Nadaprabhu Kempegowda Stn., Majestic
Template:Namma Metro Infobox station line
Majestic metro station entrance 'A' on Gubbi Thotadappa Road
Other namesMajestic Metro Station
LocationTank Bund Rd, Bengaluru, Karnataka 560009
India
Coordinates12°58′32″N 77°34′22″E / 12.975692°N 77.572836°E / 12.975692; 77.572836
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb Template:Rcb
PlatformsSide platform
Platform-1Template:Stl
Platform-2Template:Stl
Island platform
Platform-3Template:Stl
Platform-4Template:Stl
Tracks4
ConnectionsTemplate:Ric KSR Bengaluru
Bus interchange Kempegowda Bus Station
Construction
Structure typeUnderground, Double track
Depth80 feet (24 m)
Platform levels2
ParkingCar parking available
ArchitectGYT - COASTAL JV
Other information
StatusStaffed
Station codeKGWA
History
Opening30 April 2016 (Purple Line)
18 June 2017 (Green Line)
Electrified750 V DC third rail
Passengers
July 20179 lakh [1]
Rank1 out of 41
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Nadaprabhu Kempegowda Station, Majestic is an underground interchange metro station on the east–west corridor of the Purple Line and north–south corridor of Green Line of Namma Metro in Bengaluru, in the state of Karnataka, India.[2] It opened to the public on 30 April 2016 as part of Namma Metro's Phase-1. This important metro station serves as the interchange station allowing passengers to transfer between these lines for ease of travel.[3] The station is located within walking distance from BMTC & KSRTC's Kempegowda Bus Station, as also the City's Main Railway station.

History[edit | edit source]

Construction[edit | edit source]

The contract to construct Majestic station was awarded to Coastal-GYT JV at a cost of 272 crore (US$38 million). Construction began in January 2012 and was expected to be completed in 2014, but faced delays due to the hardness of the rock to be excavated, and missed several deadlines.[4][5] The delays escalated the cost to 500 crore (US$70 million). KSRTC, the state inter-city bus transport agency, provided BMRCL with 20 acres of land for construction of the station, slightly over half of which was returned to KSRTC after construction was completed. BMRCL paid KSRTC 4.6 crore (US$640,000) annually during the construction period as rent for the land. During the construction period, KSRTC incurred a loss of 100 crore (US$14 million) as they had to shut down bus services in the area.[6]

BMRCL employed 2,240 engineers, construction workers and others to build the station.[6] Majestic station (and all other underground stations of Namma Metro's Phase-1) was built using the cut-and-cover method. For Majestic station, the rocks were cut by blasting and 10,000 blasts had to be conducted during excavation.[7] BMRCL stated that it had used 300,000 cubic meters of sand (equal to the volume of six football fields) and 100,000 cubic meters of cement to build the station.[6] The underground section of the station includes a rake interchange to transfer trains between Purple and Green Line trains and vice versa.[8]

The station opened to the public on 30 April 2016. Green Line services commenced at the station (at one level below purple line) on 18 June 2017.

Structure[edit | edit source]

Inside the station

The station has four levels with a total floor surface area of 48,000 square meters (520,000 square feet) and is said to be the largest underground metro station in Asia.[9] The station area covers 7 acres.[6][9] Purple Line train platform is 365 metres long, Green Line train platform is 300 metres long. It has 12 staircases, 18 escape routes and 24 escalators.[10] The station's platforms are designed to handle 20,000 commuters at any given time.[6]

The surface level houses the entrances. There are four main entrances facing west, north-west, south and east.[11] Pedestrian subways and sky-walks connect the station to the adjacent railway station and the bus terminals.

Ticket counters are located on a mezzanine floor. The first underground level has platforms for Purple Line trains and the second underground level has platforms for Green Line trains, perpendicular to those of the platforms for Purple Line trains.[9][12]

Passenger services[edit | edit source]

Access[edit | edit source]

Lua error in Module:OSM_Location_map at line 1984: attempt to index field 'wikibase' (a nil value).

There are four entry/exit points – A,A1 B and C and D.

  • Entry/Exit point A,A1: Towards KSR Bengaluru Railway Stn. and Kempegowda bus station Terminal 2, 2A, with wheelchair accessibility
  • Entry/Exit point B: Towards Chikka Lalbagh with wheelchair accessibility
  • Entry/Exit point C: Towards Upparpete Police Station / Tank Bund Road side with wheelchair accessibility
  • Entry/Exit point D: Towards the walkway running through Kempegowda bus station Terminal 1 and BMTC bus station complex

A foot over bridge near the 'A' entry/exit also serves to connect the KSR city railway station on its main entrance as an alternative to using the subway connecting KSR City railway station and Kempegowda Bus station. [13] A skywalk directly connecting Metro station with KSR Bangalore city station and Kempegowda bus station is being planned as part of KSR City railway station redevelopment. [14]

Station layout[edit | edit source]

style="color:;background:#Template:Rail color;text-align:center;padding:5px"|
Nadaprabhu Kempegowda Stn., Majestic
track layout
Station with two tracks and two side platforms
style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Nadaprabhu Kempegowda Stn., Majestic
track layout
P3
P4
Station with two tracks and one Island platform
Surface level Street level Entrances and Exits
UG Level-1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
UG Level-2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Template:Stl
Next Station: Template:Stl
Platform 2
Westbound
Towards ← Template:Stl
Next Station: Template:Stl
Side platform | Doors will open on the left Disabled access
UG Level-3 Platform 4
Southbound
Towards → Template:Stl
Next Station: Template:Stl
Island platform | Doors will open on the right Disabled access
Platform 3
Northbound
Towards ← Template:Stl
Next Station: Template:Stl

Connections[edit | edit source]

See also[edit | edit source]

References[edit | edit source]

  1. "Kempegowda station saw 9 lakh ridership in July". The Hindu. 7 August 2017.
  2. "Metro Network". Archived from the original on 17 July 2015. Retrieved 15 July 2015.
  3. "Design and construct contract of underground station at Majestic" (PDF). BMRCL. December 2009. Archived from the original (PDF) on 11 October 2011. Retrieved 1 October 2011.
  4. Sastry, Anil Kumar (12 January 2012). "You still can't switch between the corridors when Phase I opens". The Hindu. Retrieved 15 June 2013.
  5. Ray, Aparajita (23 April 2016). "Underground Metro could roll out on May 4". The Times Of India. Archived from the original on 25 April 2016.
  6. 6.0 6.1 6.2 6.3 6.4 "2,240 workers worked day in, day out to build India's largest metro station". Bangalore Mirror. Retrieved 27 April 2016.
  7. "Conducted 10,000 blasts to cut hard rocks: BMRCL". Deccan Herald. Archived from the original on 2 July 2016. Retrieved 26 April 2016.
  8. "Bangalore Metro Rail Project" (PDF). Archived from the original (PDF) on 26 February 2021. Retrieved 4 September 2020.
  9. 9.0 9.1 9.2 "Majestic! It's biggest Metro station in Asia!". Deccan Chronicle. 15 June 2017. Retrieved 4 September 2020.
  10. "Bengaluru Metro's Purple Line links east and west". The Hindu. 30 April 2016. Retrieved 29 April 2016.
  11. "Kempegowda metro station to get 4th entrance soon". Deccan Herald. 28 June 2018. Retrieved 4 September 2020.
  12. "Metro June Deadline Stands, But With Rider". The New Indian Express. Archived from the original on 22 January 2016. Retrieved 27 April 2016.
  13. "Majestic metro station now linked to 3 other transport hubs". The Hindu. 21 February 2018.
  14. Siddiqui, Muthi-ur-Rahman. "A revamp plan for Bengaluru's main rail hub". No. 10 August 2024. Deccan herald. Retrieved 3 December 2025.