Manjunathanagara metro station

From Bharatpedia, an open encyclopedia


Manjunath Nagar
Template:Namma Metro Infobox station line
LocationArch No 45, Gomatha Complex Bagalgunte, next to Bagalgunte, Bengaluru, Karnataka 560073
Coordinates13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444Coordinates: 13°03′01″N 77°29′40″E / 13.05022°N 77.49444°E / 13.05022; 77.49444
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Template:Rcb
PlatformsSide platform
Platform-1 → Madavara
Platform-2 → Silk Institute
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
Parking(TBC)
Disabled access(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
OpenedDecember 2023; 15 months ago (December 2023)
Electrified750 V DC third rail
Services
Page Template:Adjacent stations/styles.css has no content.Lua error in package.lua at line 80: module 'Module:Adjacent stations/Namma Metro' not found.
Location
Lua error in Module:Mapframe at line 764: attempt to index field 'wikibase' (a nil value).

Manjunath Nagar is an upcoming elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway leading towards the city of Nelamangala in Karnataka. This metro station is stated to be operational around December 2023.[1][2]

Station layout[edit]

Station Layout (TBC)

style="color:white;background:#Template:Rail color;text-align:center;padding:5px"|
Manjunath Nagar track layout (TBC)
P1
P2
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 2
Southbound
Towards → Silk Institute next station is Nagasandra
Platform 1
Northbound
Towards ← Madavara next station is Chikkabidarakallu
Side platform | Doors will open on the left Disabled access
L2

Entry/Exits[edit]

See also[edit]

References[edit]

  1. "Bengaluru Metro: New Line to Open for Public in September, Says Karnataka CM". News18. 17 August 2023. Retrieved 30 August 2023.
  2. DHNS. "Will Nagasandra-Madavara metro be operational by October? Bengaluru Metro Green Line updates". Deccan Herald. Retrieved 30 August 2023.

External links[edit]

Template:Namma Metro