Created by RajKarmakar7602996600
Last edited December 25, 2025


Manjunath Nagar
Template:Namma Metro Infobox station line
Station Board as of February 2025
LocationTumkur Road, Manjunath Nagar, Bagalkunte, Bengaluru, Karnataka 560073
Coordinates13°03′00″N 77°29′40″E / 13.0501368°N 77.4944134°E / 13.0501368; 77.4944134
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Template:Stl
Platform-2 → Template:Stl
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
ArchitectSimplex Infrastructure
Other information
StatusOperational & Staffed
Station codeMNJN
History
Opened7 November 2024; 20 months ago (7 November 2024)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Infobox_mapframe at line 197: attempt to index field 'wikibase' (a nil value).

Manjunath Nagar is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the suburb of Nelamangala in Karnataka.

The Madavara - Nagasandra stretch trial run was conducted on August 6 2024[1][2] and with approval from Commissioner of Metro Railway Safety (CMRS) received on October 4, the section finally opened to public on 7 November 2024, with the formal inauguration to be done at a later stage. [3][4][5][6][7]

Station layout[edit | edit source]

style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Manjunath Nagar track layout
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Template:Stl
Next Station: Template:Stl
Platform 1
Northbound
Towards ← Template:Stl
Next Station: Template:Stl
Side platform | Doors will open on the left Disabled access
L2

See also[edit | edit source]

References[edit | edit source]

  1. Ghoshal, Sudeshna (6 August 2024). "Bengaluru metro update: New trains on Green line for THESE stations in Bangalore; trial run today". Mint. Retrieved 7 August 2024.
  2. Sridhar Vivan (5 August 2024). "Green line trial runs kick off in August". Bangalore Mirror. Retrieved 7 August 2024.
  3. "Day before public launch, DK Shivakumar takes metro ride to Madavara". Deccan Herald. Retrieved 7 November 2024.
  4. "After 7 years, extended Green Line opens today". The Times of India. 6 November 2024. ISSN 0971-8257. Retrieved 7 November 2024.
  5. "Extended Metro green line from Nagasandra to Madavara inaugurated - Public TV English". 6 November 2024. Retrieved 7 November 2024.
  6. "Extended Namma Metro Green Line operation launch likely on November 6". The Times of India. 5 November 2024. ISSN 0971-8257. Retrieved 6 November 2024.
  7. "Bengaluru Metro's Green Line extension set to open on Nov 7". Deccan Herald. Retrieved 6 November 2024.

External links[edit | edit source]

Template:Namma Metro