>Monkbot m Task 18 (cosmetic): eval 2 templates: hyphenate params (1×); |
->WOSlinker m remove tel link |
||
| Line 30: | Line 30: | ||
==Network== | ==Network== | ||
There are 4 lines proposed to be built. [[RITES]], the consultancy arm of [[ | There are 4 lines proposed to be built. [[RITES]], the consultancy arm of [[Indian Railways]] has begun soil inspection as well as ground survey for the monorail network.<ref>[http://www.rediff.com/business/report/rites-begins-ground-survey-for-monorail-in-patna/20111021.htm RITES begins ground survey for monorail in Patna - Rediff.com Business<!-- Bot generated title -->]</ref><ref>[http://in.news.yahoo.com/monorail-ground-survey-tees-off-000000209.html Monorail ground survey tees off - Yahoo! News India<!-- Bot generated title -->]</ref> | ||
* [[Patna Junction]] to [[Gandhi Maidan]]. | * [[Patna Junction]] to [[Gandhi Maidan]]. | ||
| Line 39: | Line 39: | ||
==Project detail== | ==Project detail== | ||
The total estimated cost of the project is {{Indian Rupee}}2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna is 32 km and in the first phase route length between 20 km and 25 km would be completed.<ref>{{cite news| url=http://www.telegraphindia.com/1111224/jsp/bihar/story_14922568.jsp | location=Calcutta, India | work=The Telegraph | title=Capital monorail project shifts gear | date=2011-12-24}}</ref> | The total estimated cost of the project is {{Indian Rupee}}2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna is 32 km and in the first phase route length between 20 km and 25 km would be completed.<ref>{{cite news| url=http://www.telegraphindia.com/1111224/jsp/bihar/story_14922568.jsp | location=Calcutta, India | work=The Telegraph | title=Capital monorail project shifts gear | date=2011-12-24}}</ref> | ||
As of 2021 the project has not commenced. | |||
==See also== | |||
* [[Patna Metro|Patna metro]] | |||
==References== | ==References== | ||
| Line 50: | Line 55: | ||
[[Category:Proposed monorails in India]] | [[Category:Proposed monorails in India]] | ||
[[Category:Transport in Patna]] | [[Category:Transport in Patna]] | ||
{{India-rail-transport-stub}} | {{India-rail-transport-stub}} | ||
{{monorail-stub}} | {{monorail-stub}} | ||
Revision as of 16:16, 12 August 2021
| Overview | |
|---|---|
| Locale | Patna, Bihar |
| Transit type | straddle-beam Monorail |
| Number of lines | 4 (planned) |
| Daily ridership | 32,000 (Estd.) |
| Operation | |
| Began operation | Government of Bihar preferred metro rail over mono rail |
| Train length | 4 coaches |
| Technical | |
| System length | 32 kilometers (20 mi) |
| Electrification | 750 V DC |
| Average speed | 31 km/h (19 mph) |
| Top speed | 80 km/h (50 mph) |
Patna Monorail is a proposed monorail system for the city of Patna.[1][2]
Network
There are 4 lines proposed to be built. RITES, the consultancy arm of Indian Railways has begun soil inspection as well as ground survey for the monorail network.[3][4]
- Patna Junction to Gandhi Maidan.
- Patna Junction to Patliputra Colony.
- Patna Junction to Lok Nayak Jayaprakash Airport.
- Patna Junction to Kankarbagh.
Project detail
The total estimated cost of the project is ₹2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna is 32 km and in the first phase route length between 20 km and 25 km would be completed.[5]
As of 2021 the project has not commenced.
See also
References
- ↑ "Mono-Rail for Patna soon". Samaylive.com. 28 December 2010. Retrieved 11 January 2011.
- ↑ Monorail News Briefs Archived 13 June 2010 at the Wayback Machine
- ↑ RITES begins ground survey for monorail in Patna - Rediff.com Business
- ↑ Monorail ground survey tees off - Yahoo! News India
- ↑ "Capital monorail project shifts gear". The Telegraph. Calcutta, India. 24 December 2011.