Gudur–Chennai section

From Bharatpedia, an open encyclopedia
Information red.svg
Scan the QR code to donate via UPI
Dear reader, We need your support to keep the flame of knowledge burning bright! Our hosting server bill is due on June 1st, and without your help, Bharatpedia faces the risk of shutdown. We've come a long way together in exploring and celebrating our rich heritage. Now, let's unite to ensure Bharatpedia continues to be a beacon of knowledge for generations to come. Every contribution, big or small, makes a difference. Together, let's preserve and share the essence of Bharat.

Thank you for being part of the Bharatpedia family!
Please scan the QR code on the right click here to donate.

0%

   

transparency: ₹0 raised out of ₹100,000 (0 supporter)


Gudur–Chennai section
Gudur railway station.jpg
Gudur Junction the starting point of Gudur–Chennai section
Overview
StatusOperational
OwnerIndian Railways
LocaleAndhra Pradesh, Tamil Nadu
TerminiGudur
Chennai Central
Service
Operator(s)South Coast Railway, Southern Railway
History
Opened1899
Technical
Track length455 km (283 mi)
Number of tracks2
Track gauge1,676 mm (5 ft 6 in) broad gauge
Operating speed160 km/h (99 mph)
Route map
Template:Gudur–Chennai section

The Gudur–Chennai section is a railway line connecting Gudur in the Indian state of Andhra Pradesh and Chennai Central of Tamil Nadu. The main line is part of the Howrah–Chennai main line and New Delhi–Chennai main line.[1][2]

Jurisdiction[edit]

Gudur is under the administrative jurisdiction of South Coast Railway, and the rest of the line up to Chennai is under the administrative jurisdiction of Southern Railway.

Due to heavy and incessant rains from 3 to 5 November 1957, water overflowed the track at many places between Tada and Nayudupeta stations on the Madras–Gudur section of the Southern Railway resulting in the interruption of through communication from the afternoon of 4-11-1957 [3]

  • The damage was caused both to the track and bridges on the Akkampet-Sullurpeta-Nayudupeta section of the Madras–Bezwada line on 4-11-1957 due to heavy rain and estimated cost of damage is about 2.5 lakhs.
  • About 410 passengers on No. 16 Up Grant Trunk Express and about 500 passengers on No. 18 Up Janta Express which were scheduled to arrive at Madras on 4-11-1957 were held up at Sullurpeta and Dhoravari Chattram stations respectively.[4]

References[edit]

  1. "3rd rail line joining Duvvada, Gudur to be completed in 5 yrs". The Business Standard. Vijayawada. 3 November 2015. Retrieved 26 March 2016.
  2. "Goods train derailment: SCR cancels several trains". The Hindu. Vijayawada. 25 April 2014. Retrieved 26 March 2016.
  3. https://eparlib.nic.in/bitstream/123456789/1494/1/lsd_02_03_20-11-1957.pdf page 30
  4. https://eparlib.nic.in/bitstream/123456789/1494/1/lsd_02_03_20-11-1957.pdf page 30

External links[edit]