Created by Mrrajrumel
Last edited May 3, 2026

Tirupati–Karimnagar Superfast Express
Overview
Service typeSuperfast Express
First service29 May 2013; 13 years ago (2013-05-29)
Current operator(s)South Central Railways
Route
StartTirupati (TPTY)
Stops10
EndKarimnagar (KRMR)
Distance travelled713 km (443 mi)
Average journey time12h 15m
Service frequencyBi-Weekly [lower-alpha 1]
Train number(s)12761 / 12762
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesOn-board catering,
E-catering
Observation facilitiesRake sharing with 12769/12770 Seven Hills Express
Other facilitiesBelow the seats
Technical
Rolling stockLHB coach
Track gauge1,676 mm (5 ft 6 in)
Operating speed58 km/h (36 mph) average including halts
Route map
(Karimnagar–Tirupati) Express route map

The 12761 / 12762 Tirupati–Karimnagar Superfast Express is a Superfast Express train belonging to South Central Railway zone that runs between Tirupati and Karimnagar in India. It is currently being operated with 12761/12762 train numbers on bi-weekly basis.[1][2][3]

Service[edit | edit source]

The 12761/Tirupati–Karimnagar Superfast Express has an average speed of 58 km/h and covers 713 km in 12h 15m. The 12762/Karimnagar–Tirupati Superfast Express has an average speed of 55 km/h and covers 713 km in 12h 55m.

Route & Halts[edit | edit source]

The important halts of the train are:

Coach composition[edit | edit source]

The train has LHB rakes with a maximum speed of 130 km/h. The train consists of 19 coaches since 26/7/2025:

  • 2 AC II Tier
  • 7 AC III Tier
  • 7 Sleeper coaches
  • 4 General Unreserved
  • 1 SLR & 1 EOG

Traction[edit | edit source]

Both trains are hauled by a Lallaguda Loco Shed-based WAP-7 or electric locomotive from Tirupati to Karimnagar and vice versa.

Rake sharing[edit | edit source]

The train shares its rake with 17007/17008 Secunderabad–Darbhanga Express and 12769/12770 Seven Hills Express.

Direction reversal[edit | edit source]

The train reverses its direction 1 times:

See also[edit | edit source]

Notes[edit | edit source]

  1. Runs two days in a week for every direction.

References[edit | edit source]

External links[edit | edit source]