Yellow Line (Agra Metro): Difference between revisions

Created by 2405:9800:BC10:3A42:98E2:490A:7379:511D
Last edited October 17, 2025
m Removed empty portal template using script
mNo edit summary
 
Line 1: Line 1:
{{Short description|Mass transit system in Uttar Pradesh, India}}
{{Short description|Mass transit system in Uttar Pradesh, India}}
{{Use dmy dates}}
{{Use dmy dates|date=December 2021}}
{{Use Indian English}}
{{Use Indian English|date=December 2021}}
{{Infobox rail line
{{Infobox rail line
| name           = Yellow Line
| name                           = Yellow Line
| color           = {{rcr|Agra Metro|Yellow}}
| color                           = {{rcr|Agra Metro|Yellow}}
| logo           =  
| logo                           =  
| image           =  
| image                           = Mankameshwar Temple Metro 2.jpg
| image_width     =  
| image_width                     =  
| caption         = Train of <span style="color:#FF6600;">'''Yellow Line'''</span>
| caption                         = Yellow Line train at Mankameshwar Temple station
| type           = [[Rapid transit]]
| type                           = [[Rapid Transit]]
| system         = [[Agra Metro]]
| system                         = [[Agra Metro]]
| status         = Under construction
| status                         = Partially Operational
| locale         = [[Agra]], [[Uttar Pradesh]], [[India]]
| locale                         = [[Agra]], [[Uttar Pradesh]], [[India]]
| start           = Jama Masjid'' (further extended to Sikandraa)''
| start                           = [[Mankameshwar metro station|Mankameshwar]]'' (further extended to Sikandra)''
| end             = Taj East Gate
| end                             = [[Taj East Gate metro station|Taj East Gate]]
| stations       =  
| stations                       = 13 <br /> 6 (operational)
| daily_ridership =  
| daily_ridership                 =  
| open           =  
| open                           = 6 March 2024
| close           =  
| close                           =  
| operator       = [[Uttar Pradesh Metro Rail Corporation]]
| operator                       = [[Uttar Pradesh Metro Rail Corporation]]
| character       = Underground & Elevated
| character                       = underground and [[elevated railway|elevated]]
| stock           = [[Alstom]] - [[Bombardier Movia]]
| stock                           = [[Alstom]] - [[Bombardier Movia]]
| linelength     = {{ubl|{{cvt|6.5|km}} (priority corridor)}}
| linelength                     = {{cvt|14.25|km}} <br />{{cvt|6.5|km}} (operational)
| tracklength     =  
| tracklength                     =  
| tracks         =  
| tracks                         =  
| gauge           = {{track gauge|sg|allk=on}}
| gauge                           = {{track gauge|sg|allk=on}}
| electrification = 750 V DC [[third rail]]
| electrification                 = 750 V DC [[third rail]]
| speed           = {{ubl|{{cvt|80|km/h}} (Top)|{{cvt|34|km/h}} (average)}}
| speed                           = {{ubl|{{cvt|80|km/h}} (maximum)|{{cvt|34|km/h}} (average)}}
| map             =  
| map                             = {{Agra Metro Yellow Line Route}}
| map_state       = collapsed
| map_state                       = collapsed
}}
}}


The '''Yellow Line (Line 1)''' ({{lang-hi|ऑरेंज लाइन}}) is an under-construction metro rail line of the [[Agra Metro]], a [[rapid transit]] system in [[Agra]], [[Uttar Pradesh]], [[India]]. The priority section of the line is expected to be operational by December 2023 or January 2024.<ref>{{cite web|title=CM Yogi vows to complete Agra Metro's priority corridor by December 2023|url=https://www.deccanherald.com/video/national/cm-yogi-vows-to-complete-agra-metros-priority-corridor-by-december-2023-1188664.html|website=www.deccanherald.com|access-date=17 July 2023}}</ref><ref>{{cite web|title=Agra Metro Rail project: First train to roll out by Jan 2024! All details on fare, rail corridors here|url=https://www.financialexpress.com/business/infrastructure-agra-metro-rail-project-first-train-to-roll-out-by-jan-2024-all-details-on-fare-rail-corridors-here-2981913/|website=www.financialexpress.com|access-date=17 July 2023}}</ref>
The '''Yellow Line (Line 1)''' ({{langx|hi|येलो लाइन}}) is a partly operational metro rail line of the [[Agra Metro]], a [[rapid transit]] system in [[Agra]], [[Uttar Pradesh]], [[India]]. The 6.5 km section of the line was inaugurated by PM Modi on  6 March 2024. Once complete, it will connect Sikandra to Taj East Gate by the distance of 14.25 km.  
 
==List of stations==
==List of stations==
{|class="wikitable" style="text-align: center;" width="65%"
{|class="wikitable" style="text-align: center;" width="65%"
|-
|-
! colspan="8" style="background:#{{rcr|Agra Metro|Yellow}};" | <span style="color:BLACK;">Yellow Line</span>
! colspan="8" style="background:#{{rcr|Agra Metro|Yellow}};" | <span style="color:Black;">Yellow Line</span>
|-
|-
! width="1%"  rowspan="2"|#
! width="1%"  rowspan="2"|#
! width="5%"  colspan="2"|Station Name
! width="5%"  colspan="2"|Station Name
! width="5%"  rowspan="2"|Inter-station Distance (in km)
! width="5%"  rowspan="2"|Opening
! width="5%"  rowspan="2"|Opening
! width="10%"  rowspan="2"|Connections
! width="10%"  rowspan="2"|Connections
! width="5%"  rowspan="2"|Layout
! width="5%"  rowspan="2"|Layout
! width="5%"  rowspan="2"|Coordinates
|-
|-
! English||[[Hindi]]
! English||[[Hindi]]
|-
|-
|1||Sikandra||सिकंदरा|| ||Under construction|||None||Elevated||
| 1 || Sikandra || सिकंदरा || Under construction || None || Elevated  
|-
|2||Guru Ka Taal||गुरु का ताल|| ||Under construction||None||Elevated||
|-
|-
|3||ISBT||आई एस बी टी|| ||Under construction||None||Elevated||
| 2 || Guru Ka Taal || गुरु का ताल|| Under construction || None || Elevated
|-
|-
|4||Shastri Nagar||शास्त्री नगर|| ||Under construction||None||Elevated||
| 3 || ISBT || आई एस बी टी|| Under construction || None || Elevated  
|-
|-
|5||RBS College||आर बी एस कॉलेज|| ||Under construction||None||Underground||
| 4 || RBS College || आर बी एस कॉलेज|| Under construction || None || Underground
|-
|-
|6||Raja Ki Mandi||राजा की मंडी|| ||Under construction||None||Underground||
| 5 || Raja Ki Mandi || राजा की मंडी|| Under construction || {{ric|Indian Railways}} [[Raja ki Mandi railway station|Raja Ki Mandi]]|| Underground
|-
|-
|7||Agra College||आगरा कॉलेज|| ||Under construction||None||Underground||
| 6 || Agra College || आगरा कॉलेज|| Under construction ||{{rcb|Agra Metro|blue|croute}}|| Underground
|-
|-
|8||Medical College||मेडिकल कॉलेज|| ||Under construction||None||Underground||
| 7 || Medical College || मेडिकल कॉलेज|| Under construction || None || Underground
|-
|-
|9||Jama Masjid||जामा मस्जिद|| ||Under construction||None||Underground||
| 8 || {{metro|Mankameshwar}} || मनः कामेश्वर || 6 March 2024 || {{ric|Indian Railways}} [[Agra Fort railway station|Agra Fort]]|| Underground
|-
|-
|10||Agra Fort||आगरा किला|| ||Under construction||None||Underground||
| 9 || {{metro|Dr. Ambedkar Chowk}} || डॉ. अम्बेडकर चौक || 6 March 2024 || None|| Underground
|-
|-
|11||Taj Mahal||ताज महल|| ||Under construction||None||Underground||
| 10 || {{metro|Taj Mahal}} || ताज महल ||6 March 2024 || None || Underground
|-
|-
|12||Fatehabad Road||फतेहाबाद रोड|| ||Under construction||None||Elevated||
| 11|| {{metro|Fatehabad Road}} || फतेहाबाद रोड ||6 March 2024 || None || Elevated
|-
|-
|13||Basai||बसई|| ||Under construction||None||Elevated||
| 12|| {{metro|Shaheed Captain Shubham Gupta}} || शहीद कैप्टन शुभम गुप्ता ||6 March 2024 || None || Elevated
|-
|-
|14||Taj East Gate||ताज ईस्ट गेट|| ||Under construction||None||Elevated||
| 13|| {{metro|Taj East Gate}} || ताज ईस्ट गेट || 6 March 2024 || None || Elevated
|}
|}


Line 87: Line 85:
{{reflist}}
{{reflist}}


{{Commons|Agra Metro}}
{{Wikivoyage|Agra}}


{{Rapid transit in India}}
{{Rapid transit in India}}
{{Portal bar|India|Trains|Transport|Engineering}}


[[Category:Rapid transit lines in India]]
[[Category:Rapid transit lines in India]]
[[Category:Railway lines opened in 2024]]

Latest revision as of 16:43, 17 October 2025


Yellow Line
Yellow Line train at Mankameshwar Temple station
Overview
StatusPartially Operational
LocaleAgra, Uttar Pradesh, India
TerminiMankameshwar (further extended to Sikandra)
Taj East Gate
Stations13
6 (operational)
Service
TypeRapid Transit
SystemAgra Metro
Operator(s)Uttar Pradesh Metro Rail Corporation
Rolling stockAlstom - Bombardier Movia
History
Opened6 March 2024
Technical
Line length14.25 km (8.85 mi)
6.5 km (4.0 mi) (operational)
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 80 km/h (50 mph) (maximum)
  • 34 km/h (21 mph) (average)
Route map
Template:Agra Metro Yellow Line Route

The Yellow Line (Line 1) (Script error: The function "langx" does not exist.) is a partly operational metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The 6.5 km section of the line was inaugurated by PM Modi on 6 March 2024. Once complete, it will connect Sikandra to Taj East Gate by the distance of 14.25 km.

List of stations[edit | edit source]

colspan="8" style="background:#Template:Rcr;" | Yellow Line
# Station Name Opening Connections Layout
English Hindi
1 Sikandra सिकंदरा Under construction None Elevated
2 Guru Ka Taal गुरु का ताल Under construction None Elevated
3 ISBT आई एस बी टी Under construction None Elevated
4 RBS College आर बी एस कॉलेज Under construction None Underground
5 Raja Ki Mandi राजा की मंडी Under construction Template:Ric Raja Ki Mandi Underground
6 Agra College आगरा कॉलेज Under construction Template:Rcb Underground
7 Medical College मेडिकल कॉलेज Under construction None Underground
8 Mankameshwar मनः कामेश्वर 6 March 2024 Template:Ric Agra Fort Underground
9 Dr. Ambedkar Chowk डॉ. अम्बेडकर चौक 6 March 2024 None Underground
10 Taj Mahal ताज महल 6 March 2024 None Underground
11 Fatehabad Road फतेहाबाद रोड 6 March 2024 None Elevated
12 Shaheed Captain Shubham Gupta शहीद कैप्टन शुभम गुप्ता 6 March 2024 None Elevated
13 Taj East Gate ताज ईस्ट गेट 6 March 2024 None Elevated

See also[edit | edit source]

References[edit | edit source]