Pink Line (Delhi Metro): Difference between revisions

Created by Dhruv edits
Last edited March 29, 2026
UpdateBot (talk | contribs)
robot: Update article (please report if you notice any mistake or error in this edit)
formatting fix
 
Line 1: Line 1:
{{Short description|Line of the Delhi Metro system}}
{{Short description|Line on the Delhi Metro system}}
{{Use Indian English|date=January 2016}}
{{Use Indian English|date=January 2016}}
{{Use dmy dates|date=January 2016}}
{{Use dmy dates|date=January 2016}}
Line 5: Line 5:
| color                          = {{rail color|Delhi Metro|Pink}}
| color                          = {{rail color|Delhi Metro|Pink}}
| box_width                      =  
| box_width                      =  
| name                            = Pink Line <br> (Line 7)
| name                            = Pink Line (Line 7)
| image                          = The rear of a Hyundai-Rotem coach of Delhi Metro's Pink Line at Anand Vihar metro station.jpg
| image                          = The rear of a Hyundai-Rotem coach of Delhi Metro's Pink Line at Anand Vihar metro station.jpg
| caption                        = Pink Line near Anand Vihar Station
| caption                        = Pink Line near Anand Vihar Station
Line 12: Line 12:
| status                          = Operational
| status                          = Operational
| locale                          = [[Delhi]]
| locale                          = [[Delhi]]
| start                          = [[Majlis Park metro station|Majlis Park]]
| start                          = [[Maujpur - Babarpur metro station|Maujpur-Babarpur]]
| end                            = [[Shiv Vihar metro station|Shiv Vihar]]
| end                            = [[Shiv Vihar metro station|Shiv Vihar]]
| stations                        = [[List of Delhi metro stations|38]]
| stations                        = [[List of Delhi metro stations|46]]
| daily_ridership                =  
| daily_ridership                =  
| open                            = *14 March 2018 ([[Majlis Park metro station|Majlis Park]] – [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]])
| open                            = {{indented plainlist|
*14 March 2018 ([[Majlis Park metro station|Majlis Park]] – [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]])
*6 August 2018 ([[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]] – [[Lajpat Nagar metro station|Lajpat Nagar]])
*6 August 2018 ([[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]] – [[Lajpat Nagar metro station|Lajpat Nagar]])
*31 October 2018 ([[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] – [[Shiv Vihar metro station|Shiv Vihar]])
*31 October 2018 ([[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] – [[Shiv Vihar metro station|Shiv Vihar]])
*31 December 2018 ([[Lajpat Nagar metro station|Lajpat Nagar]] – [[Mayur Vihar Pocket I]])
*31 December 2018 ([[Lajpat Nagar metro station|Lajpat Nagar]] – [[Shree Ram Mandir Mayur Vihar metro station|Shree Ram Mandir Mayur Vihar]])
*6 August 2021 ([[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] – [[Mayur Vihar Pocket I metro station|Mayur Vihar Pocket I]])
*6 August 2021 ([[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] – [[Shree Ram Mandir Mayur Vihar metro station|Shree Ram Mandir Mayur Vihar]])
*8 March 2026 ([[Majlis Park metro station|Majlis Park]] – [[Maujpur - Babarpur metro station|Maujpur-Babarpur]])
}}
| close                          =  
| close                          =  
| owner                          = [[Delhi Metro]]
| owner                          = [[Delhi Metro]]
Line 26: Line 29:
| character                      = Underground and Elevated
| character                      = Underground and Elevated
| stock                          = Hyundai-ROTEM
| stock                          = Hyundai-ROTEM
| linelength                      = {{convert|59.24|km|mi|abbr=on }}
| linelength                      = {{convert|73.49|km|mi|abbr=on }}
| tracklength                    =  
| tracklength                    =  
| tracks                          =  
| tracks                          =  
| gauge                          = [[Standard gauge]]
| gauge                          = {{track gauge|sg|allk=on}}
| electrification                = 25 kV, 50&nbsp;Hz [[alternating current|AC]] [[Overhead catenary]]
| electrification                = {{25 kV 50 Hz|conductor=overhead}}
| speed                          =  
| speed                          =  
| elevation                      =  
| elevation                      =  
Line 37: Line 40:
}}
}}


The '''Pink Line (Line 7)''' is a metro rail line of the [[Delhi Metro]], a [[rapid transit]] system in [[Delhi]], [[India]].<ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/delhi/metro-comes-to-ne-delhi-but-it-wont-be-straight-line/articleshow/66421712.cms|title=Metro comes to north-east Delhi, but it won't be straight line| website=[[Times of India]]}}</ref> It consists of [[List of Delhi metro stations|38 metro stations]] from [[Majlis Park metro station|Majlis Park]] to [[Shiv Vihar metro station|Shiv Vihar]], both in North Delhi.
The '''Pink Line (Line 7)''' is a line of the [[Delhi Metro]], a [[rapid transit]] system in [[Delhi]], [[India]].<ref>{{Cite news |url=https://timesofindia.indiatimes.com/city/delhi/metro-comes-to-ne-delhi-but-it-wont-be-straight-line/articleshow/66421712.cms |title=Metro comes to north-east Delhi, but it won't be straight line | website=[[Times of India]] |date=30 October 2018 }}</ref> It consists of [[List of Delhi metro stations|46 stations]] between [[Maujpur - Babarpur metro station|Maujpur - Babarpur]] via [[Majlis Park metro station|Majlis Park]] and [[Shiv Vihar metro station|Shiv Vihar]] and, at {{convert|73.49|km|mi}}, is the Delhi Metro's — and India's — longest metro line. The Pink Line is India's first operational ring metro. It is also known as the Ring Road Line, as it mostly passes alongside the city's [[Inner Ring Road, Delhi|Inner Ring Road]].<ref name = "Delhi Metro - Phase 3 Challenges" />{{rp|86}}


The Pink Line, with a length of {{convert|59.24|km|mi}}, is the longest individual line in Delhi Metro, breaking the record set by the operational [[Blue Line (Delhi Metro)|Blue Line]] (excluding branch line). It is mostly elevated and covers Delhi in an almost 'U' shaped pattern. The Pink Line is also known as the Ring Road Line, as the entire line passes alongside the busy [[Inner Ring Road, Delhi|Ring Road]] in Delhi, that witnesses massive traffic jams every day.
The Pink Line has interchanges with most of the operational lines of the network, such as the [[Magenta Line (Delhi Metro)|Magenta Line]] at [[Majlis Park metro station|Majlis Park]], [[Red Line (Delhi Metro)|Red Line]] at [[Netaji Subhash Place metro station|Netaji Subhash Place]] & [[Welcome metro station|Welcome]], [[Yellow Line (Delhi Metro)|Yellow Line]] at [[Azadpur metro station|Azadpur]] & [[Dilli Haat - INA metro station|Dilli Haat - INA]], [[Green Line (Delhi Metro)|Green Line]] at [[Punjabi Bagh West metro station|Punjabi Bagh West]], [[Blue Line (Delhi Metro)|Blue Line]] at [[Rajouri Garden metro station|Rajouri Garden]], [[Mayur Vihar-I metro station|Mayur Vihar Phase-I]], [[Anand Vihar metro station|Anand Vihar]] & [[Karkarduma metro station|Karkarduma]], [[Dhaula Kuan metro station|Dhaula Kuan]] of [[Delhi Airport Metro Express|Airport Express (Orange Line)]] at [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]], [[Violet Line (Delhi Metro)|Violet Line]] at [[Lajpat Nagar metro station|Lajpat Nagar]], as well as with [[Hazrat Nizamuddin Railway Station|Hazrat Nizamuddin]] and [[Anand Vihar Railway Terminal|Anand Vihar Terminal]] (Indian Railways / Namo Bharat) and the [[Inter State Bus Terminals|ISBT]]s at [[Swami Vivekanand Inter State Bus Terminus|Anand Vihar]] and [[Sarai Kale Khan Inter-State Bus Terminus|Sarai Kale Khan]].


The Pink Line has interchanges with most of the operational lines of the network such as the [[Red Line (Delhi Metro)|Red Line]] at [[Netaji Subhash Place metro station|Netaji Subhash Place]] & [[Welcome metro station|Welcome]], [[Yellow Line (Delhi Metro)|Yellow Line]] at [[Azadpur metro station|Azadpur]] & [[Dilli Haat - INA metro station|Dilli Haat - INA]], [[Green Line (Delhi Metro)|Green Line]] at [[Punjabi Bagh West metro station|Punjabi Bagh West]], [[Blue Line (Delhi Metro)|Blue Line]] at [[Rajouri Garden metro station|Rajouri Garden]], [[Mayur Vihar-I metro station|Mayur Vihar Phase-I]], [[Anand Vihar metro station|Anand Vihar]] & [[Karkarduma metro station|Karkarduma]], [[Dhaula Kuan metro station|Dhaula Kuan]] of [[Delhi Airport Metro Express|Airport Express (Orange Line)]] at [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]], [[Violet Line (Delhi Metro)|Violet Line]] at [[Lajpat Nagar metro station|Lajpat Nagar]], as well as with [[Hazrat Nizamuddin Railway Station|Hazrat Nizamuddin]] and [[Anand Vihar Railway Terminal|Anand Vihar Terminal]] (Indian Railways) and the [[Inter State Bus Terminals|ISBT]]s at [[Swami Vivekanand Inter State Bus Terminus|Anand Vihar]] and [[Sarai Kale Khan Inter-State Bus Terminus|Sarai Kale Khan]].
The Pink Line has the highest point above ground on the Delhi Metro at [[Dhaula Kuan]] with a height of {{Convert|23.6|m}}, passing over the Dhaula Kuan grade separator flyovers and the [[Delhi Airport Metro Express|Airport Express Line]].<ref>{{cite web|url=http://indianexpress.com/article/cities/delhi/new-high-for-metro-with-track-at-24m/|title=New high for Metro with track at 24m|date=26 September 2014|work=The Indian Express}}</ref> It possesses the country's smallest metro station, [[Ashram metro station|Ashram]], with a size of just {{Convert|151.6|m}} against the usual {{Convert|265|m}}.<ref name = "Delhi Metro - Phase 3 Challenges">{{cite book |last=Dayal |first=Anuj |author-link= |date=5 April 2018 |title=Delhi Metro - Phase 3 Challenges |location=New Delhi |publisher=Delhi Metro Rail Corporation}}</ref>{{rp|93}} The usual platform length for a six-coach train on this route is {{Convert|140|m|4=0}} but it has been reduced to {{Convert|135|m}} in Ashram station.


The Pink Line has the highest point of Delhi Metro at [[Dhaula Kuan]] with a height of 23.6 metres, passing over the Dhaula Kuan grade separator flyovers and the [[Delhi Airport Metro Express|Airport Express Line]].<ref>{{cite web|url=http://indianexpress.com/article/cities/delhi/new-high-for-metro-with-track-at-24m/|title=New high for Metro with track at 24m|date=26 September 2014|work=The Indian Express}}</ref> It also possesses the country's smallest metro station, [[Ashram metro station|Ashram]], with a size of just 151.6 metres against the usual 265 metres. Also, the platform for a six-coach train is 140 metres but has been reduced to 135 metres in the Ashram station.
A feeder line from Shiv Vihar has separate services; passengers have to change platforms to continue on the main route.<ref>{{Cite web |date=2023-11-05 |title=First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief |url=https://www.timesnownews.com/delhi/first-section-of-delhi-metro-phase-iv-to-open-by-july-2024-says-dmrc-chief-article-104978294 |access-date=2023-11-24 |website=TimesNow |language=en}}</ref>


The line will be extended to [[Maujpur - Babarpur metro station|Maujpur - Babarpur]], creating one of the world's longest [[Ring line|ring lines]] in the city. The Maujpur - Babarpur to Shiv Vihar section will then act as a branch line. The extension is expected to be completed by November 2024.<ref>{{Cite web |date=14 June 2022 |title=Delhi: Covid, green concerns put Phase-IV in low gear; push targets back |url=https://timesofindia.indiatimes.com/city/delhi/delhi-covid-green-concerns-put-phase-iv-in-low-gear-push-targets-back/articleshow/92190010.cms |access-date=16 June 2022 |website=The Times of India |language=en}}</ref>
== History ==
The line was initially put on table as a metro route that would run almost along the Delhi's busy Ring Road, on the lines of the existing Delhi Circular Railway. A route length of {{convert|59.24|km|mi}}<ref>{{Cite web|title=Delhi Metro Map|url=http://www.delhimetrorail.com/Zoom_Map.aspx|access-date=2021-08-06|website=www.delhimetrorail.com}}</ref> was proposed from Majlis Park to Shiv Vihar, that would cut through all the existing lines at various interchanges as part of Phase 3's expansion plans.


== History ==
Currently, there are 46 stations in the Pink Line, out of which 34 are elevated and 12 are underground.
The total length of the line is {{convert|59.24|km|mi}}.<ref>{{Cite web|title=Delhi Metro Map|url=http://www.delhimetrorail.com/Zoom_Map.aspx|url-status=live|access-date=2021-08-06|website=www.delhimetrorail.com}}</ref> There are 38 stations in the Pink Line, out of which 26 are elevated and 12 are underground.


The line was opened in five stages from March 2018 to August 2021. The first section on the Pink Line become operational from 14 March 2018 between [[Majlis Park metro station|Majlis Park]] to [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]], thereafter the section between [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]] and [[Lajpat Nagar metro station|Lajpat Nagar]] was opened on 6 August 2018, Shiv Vihar to Trilokpuri was opened on 31 October 2018. The section between [[Lajpat Nagar metro station|Lajpat Nagar]] to [[Mayur Vihar Pocket I metro station|Mayur Vihar Pocket I]] was opened on 31 December 2018.
The line was opened in stages from 2018 to 2026. The first section on the Pink Line become operational from 14 March 2018 between [[Majlis Park metro station|Majlis Park]] to [[Durgabai Deshmukh South Campus metro station|Durgabai Deshmukh South Campus]], it was then extended to [[Lajpat Nagar metro station|Lajpat Nagar]] on 6 August 2018. A separate section between Shiv Vihar to Trilokpuri-Sanjay Lake was opened on 31 October 2018 and the initial section was extended to [[Shree Ram Mandir Mayur Vihar]] (formerly known as Mayur Vihar Pocket-1) on 31 December 2018.


The section between [[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] and [[Mayur Vihar Pocket I metro station|Mayur Vihar Pocket I]] was not completed as construction of a 1.5&nbsp;km viaduct began late due to land acquisition issues at Trilokpuri.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/delhi/missing-link-at-mayur-vihar-1-in-metros-longest-line-finally-set-to-be-bridged/articleshow/64022099.cms|title=Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged {{!}} Delhi News - Times of India|last1=May 4|first1=Sidharatha Roy {{!}} TNN {{!}} Updated|last2=2018|website=The Times of India|language=en|access-date=2019-05-28|last3=Ist|first3=10:08}}</ref> This had rendered the Pink Line into two independent lines. Hence, trains from Majlis Park would go until Mayur Vihar Pocket 1, while trains coming from Shiv Vihar would terminate at either IP Extension or Trilokpuri Sanjay Lake.
The section between [[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] and [[Shree Ram Mandir Mayur Vihar]] was not completed as construction of a {{Cvt|1.5|km}} viaduct began late due to land acquisition issues at Trilokpuri.<ref>{{Cite web|url=https://timesofindia.indiatimes.com/city/delhi/missing-link-at-mayur-vihar-1-in-metros-longest-line-finally-set-to-be-bridged/articleshow/64022099.cms|title=Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged |date=May 4, 2018|first=Sidharatha |last=Roy |website=The Times of India|language=en|access-date=2019-05-28}}</ref> This had rendered the Pink Line into two independent lines and forced DMRC to convert the Shree Ram Mandir Mayur Vihar (formerly known as Mayur Vihar Pocket-1) station into a terminating station with reversal facilities so that trains from Majlis Park would terminate there. On the eastern section, trains would run in separate loops - Shiv Vihar to Maujpur-Babarpur, Maujpur-Babarpur to IP Extension/Trilokpuri-Sanjay Lake. Every third train from Maujpur-Babarpur would move beyond IP Extension to Trilokpuri-Sanjay Lake as the latter has no reversal facilities and single line movement took place in that section. Both disjoint sections were finally bridged on 6 August 2021.<ref>{{Cite news|date=2021-08-06|title=Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/Delhi/delhi-metro-pink-lines-trilokpuri-sanjay-lake-mayur-vihar-pocket-1-stretch-inaugurated/article35759836.ece|access-date=2021-08-06|issn=0971-751X}}</ref>


The final section between [[Trilokpuri Sanjay Lake metro station|Trilokpuri Sanjay Lake]] and [[Mayur Vihar Pocket I metro station|Mayur Vihar Pocket I]] was opened on 6 August 2021.<ref>{{Cite news|others=Special Correspondent|date=2021-08-06|title=Delhi Metro Pink Line’s Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated|language=en-IN|work=The Hindu|url=https://www.thehindu.com/news/cities/Delhi/delhi-metro-pink-lines-trilokpuri-sanjay-lake-mayur-vihar-pocket-1-stretch-inaugurated/article35759836.ece|access-date=2021-08-06|issn=0971-751X}}</ref>
In December 2024, trial runs were initiated on the Phase 4 extension from Majlis Park to Jagatpur Village stations which were gradually done till Sonia Vihar and finally Maujpur-Babarpur by August 2025. The [[Majlis Park metro station|Majlis Park]] to [[Maujpur - Babarpur metro station|Maujpur - Babarpur]] stretch was opened on 8 March 2026, making this line India’s first ring metro line.


== Stations ==
== Stations ==
Line 64: Line 67:
! rowspan="2" |#
! rowspan="2" |#
! colspan="2" |Station Name
! colspan="2" |Station Name
! rowspan="2" |Phase
! rowspan="2" |Opened
! rowspan="2" |Opening
! rowspan="2" |Interchange Connection
! rowspan="2" |Interchange Connection
! rowspan="2" |Station Layout
! rowspan="2" |Station Layout
! rowspan="2" |Platform Layout
! rowspan="2" |Platform Layout
! rowspan="2" |Depot Connection
! rowspan="2" |Depot Layout
|-
|-
!English
!English
Line 76: Line 76:
|-
|-
|1
|1
|'''{{metro|Maujpur - Babarpur}}'''
|{{stl|Delhi Metro|Maujpur - Babarpur}}
|'''मौजपुर - बाबरपुर'''
|मौजपुर - बाबरपुर
|4
|8 March 2026
|2024
|{{rcb|Delhi Metro|Pink|croute}}
|{{color box|#{{rail color|Delhi Metro|Pink}}; font-size:100%|<span style="color:white;">'''Pink Line'''</span>}} <br/>'''(Phase 4 - Under Construction)'''
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|2||'''{{metro|Yamuna Vihar}}'''
|2||{{stl|Delhi Metro|Yamuna Vihar}}
|'''यमुना विहार'''
|यमुना विहार
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|3||'''{{metro|Bhajanpura}}'''
|3||{{stl|Delhi Metro|Bhajanpura}}
|'''भजनपुरा'''
|भजनपुरा
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|4||'''{{metro|Khajuri Khas}}'''
|4||{{stl|Delhi Metro|Khajuri Khas}}
|'''खजूरी ख़ास'''
|खजूरी ख़ास
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|5
|5
|'''{{metro|Sonia Vihar}}'''
|{{stl|Delhi Metro|Nanaksar Sonia Vihar}}<ref>{{Cite web |date=2026-02-23 |title=2 Delhi Metro stations renamed, 7 names modified |url=https://www.hindustantimes.com/cities/delhi-news/2-delhi-metro-stations-renamed-7-names-modified-101771783245653.html |access-date=2026-03-12 |website=Hindustan Times |language=en}}</ref>
|'''सोनिया विहार'''
|नानकसर सोनिया विहार
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|6
|6
|'''[[Wazirabad Surghat metro station|Soorghat]]'''
|Soorghat
|'''सूरघाट'''
|सूरघाट
|4
|2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|7||'''{{metro|Jagatpur Village}}'''
|7||{{stl|Delhi Metro|Wazirabad}}
|'''जगतपुर गांव'''
|जगतपुर - वज़ीराबाद
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|8
|8
|'''{{metro|Jharoda Majra}}'''
|{{stl|Delhi Metro|Jharoda Majra}}
|'''झड़ौदा माजरा'''
|झड़ौदा माजरा
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|9||'''{{metro|Burari}}'''
|9||{{stl|Delhi Metro|Burari}}
|'''बुराड़ी'''
|बुराड़ी
|4
|8 March 2026
|2024
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|10
|10
|'''{{metro|Majlis Park}}'''
|{{stl|Delhi Metro|Majlis Park}}
|'''मजलिस पार्क'''
|मजलिस पार्क
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|magenta}}; font-size:100%|[[Magenta Line (Delhi Metro)|<span style="color:white;">'''Magenta Line'''</span>]]}} <br/>'''(Phase 4 - Under Construction)'''
|{{rcb|Delhi Metro|Magenta|croute}}
|Elevated
|Elevated
|Side
|Side
|'''Mukundpur Depot'''
|At Grade
|-
|-
|11
|11
|'''{{metro|Azadpur}}'''
|{{stl|Delhi Metro|Azadpur}}
|'''आज़ादपुर'''
|आज़ादपुर
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|yellow}}; font-size:100%|[[Yellow Line (Delhi Metro)|<span style="color:Black;">'''Yellow Line'''</span>]]}} <br/>{{color box|#{{rail color|Delhi Metro|magenta}}; font-size:100%|[[Magenta Line (Delhi Metro)|<span style="color:white;">'''Magenta Line'''</span>]]}} <br/>'''(Phase 4 - Under Construction)'''
|{{rcb|Delhi Metro|Yellow|croute}} <br/>{{rcb|Delhi Metro|Magenta|croute}}<br/>(Phase 4 - Under Construction)
|Underground
|Underground
|Island
|Island
|None
|None
|-
|-
|12||'''{{metro|Shalimar Bagh}}'''||'''शालीमार बाग़'''
|12||{{stl|Delhi Metro|Shalimar Bagh}}||शालीमार बाग़||14 March 2018
|3||14 March 2018
|None
|None
|Underground
|Underground
|Island
|Island
|None
|None
|-
|-
|13
|13
|'''{{metro|Netaji Subhash Place}}'''
|{{stl|Delhi Metro|Netaji Subhash Place}}
|'''नेताजी सुभाष प्लेस'''
|नेताजी सुभाष प्लेस
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|red}}; font-size:100%|[[Red Line (Delhi Metro)|<span style="color:white;">'''Red Line'''</span>]]}}
|{{rcb|Delhi Metro|Red|croute}}
|Underground
|Underground
|Side
|Side
|None
|None
|-
|-
|14||'''{{metro|Shakurpur}}'''||'''शकूरपुर'''
|14||{{stl|Delhi Metro|Shakurpur}}||शकूरपुर||14 March 2018
|3||14 March 2018
|None
|None
|Elevated
|Elevated
|Island
|Island
|None
|None
|-
|-
|15
|15
|'''{{metro|Punjabi Bagh West}}'''
|{{stl|Delhi Metro|Punjabi Bagh West}}
|'''पंजाबी बाग़ पश्चिम'''
|पंजाबी बाग़ पश्चिम
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|Green}}; font-size:100%|[[Green Line (Delhi Metro)|<span style="color:white;">'''Green Line'''</span>]]}}<br/>
|{{rcb|Delhi Metro|Green|croute}}<br/>
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|16||'''{{metro|ESI - Basaidarapur}}'''
|16||{{stl|Delhi Metro|Bali Nagar}}
|'''ईएसआई - बसईदारापुर'''
|ईएसआई - बसईदारापुर
|3
|14 March 2018
|14 March 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|17
|17
|'''{{metro|Rajouri Garden}}'''
|{{stl|Delhi Metro|Rajouri Garden}}
|'''राजौरी गार्डन'''
|राजौरी गार्डन
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|blue}}; font-size:100%|[[Blue Line (Delhi Metro)|<span style="color:white;">'''Blue Line'''</span>]]}}
|{{rcb|Delhi Metro|Blue|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|18||'''{{metro|Mayapuri}}'''||'''मायापुरी'''
|18||{{stl|Delhi Metro|Mayapuri Chowk}}||मायापुरी||14 March 2018
|3||14 March 2018
|None
|None
|Elevated
|Elevated
| Side
| Side
|None
|None
|-
|-
|19||'''{{metro|Naraina Vihar}}'''||'''नारायणा विहार'''
|19||{{stl|Delhi Metro|Naraina}}||नारायणा||14 March 2018
|3||14 March 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|20||'''{{metro|Delhi Cantonment}}'''||'''दिल्ली छावनी'''
|20||{{stl|Delhi Metro|North Delhi Cantonment}}||दिल्ली छावनी||14 March 2018
|3||14 March 2018
|None
|None
|Elevated
|Elevated
| Side
| Side
|None
|None
|-
|-
|21
|21
|'''{{metro|Durgabai Deshmukh South Campus}}'''
|{{stl|Delhi Metro|Durgabai Deshmukh South Campus}}
|'''दुर्गाबाई देशमुख साउथ कैम्पस'''
|दुर्गाबाई देशमुख साउथ कैम्पस
|3
|14 March 2018
|14 March 2018
|{{color box|#{{rail color|Delhi Metro|Airport}}; font-size:100%|[[Delhi Airport Metro Express|<span style="color:white;">'''Airport Express'''</span>]]}}
|{{rcb|Delhi Metro|Airport Express|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|22||'''[[Sir Vishweshwaraiah Moti Bagh metro station|Sir M. Vishweshwaraiah Moti Bagh]]'''||'''सर एम. विश्वेश्वरय्या मोती बाग़'''
|22||{{metro|Sir Vishweshwaraiah Moti Bagh||Sir M. Vishweshwaraiah Moti Bagh}}||सर एम. विश्वेश्वरय्या मोती बाग़||6 August 2018
|3||6 August 2018
|None
|None
|Elevated
|Elevated
| Side
| Side
|None
|None
|-
|-
|23||'''{{metro|Bhikaji Cama Place}}'''||'''भीकाजी कामा प्लेस'''
|23||{{stl|Delhi Metro|Bhikaji Cama Place}}||भीकाजी कामा प्लेस||6 August 2018
|3||6 August 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|24||'''{{metro|Sarojini Nagar}}'''||'''सरोजिनी नगर'''
|24||{{stl|Delhi Metro|Sarojini Nagar}}||सरोजिनी नगर||6 August 2018
|3||6 August 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|25
|25
|'''{{metro|Dilli Haat - INA}}'''
|{{stl|Delhi Metro|INA}}
|'''दिल्ली हाट - आईएनए'''
|दिल्ली हाट - आईएनए
|3
|6 August 2018
|6 August 2018
|{{color box|#{{rail color|Delhi Metro|yellow}}; font-size:100%|[[Yellow Line (Delhi Metro)|<span style="color:Black;">'''Yellow Line'''</span>]]}}
|{{rcb|Delhi Metro|Yellow|croute}}
|Underground
|Underground
|Island
|Island
|None
|None
|-
|-
|26||'''{{metro|South Extension}}'''||'''साउथ एक्सटेंशन'''
|26||{{stl|Delhi Metro|South Extension}}||साउथ एक्सटेंशन||6 August 2018
|3||6 August 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|27
|27
|'''{{metro|Lajpat Nagar}}'''
|{{stl|Delhi Metro|Lajpat Nagar}}
|'''लाजपत नगर'''
|लाजपत नगर
|3
|6 August 2018
|6 August 2018
|{{color box|#{{rail color|Delhi Metro|violet}}; font-size:100%|[[Violet Line (Delhi Metro)|<span style="color:white;">'''Violet Line'''</span>]]}}
|{{rcb|Delhi Metro|Violet|croute}}<br/>{{rcb|Delhi Metro|Golden|croute}}<br/>(Phase 4 - Under Construction)
|Underground
|Underground
|Island
|Island
|None
|None
|-
|-
|28||'''{{metro|Vinobapuri}}'''||'''विनोबापुरी'''
|28||{{stl|Delhi Metro|Vinobapuri}}||विनोबापुरी||31 December 2018
|3||31 December 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|29||'''{{metro|Ashram}}'''|| आश्रम |'''आश्रम'''
|29||{{stl|Delhi Metro|Ashram}}|| आश्रम |आश्रम|| 2018 June |31 December 2018
|3|| 2018 June |31 December 2018
|None
|None
|Underground
|Underground
| Island
| Island
|None
|None
|-
|-
|30||'''{{metro|Sarai Kale Khan - Nizamuddin}}'''||'''सराय काले ख़ान - निज़ामुद्दीन'''
|30||{{stl|Delhi Metro|Sarai Kale Khan Nizamuddin}}||सराय काले ख़ान निज़ामुद्दीन||31 December 2018
|3||31 December 2018
| [[File:NCRTC logo.png|25px]] {{stl|RapidX|Sarai Kale Khan}}<br/>{{ric|Indian Railways}} [[Hazrat Nizamuddin railway station|Hazrat Nizamuddin]] <br/>{{rint|bus}} [[Sarai Kale Khan Inter-State Bus Terminus|Sarai Kale Khan ISBT]]
|'''[[Hazrat Nizamuddin railway station]]''' <br/>'''[[Sarai Kale Khan Inter-State Bus Terminus|Sarai Kale Khan ISBT]]'''
|Underground
|Underground
|Island
|Island
|None
|None
|-
|-
|31
|31
|'''{{metro|Mayur Vihar-I}}'''
|{{stl|Delhi Metro|Mayur Vihar-I}}
|'''मयूर विहार-1'''
|मयूर विहार-I
|3
|31 December 2018
|31 December 2018
|{{color box|#{{rail color|Delhi Metro|blue}}; font-size:100%|[[Blue Line (Delhi Metro)|<span style="color:white;">'''Blue Line'''</span>]]}}
|{{rcb|Delhi Metro|Blue|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|32||'''{{metro|Mayur Vihar Pocket I}}'''||'''मयूर विहार पॉकेट 1'''
|32||{{stl|Delhi Metro|Shree Ram Mandir Mayur Vihar}}||श्री राम मंदिर मयूर विहार||31 December 2018
|3||31 December 2018
|None
|None
| Elevated
| Elevated
|Side
|Side
|None
|None
|-
|-
|33||'''{{metro|Trilokpuri Sanjay Lake}}'''|| त्रिलोकपुरी संजय झील |'''त्रिलोकपुरी संजय झील'''
|33||{{stl|Delhi Metro|Trilokpuri}}|| त्रिलोकपुरी |त्रिलोकपुरी–संजय लेक
|3
|31 October 2018||None
|31 October 2018||None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|34||'''{{metro|East Vinod Nagar - Mayur Vihar-II}}'''
|34||{{stl|Delhi Metro|Mayur Vihar-II}}
|'''पूर्वी विनोद नगर - मयूर विहार-2'''
|ईस्ट विनोद नगर–मयूर विहार-II
|3
|31 October 2018
|31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|35||'''{{metro|Mandawali - West Vinod Nagar}}'''
|35||{{stl|Delhi Metro|Mandawali}}
|'''मंडावली - वेस्ट विनोद नगर'''
|मंडावली - वेस्ट विनोद नगर
|3
|31 October 2018
|31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|36||'''{{metro|IP Extension}}'''||'''आईपी एक्सटेंशन'''
|36||{{stl|Delhi Metro|IP Extension}}||आईपी एक्सटेंशन||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|'''Vinod Nagar - Ghazipur Depot'''
|At Grade
Elevated
|-
|-
|37
|37
|'''{{metro|Anand Vihar}}'''
|{{stl|Delhi Metro|Anand Vihar}}
|'''आनंद विहार'''
|आनंद विहार
|3
|31 October 2018
|31 October 2018
|{{color box|#{{rail color|Delhi Metro|blue}}; font-size:100%|[[Blue Line (Delhi Metro)|<span style="color:white;">'''Blue Line'''</span>]]}} <br/>'''[[Anand Vihar Terminal railway station|Anand Vihar railway station]]''' <br/>'''[[Swami Vivekanand Inter State Bus Terminus|Anand Vihar ISBT]]'''
|{{rcb|Delhi Metro|Blue|croute}} <br/> [[File:NCRTC logo.png|25px]] [[File:A02 Anand Vihar RRTS station (capsule).svg|25px]] {{stl|RapidX|Anand Vihar}}<br/>{{ric|Indian Railways}} [[Anand Vihar Terminal railway station|Anand Vihar Terminal]]<br/>{{rint|bus}} [[Swami Vivekanand Inter State Bus Terminus|Anand Vihar ISBT]]
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|38
|38
|'''{{metro|Karkarduma}}'''
|{{stl|Delhi Metro|Karkarduma}}
|'''कड़कड़डूमा'''
|कड़कड़डूमा
|3
|31 October 2018
|31 October 2018
|{{color box|#{{rail color|Delhi Metro|blue}}; font-size:100%|[[Blue Line (Delhi Metro)|<span style="color:white;">'''Blue Line'''</span>]]}}
|{{rcb|Delhi Metro|Blue|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|39||'''{{metro|Karkarduma Court}}'''
|39||{{stl|Delhi Metro|Karkarduma Court}}
|'''कड़कड़डूमा कोर्ट'''
|कड़कड़डूमा कोर्ट
|3
|31 October 2018
|31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|40||'''{{metro|Krishna Nagar|Delhi}}'''||'''कृष्णा नगर'''
|40||{{stl|Delhi Metro|Krishna Nagar}}||कृष्णा नगर||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|41||'''{{metro|East Azad Nagar}}'''||'''आज़ाद नगर पूर्व'''
|41||{{stl|Delhi Metro|East Azad Nagar}}||ईस्ट आज़ाद नगर||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|42
|42
|'''{{metro|Welcome}}'''
|{{stl|Delhi Metro|Welcome}}
|'''वेलकम'''
|वेलकम
|3
|31 October 2018
|31 October 2018
|{{color box|#{{rail color|Delhi Metro|red}}; font-size:100%|[[Red Line (Delhi Metro)|<span style="color:white;">'''Red Line'''</span>]]}}
|{{rcb|Delhi Metro|Red|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|43||'''{{metro|Jaffrabad}}'''||'''जाफ़राबाद'''
|43||{{stl|Delhi Metro|Jaffrabad}}||जाफ़राबाद||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|44
|44
|'''{{metro|Maujpur - Babarpur}}'''
|{{stl|Delhi Metro|Maujpur - Babarpur}}
|'''मौजपुर - बाबरपुर'''
|मौजपुर–बाबरपुर
|3
|31 October 2018
|31 October 2018
|{{color box|#{{rail color|Delhi Metro|Pink}}; font-size:100%|<span style="color:white;">'''Pink Line'''</span>}} <br/>'''(Phase 4 - Under Construction)'''
|{{rcb|Delhi Metro|Pink|croute}}
|Elevated
|Side
|}
 
{|class="wikitable" style="text-align: center;" width="100%"
! colspan="10" style="background:#{{rail color|Delhi Metro|Pink}};" | <span style="color:White;">Pink Line (Branch)</span>
|-
! rowspan="2" |#
! colspan="2" |Station Name
! rowspan="2" |Opening
! rowspan="2" |Interchange Connection
! rowspan="2" |Station Layout
! rowspan="2" |Platform Layout
|-
!English
!Hindi
|-
|1
|{{stl|Delhi Metro|Maujpur - Babarpur}}
|मौजपुर–बाबरपुर
|31 October 2018
|{{rcb|Delhi Metro|Pink|croute}}
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|45||'''{{metro|Gokulpuri}}'''||'''गोकुलपुरी'''
|2||{{stl|Delhi Metro|Gokulpuri}}||गोकुलपुरी||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|46||'''{{metro|Johri Enclave}}'''||'''जौहरी एनक्लेव'''
|3||{{stl|Delhi Metro|Johri Enclave}}||जोहरी एन्क्लेव||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|-
|-
|47||'''{{metro|Shiv Vihar}}'''||'''शिव विहार'''
|4||{{stl|Delhi Metro|Shiv Vihar}}||शिव विहार||31 October 2018
|3||31 October 2018
|None
|None
|Elevated
|Elevated
|Side
|Side
|None
|None
|}
|}


Line 528: Line 408:
!Rakes
!Rakes
|Hyundai Rotem
|Hyundai Rotem
|BEML
|Alstom Metropolis
|-
!Train Length
| colspan="2" |6
|-
|-
!Train Gauge
!Train Gauge
Line 540: Line 417:
|-
|-
!Train's Maximum Speed
!Train's Maximum Speed
| colspan="2" |100&nbsp;km/hr
| colspan="2" |100&nbsp;km/h
|-
|-
!Train Operation
!Train Operation
| colspan="2" |[[Delhi Metro]]
| colspan="2" |Majlis Park - Maujpur-Babarpur
Maujpur-Babarpur - Shiv Vihar
|}
|}


== Towards → [[Majlis Park metro station|Majlis Park]] ==
==Planned extension==
{{anchor | Extension }}


{| class="wikitable"
'''Gokulpuri-Hindon Airport-Arthala Pink Line Extension''': In September 2024, the [[Delhi_Metro|DMRC]] proposed a branch of 13 km from [[East Delhi|Trans-Yamuna North-East Delhi]] (existing [[Gokulpuri metro station]] of Pink Line) to the west Ghaziabad (existing [[Arthala metro station]] of Red Line) via [[Hindon Airport]] connecting 2 existing Red Line metro stations with 10 new Pink Line stations namely Gol Chakkar, DLF, Shalimar Garden, Hindon Airport, Bhopura, Tulsi Niketan, Rajendra Nagar, New Karhaira Colony, Karhaira, and Loni Road Industrial Area.<ref name=railext1>[https://www.timesnownews.com/delhi/new-metro-line-to-connect-north-east-delhi-with-trans-hindon-area-in-ghaziabad-article-113263970 New Metro Line To Connect North-East Delhi With Trans Hindon Area In Ghaziabad], timesnownews.com, 11 Sept 2024.</ref> It is also officially proposed in delhi metro phase 5 corridors, among the 4 metro corridors of phase 5 in ghaziabad.<ref>{{Cite news |date=2025-07-26 |title=Noida link among 4 Ghaziabad metro corridors in DMRC’s Phase-V plan |url=https://timesofindia.indiatimes.com/city/noida/noida-link-among-4-ghaziabad-metro-corridors-in-dmrcs-phase-v-plan/articleshow/122912732.cms |access-date=2026-02-21 |work=The Times of India |issn=0971-8257}}</ref>
! style="background: #{{rail color|Delhi Metro|pink}};" |<span style="color:White;">'''North Bound'''</span>
! style="background: #db7093;" |<span style="color:White;">'''Towards → [[Majlis Park metro station|Majlis Park]]'''</span>
|}
{| class="wikitable"
|+
! style="background: #{{rail color|Delhi Metro|pink}};" colspan="6" | <span style="color:White;">'''Pink Line'''</span>
|-
! style="background:#6495ED;" colspan="5" |<span style="color:White;">'''General Class'''</span>
! style="background:#C71585 |<span style="color:White;">'''Reserved For Ladies'''</span>
|-
! style="background:#00BFFF;" |<big>{{white|'''C6'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C5'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C4'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C3'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C2'''}}</big>
! style="background:#FF69B4;" |<big>{{white|'''C1'''}}</big>
|}
 
== Towards → [[Shiv Vihar metro station|Shiv Vihar]] ==
 
{| class="wikitable"
! style="background:#{{rail color|Delhi Metro|pink}};" |<span style="color:White;">'''North Bound'''</span>
! style="background:#db7093;" |<span style="color:White;">'''Towards → [[Shiv Vihar metro station|Shiv Vihar]]'''</span>
|}
{| class="wikitable"
|+
! style="background:#{{rail color|Delhi Metro|pink}};" colspan="6" | <span style="color:White;">'''Pink Line'''</span>
|-
! style="background:#6495ED;" colspan="5" |<span style="color:White;">'''General Class'''</span>
! style="background:#C71585 |<span style="color:White;">'''Reserved For Ladies'''</span>
|-
! style="background:#00BFFF;" |<big>{{white|'''C6'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C5'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C4'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C3'''}}</big>
! style="background:#00BFFF;" |<big>{{white|'''C2'''}}</big>
! style="background:#FF69B4;" |<big>{{white|'''C1'''}}</big>
|}


== See also ==
== See also ==
Line 602: Line 443:
* [http://www.delhimetrorail.com/annual_report.aspx/ Delhi Metro Annual Reports]
* [http://www.delhimetrorail.com/annual_report.aspx/ Delhi Metro Annual Reports]
*  {{cite web|title=Station Information|work=Delhi Metro Rail Corporation Ltd. (DMRC)|url=http://www.delhimetrorail.com/commuters/station_information.html|url-status=dead|archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html|archive-date=19 June 2010|df=dmy-all}}
*  {{cite web|title=Station Information|work=Delhi Metro Rail Corporation Ltd. (DMRC)|url=http://www.delhimetrorail.com/commuters/station_information.html|url-status=dead|archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html|archive-date=19 June 2010|df=dmy-all}}
* [http://delhimetromaps.com/delhi-metro-pink-line-route-map/ Delhi Metro Pink Line Details]
* [http://delhimetromaps.com/delhi-metro-pink-line-route-map/ Delhi Metro Pink Line Details] {{Webarchive|url=https://web.archive.org/web/20201003030434/http://delhimetromaps.com/delhi-metro-pink-line-route-map/ |date=3 October 2020 }}


{{Delhi Metro}}
{{Delhi Metro}}
{{Delhi & NCR Metro stations}}
{{Delhi & NCR Metro stations|pink line=yes}}
{{Rapid transit in India}}
{{Rapid transit in India}}
{{Rapid transit in Asia}}
{{Rapid transit in Asia}}

Latest revision as of 20:03, 29 March 2026


Pink Line (Line 7)
Pink Line near Anand Vihar Station
Overview
StatusOperational
OwnerDelhi Metro
LocaleDelhi
TerminiMaujpur-Babarpur
Shiv Vihar
Stations46
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Rolling stockHyundai-ROTEM
History
Opened
Technical
Line length73.49 km (45.66 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
ElectrificationTemplate:25 kV 50 Hz
Route map

Mukundanpur Depot
Majlis Park
Ring Road
Azadpur
 Yellow 
Shalimar Bagh
Netaji Subhash Place
 Red 
Shakurpur
NH-10 (Rohtak Road)
Punjabi Bagh West
 Green 
ESI Basaidarapur
Rajouri Garden
 Blue 
Najafgarh Road
Mayapuri
Naraina Vihar
Delhi Cantonment
Durgabai Deshmukh
South Campus
Sir Vishweshwaraiah Moti Bagh
Bhikaji Cama Place
Sarojini Nagar
Delhi Haat-INA
 Yellow 
South Extension
Lajpat Nagar
 Violet 
Vinobapuri
Ashram
Sarai Kale Khan - Nizamuddin
Hazrat Nizamuddin railway station Sarai Kale Khan Inter-State Bus Terminus
Ring Road
Yamuna River
Mayur Vihar-I
 Blue 
Mayur Vihar Pocket I
Trilokpuri Sanjay Lake
Vinod Nagar East-Mayur Vihar II
Mandawali - West Vinod Nagar
IP Extension
Anand Vihar
Anand Vihar Terminal railway station Swami Vivekanand Inter State Bus Terminus  Blue 
Karkarduma
 Blue 
Karkarduma Court
Krishna Nagar
East Azad Nagar
Welcome
 Red 
Grand Trunk Road
Jaffrabad
Maujpur-Babarpur
Gokulpuri
Johri Enclave
Shiv Vihar

The Pink Line (Line 7) is a line of the Delhi Metro, a rapid transit system in Delhi, India.[1] It consists of 46 stations between Maujpur - Babarpur via Majlis Park and Shiv Vihar and, at 73.49 kilometres (45.66 mi), is the Delhi Metro's — and India's — longest metro line. The Pink Line is India's first operational ring metro. It is also known as the Ring Road Line, as it mostly passes alongside the city's Inner Ring Road.[2]:86

The Pink Line has interchanges with most of the operational lines of the network, such as the Magenta Line at Majlis Park, Red Line at Netaji Subhash Place & Welcome, Yellow Line at Azadpur & Dilli Haat - INA, Green Line at Punjabi Bagh West, Blue Line at Rajouri Garden, Mayur Vihar Phase-I, Anand Vihar & Karkarduma, Dhaula Kuan of Airport Express (Orange Line) at Durgabai Deshmukh South Campus, Violet Line at Lajpat Nagar, as well as with Hazrat Nizamuddin and Anand Vihar Terminal (Indian Railways / Namo Bharat) and the ISBTs at Anand Vihar and Sarai Kale Khan.

The Pink Line has the highest point above ground on the Delhi Metro at Dhaula Kuan with a height of 23.6 metres (77 ft), passing over the Dhaula Kuan grade separator flyovers and the Airport Express Line.[3] It possesses the country's smallest metro station, Ashram, with a size of just 151.6 metres (497 ft) against the usual 265 metres (869 ft).[2]:93 The usual platform length for a six-coach train on this route is 140 metres (459 ft) but it has been reduced to 135 metres (443 ft) in Ashram station.

A feeder line from Shiv Vihar has separate services; passengers have to change platforms to continue on the main route.[4]

History[edit | edit source]

The line was initially put on table as a metro route that would run almost along the Delhi's busy Ring Road, on the lines of the existing Delhi Circular Railway. A route length of 59.24 kilometres (36.81 mi)[5] was proposed from Majlis Park to Shiv Vihar, that would cut through all the existing lines at various interchanges as part of Phase 3's expansion plans.

Currently, there are 46 stations in the Pink Line, out of which 34 are elevated and 12 are underground.

The line was opened in stages from 2018 to 2026. The first section on the Pink Line become operational from 14 March 2018 between Majlis Park to Durgabai Deshmukh South Campus, it was then extended to Lajpat Nagar on 6 August 2018. A separate section between Shiv Vihar to Trilokpuri-Sanjay Lake was opened on 31 October 2018 and the initial section was extended to Shree Ram Mandir Mayur Vihar (formerly known as Mayur Vihar Pocket-1) on 31 December 2018.

The section between Trilokpuri Sanjay Lake and Shree Ram Mandir Mayur Vihar was not completed as construction of a 1.5 km (0.93 mi) viaduct began late due to land acquisition issues at Trilokpuri.[6] This had rendered the Pink Line into two independent lines and forced DMRC to convert the Shree Ram Mandir Mayur Vihar (formerly known as Mayur Vihar Pocket-1) station into a terminating station with reversal facilities so that trains from Majlis Park would terminate there. On the eastern section, trains would run in separate loops - Shiv Vihar to Maujpur-Babarpur, Maujpur-Babarpur to IP Extension/Trilokpuri-Sanjay Lake. Every third train from Maujpur-Babarpur would move beyond IP Extension to Trilokpuri-Sanjay Lake as the latter has no reversal facilities and single line movement took place in that section. Both disjoint sections were finally bridged on 6 August 2021.[7]

In December 2024, trial runs were initiated on the Phase 4 extension from Majlis Park to Jagatpur Village stations which were gradually done till Sonia Vihar and finally Maujpur-Babarpur by August 2025. The Majlis Park to Maujpur - Babarpur stretch was opened on 8 March 2026, making this line India’s first ring metro line.

Stations[edit | edit source]

The stations of the Pink Line are:[8]

colspan="10" style="background:#Template:Rail color;" | Pink Line
# Station Name Opened Interchange Connection Station Layout Platform Layout
English Hindi
1 Template:Stl मौजपुर - बाबरपुर 8 March 2026 Template:Rcb Elevated Side
2 Template:Stl यमुना विहार 8 March 2026 None Elevated Side
3 Template:Stl भजनपुरा 8 March 2026 None Elevated Side
4 Template:Stl खजूरी ख़ास 8 March 2026 None Elevated Side
5 Template:Stl[9] नानकसर सोनिया विहार 8 March 2026 None Elevated Side
6 Soorghat सूरघाट 2026 None Elevated Side
7 Template:Stl जगतपुर - वज़ीराबाद 8 March 2026 None Elevated Side
8 Template:Stl झड़ौदा माजरा 8 March 2026 None Elevated Side
9 Template:Stl बुराड़ी 8 March 2026 None Elevated Side
10 Template:Stl मजलिस पार्क 14 March 2018 Template:Rcb Elevated Side
11 Template:Stl आज़ादपुर 14 March 2018 Template:Rcb
Template:Rcb
(Phase 4 - Under Construction)
Underground Island
12 Template:Stl शालीमार बाग़ 14 March 2018 None Underground Island
13 Template:Stl नेताजी सुभाष प्लेस 14 March 2018 Template:Rcb Underground Side
14 Template:Stl शकूरपुर 14 March 2018 None Elevated Island
15 Template:Stl पंजाबी बाग़ पश्चिम 14 March 2018 Template:Rcb
Elevated Side
16 Template:Stl ईएसआई - बसईदारापुर 14 March 2018 None Elevated Side
17 Template:Stl राजौरी गार्डन 14 March 2018 Template:Rcb Elevated Side
18 Template:Stl मायापुरी 14 March 2018 None Elevated Side
19 Template:Stl नारायणा 14 March 2018 None Underground Island
20 Template:Stl दिल्ली छावनी 14 March 2018 None Elevated Side
21 Template:Stl दुर्गाबाई देशमुख साउथ कैम्पस 14 March 2018 Template:Rcb Elevated Side
22 Sir Vishweshwaraiah Moti Bagh सर एम. विश्वेश्वरय्या मोती बाग़ 6 August 2018 None Elevated Side
23 Template:Stl भीकाजी कामा प्लेस 6 August 2018 None Underground Island
24 Template:Stl सरोजिनी नगर 6 August 2018 None Underground Island
25 Template:Stl दिल्ली हाट - आईएनए 6 August 2018 Template:Rcb Underground Island
26 Template:Stl साउथ एक्सटेंशन 6 August 2018 None Underground Island
27 Template:Stl लाजपत नगर 6 August 2018 Template:Rcb
Template:Rcb
(Phase 4 - Under Construction)
Underground Island
28 Template:Stl विनोबापुरी 31 December 2018 None Underground Island
29 Template:Stl आश्रम 31 December 2018 None Underground Island
30 Template:Stl सराय काले ख़ान निज़ामुद्दीन 31 December 2018 Template:Stl
Template:Ric Hazrat Nizamuddin
Bus interchange Sarai Kale Khan ISBT
Underground Island
31 Template:Stl मयूर विहार-I 31 December 2018 Template:Rcb Elevated Side
32 Template:Stl श्री राम मंदिर मयूर विहार 31 December 2018 None Elevated Side
33 Template:Stl त्रिलोकपुरी–संजय लेक 31 October 2018 None Elevated Side
34 Template:Stl ईस्ट विनोद नगर–मयूर विहार-II 31 October 2018 None Elevated Side
35 Template:Stl मंडावली - वेस्ट विनोद नगर 31 October 2018 None Elevated Side
36 Template:Stl आईपी एक्सटेंशन 31 October 2018 None Elevated Side
37 Template:Stl आनंद विहार 31 October 2018 Template:Rcb
Template:Stl
Template:Ric Anand Vihar Terminal
Bus interchange Anand Vihar ISBT
Elevated Side
38 Template:Stl कड़कड़डूमा 31 October 2018 Template:Rcb Elevated Side
39 Template:Stl कड़कड़डूमा कोर्ट 31 October 2018 None Elevated Side
40 Template:Stl कृष्णा नगर 31 October 2018 None Elevated Side
41 Template:Stl ईस्ट आज़ाद नगर 31 October 2018 None Elevated Side
42 Template:Stl वेलकम 31 October 2018 Template:Rcb Elevated Side
43 Template:Stl जाफ़राबाद 31 October 2018 None Elevated Side
44 Template:Stl मौजपुर–बाबरपुर 31 October 2018 Template:Rcb Elevated Side
colspan="10" style="background:#Template:Rail color;" | Pink Line (Branch)
# Station Name Opening Interchange Connection Station Layout Platform Layout
English Hindi
1 Template:Stl मौजपुर–बाबरपुर 31 October 2018 Template:Rcb Elevated Side
2 Template:Stl गोकुलपुरी 31 October 2018 None Elevated Side
3 Template:Stl जोहरी एन्क्लेव 31 October 2018 None Elevated Side
4 Template:Stl शिव विहार 31 October 2018 None Elevated Side

Train Info[edit | edit source]

style="background: #Template:Rail color;" colspan="3" |Pink Line
Rakes Hyundai Rotem Alstom Metropolis
Train Gauge 4 ft ​8 12 in (1,435 mm) standard gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed 100 km/h
Train Operation Majlis Park - Maujpur-Babarpur

Maujpur-Babarpur - Shiv Vihar

Planned extension[edit | edit source]

Gokulpuri-Hindon Airport-Arthala Pink Line Extension: In September 2024, the DMRC proposed a branch of 13 km from Trans-Yamuna North-East Delhi (existing Gokulpuri metro station of Pink Line) to the west Ghaziabad (existing Arthala metro station of Red Line) via Hindon Airport connecting 2 existing Red Line metro stations with 10 new Pink Line stations namely Gol Chakkar, DLF, Shalimar Garden, Hindon Airport, Bhopura, Tulsi Niketan, Rajendra Nagar, New Karhaira Colony, Karhaira, and Loni Road Industrial Area.[10] It is also officially proposed in delhi metro phase 5 corridors, among the 4 metro corridors of phase 5 in ghaziabad.[11]

See also[edit | edit source]

References[edit | edit source]

  1. "Metro comes to north-east Delhi, but it won't be straight line". Times of India. 30 October 2018.
  2. 2.0 2.1 Dayal, Anuj (5 April 2018). Delhi Metro - Phase 3 Challenges. New Delhi: Delhi Metro Rail Corporation.
  3. "New high for Metro with track at 24m". The Indian Express. 26 September 2014.
  4. "First section of Delhi Metro phase-IV to open by July 2024, says DMRC chief". TimesNow. 5 November 2023. Retrieved 24 November 2023.
  5. "Delhi Metro Map". www.delhimetrorail.com. Retrieved 6 August 2021.
  6. Roy, Sidharatha (4 May 2018). "Delhi Metro: Missing link at Mayur Vihar-1 in Metro's longest line finally set to be bridged". The Times of India. Retrieved 28 May 2019.
  7. "Delhi Metro Pink Line's Trilokpuri Sanjay Lake-Mayur Vihar Pocket-1 stretch inaugurated". The Hindu. 6 August 2021. ISSN 0971-751X. Retrieved 6 August 2021.
  8. "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation Ltd (DMR). February 2015. Retrieved 28 June 2015.
  9. "2 Delhi Metro stations renamed, 7 names modified". Hindustan Times. 23 February 2026. Retrieved 12 March 2026.
  10. New Metro Line To Connect North-East Delhi With Trans Hindon Area In Ghaziabad, timesnownews.com, 11 Sept 2024.
  11. "Noida link among 4 Ghaziabad metro corridors in DMRC's Phase-V plan". The Times of India. 26 July 2025. ISSN 0971-8257. Retrieved 21 February 2026.

External links[edit | edit source]