Manjunathanagara metro station

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)



Manjunath Nagar
Template:Namma Metro Infobox station line
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444Coordinates: 13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Disabled access(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpenedDecember 2023; 2 months ago (December 2023)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).

Manjunath Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. This metro station is stated to be operational around December 2023.[1][2]

Station layout[edit]

Station Layout (TBC)

style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Nagasandra
Platform 1
Northbound
Towards ← Madavara next station is Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit]

See also[edit]

References[edit]

  1. "Bengaluru Metro: New Line to Open for Public in September, Says Karnataka CM". News18. 17 August 2023. Retrieved 30 August 2023.
  2. DHNS. "Will Nagasandra-Madavara metro be operational by October? Bengaluru Metro Green Line updates". Deccan Herald. Retrieved 30 August 2023.

External links[edit]

Template:Namma Metro