | None | Underground |
| 8 | Surat Railway Station | સુરત રેલ્વે સ્ટેશન | Under construction | Surat railway station | Underground |
| 9 | Maskati Hospital | મસ્કતી હોસ્પિટલ | Under construction | None | Underground |
| 10 | Gandhi Baug | ગાંધીબાગ | Under construction | None | Underground |
| 11 | Kadarsha Ni Nal | કાદરશા ની નલ | Under construction | None | Elevated |
| 12 | Majura Gate | મજુરા ગેટ | Under construction | Template:Rcb (Under construction) | Elevated |
| 13 | Rupali Canal | રૂપાલી કેનાલ | Under construction | None | Elevated |
| 14 | Althan Tenament | અલથાણ ટેનામેન્ટ | Under construction | None | Elevated |
| 15 | Althan Gam | અલથાણ ગામ | Under construction | None | Elevated |
| 16 | VIP Road | વી.આઈ.પી રોડ | Under construction | None | Elevated |
| 17 | Woman ITI | વુમન આઈ.ટી.આઈ | Under construction | None | Elevated |
| 18 | Bhimrad | ભીમરાડ | Under construction | None | Elevated |
| 19 | Convention Center | કન્વેન્શન સેન્ટર | Under construction | None | Elevated |
| 20 | DREAM City | ડ્રીમ સિટી | Under construction | None | Elevated |
See also[edit | edit source]
References[edit | edit source]
- ↑ PTI (27 June 2023). "Titagarh Rail Systems bags Rs 857 cr order for Surat Metro Rail". ThePrint. Retrieved 27 June 2023.
- ↑ "Surat Metro phase I to start operations in December 2027 – Check route, distance and stations here". www.financialexpress.com. 13 July 2023. Retrieved 5 September 2023.
- ↑ "Surat Metro: Phase I to Start Operations in Dec 2027, Check Route, Distance, Stations and More". www.news18.com. 12 July 2023. Retrieved 5 September 2023.