Yellow Line (Agra Metro)

From Bharatpedia, an open encyclopedia


Yellow Line
Overview
StatusUnder construction
LocaleAgra, Uttar Pradesh, India
TerminiJama Masjid (further extended to Sikandraa)
Taj East Gate
Service
TypeRapid transit
SystemAgra Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
Technical
Line length
  • 6.5 km (4.0 mi) (priority corridor)
CharacterUnderground & Elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (Top)
  • 34 km/h (21 mph) (average)

The Yellow Line (Line 1) (Hindi: ऑरेंज लाइन) is an under-construction metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The priority section of the line is expected to be operational by December 2023 or January 2024.[1][2]

List of stations[edit]

colspan="8" style="background:#Template:Rcr;" | Yellow Line
# Station Name Inter-station Distance (in km) Opening Connections Layout Coordinates
English Hindi
1 Sikandra सिकंदरा Under construction None Elevated
2 Guru Ka Taal गुरु का ताल Under construction None Elevated
3 ISBT आई एस बी टी Under construction None Elevated
4 Shastri Nagar शास्त्री नगर Under construction None Elevated
5 RBS College आर बी एस कॉलेज Under construction None Underground
6 Raja Ki Mandi राजा की मंडी Under construction None Underground
7 Agra College आगरा कॉलेज Under construction None Underground
8 Medical College मेडिकल कॉलेज Under construction None Underground
9 Jama Masjid जामा मस्जिद Under construction None Underground
10 Agra Fort आगरा किला Under construction None Underground
11 Taj Mahal ताज महल Under construction None Underground
12 Fatehabad Road फतेहाबाद रोड Under construction None Elevated
13 Basai बसई Under construction None Elevated
14 Taj East Gate ताज ईस्ट गेट Under construction None Elevated

See also[edit]

References[edit]

  1. "CM Yogi vows to complete Agra Metro's priority corridor by December 2023". www.deccanherald.com. Retrieved 17 July 2023.
  2. "Agra Metro Rail project: First train to roll out by Jan 2024! All details on fare, rail corridors here". www.financialexpress.com. Retrieved 17 July 2023.