m Removed empty portal template using script |
mNo edit summary |
||
| Line 1: | Line 1: | ||
{{Short description|Mass transit system in Uttar Pradesh, India}} | {{Short description|Mass transit system in Uttar Pradesh, India}} | ||
{{Use dmy dates}} | {{Use dmy dates|date=December 2021}} | ||
{{Use Indian English}} | {{Use Indian English|date=December 2021}} | ||
{{Infobox rail line | {{Infobox rail line | ||
| name | | name = Yellow Line | ||
| color | | color = {{rcr|Agra Metro|Yellow}} | ||
| logo | | logo = | ||
| image | | image = Mankameshwar Temple Metro 2.jpg | ||
| image_width | | image_width = | ||
| caption | | caption = Yellow Line train at Mankameshwar Temple station | ||
| type | | type = [[Rapid Transit]] | ||
| system | | system = [[Agra Metro]] | ||
| status | | status = Partially Operational | ||
| locale | | locale = [[Agra]], [[Uttar Pradesh]], [[India]] | ||
| start | | start = [[Mankameshwar metro station|Mankameshwar]]'' (further extended to Sikandra)'' | ||
| end | | end = [[Taj East Gate metro station|Taj East Gate]] | ||
| stations | | stations = 13 <br /> 6 (operational) | ||
| daily_ridership = | | daily_ridership = | ||
| open | | open = 6 March 2024 | ||
| close | | close = | ||
| operator | | operator = [[Uttar Pradesh Metro Rail Corporation]] | ||
| character | | character = underground and [[elevated railway|elevated]] | ||
| stock | | stock = [[Alstom]] - [[Bombardier Movia]] | ||
| linelength | | linelength = {{cvt|14.25|km}} <br />{{cvt|6.5|km}} (operational) | ||
| tracklength | | tracklength = | ||
| tracks | | tracks = | ||
| gauge | | gauge = {{track gauge|sg|allk=on}} | ||
| electrification = 750 V DC [[third rail]] | | electrification = 750 V DC [[third rail]] | ||
| speed | | speed = {{ubl|{{cvt|80|km/h}} (maximum)|{{cvt|34|km/h}} (average)}} | ||
| map | | map = {{Agra Metro Yellow Line Route}} | ||
| map_state | | map_state = collapsed | ||
}} | }} | ||
The '''Yellow Line (Line 1)''' ({{ | The '''Yellow Line (Line 1)''' ({{langx|hi|येलो लाइन}}) is a partly operational metro rail line of the [[Agra Metro]], a [[rapid transit]] system in [[Agra]], [[Uttar Pradesh]], [[India]]. The 6.5 km section of the line was inaugurated by PM Modi on 6 March 2024. Once complete, it will connect Sikandra to Taj East Gate by the distance of 14.25 km. | ||
==List of stations== | ==List of stations== | ||
{|class="wikitable" style="text-align: center;" width="65%" | {|class="wikitable" style="text-align: center;" width="65%" | ||
|- | |- | ||
! colspan="8" style="background:#{{rcr|Agra Metro|Yellow}};" | <span style="color: | ! colspan="8" style="background:#{{rcr|Agra Metro|Yellow}};" | <span style="color:Black;">Yellow Line</span> | ||
|- | |- | ||
! width="1%" rowspan="2"|# | ! width="1%" rowspan="2"|# | ||
! width="5%" colspan="2"|Station Name | ! width="5%" colspan="2"|Station Name | ||
! width="5%" rowspan="2"|Opening | ! width="5%" rowspan="2"|Opening | ||
! width="10%" rowspan="2"|Connections | ! width="10%" rowspan="2"|Connections | ||
! width="5%" rowspan="2"|Layout | ! width="5%" rowspan="2"|Layout | ||
|- | |- | ||
! English||[[Hindi]] | ! English||[[Hindi]] | ||
|- | |- | ||
|1||Sikandra||सिकंदरा | | 1 || Sikandra || सिकंदरा || Under construction || None || Elevated | ||
|- | |- | ||
| | | 2 || Guru Ka Taal || गुरु का ताल|| Under construction || None || Elevated | ||
|- | |- | ||
| | | 3 || ISBT || आई एस बी टी|| Under construction || None || Elevated | ||
|- | |- | ||
| | | 4 || RBS College || आर बी एस कॉलेज|| Under construction || None || Underground | ||
|- | |- | ||
| | | 5 || Raja Ki Mandi || राजा की मंडी|| Under construction || {{ric|Indian Railways}} [[Raja ki Mandi railway station|Raja Ki Mandi]]|| Underground | ||
|- | |- | ||
| | | 6 || Agra College || आगरा कॉलेज|| Under construction ||{{rcb|Agra Metro|blue|croute}}|| Underground | ||
|- | |- | ||
| | | 7 || Medical College || मेडिकल कॉलेज|| Under construction || None || Underground | ||
|- | |- | ||
| | | 8 || {{metro|Mankameshwar}} || मनः कामेश्वर || 6 March 2024 || {{ric|Indian Railways}} [[Agra Fort railway station|Agra Fort]]|| Underground | ||
|- | |- | ||
| | | 9 || {{metro|Dr. Ambedkar Chowk}} || डॉ. अम्बेडकर चौक || 6 March 2024 || None|| Underground | ||
|- | |- | ||
| | | 10 || {{metro|Taj Mahal}} || ताज महल ||6 March 2024 || None || Underground | ||
|- | |- | ||
| | | 11|| {{metro|Fatehabad Road}} || फतेहाबाद रोड ||6 March 2024 || None || Elevated | ||
|- | |- | ||
| | | 12|| {{metro|Shaheed Captain Shubham Gupta}} || शहीद कैप्टन शुभम गुप्ता ||6 March 2024 || None || Elevated | ||
|- | |- | ||
| | | 13|| {{metro|Taj East Gate}} || ताज ईस्ट गेट || 6 March 2024 || None || Elevated | ||
|} | |} | ||
| Line 87: | Line 85: | ||
{{reflist}} | {{reflist}} | ||
{{Commons|Agra Metro}} | |||
{{Wikivoyage|Agra}} | |||
{{Rapid transit in India}} | {{Rapid transit in India}} | ||
{{Portal bar|India|Trains|Transport|Engineering}} | |||
[[Category:Rapid transit lines in India]] | [[Category:Rapid transit lines in India]] | ||
[[Category:Railway lines opened in 2024]] | |||
Latest revision as of 16:43, 17 October 2025
| Yellow Line | |||
|---|---|---|---|
![]() Yellow Line train at Mankameshwar Temple station | |||
| Overview | |||
| Status | Partially Operational | ||
| Locale | Agra, Uttar Pradesh, India | ||
| Termini | Mankameshwar (further extended to Sikandra) Taj East Gate | ||
| Stations | 13 6 (operational) | ||
| Service | |||
| Type | Rapid Transit | ||
| System | Agra Metro | ||
| Operator(s) | Uttar Pradesh Metro Rail Corporation | ||
| Rolling stock | Alstom - Bombardier Movia | ||
| History | |||
| Opened | 6 March 2024 | ||
| Technical | |||
| Line length | 14.25 km (8.85 mi) 6.5 km (4.0 mi) (operational) | ||
| Character | underground and elevated | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | 750 V DC third rail | ||
| Operating speed |
| ||
| |||
The Yellow Line (Line 1) (Script error: The function "langx" does not exist.) is a partly operational metro rail line of the Agra Metro, a rapid transit system in Agra, Uttar Pradesh, India. The 6.5 km section of the line was inaugurated by PM Modi on 6 March 2024. Once complete, it will connect Sikandra to Taj East Gate by the distance of 14.25 km.
List of stations[edit | edit source]
| colspan="8" style="background:#Template:Rcr;" | Yellow Line | |||||
|---|---|---|---|---|---|
| # | Station Name | Opening | Connections | Layout | |
| English | Hindi | ||||
| 1 | Sikandra | सिकंदरा | Under construction | None | Elevated |
| 2 | Guru Ka Taal | गुरु का ताल | Under construction | None | Elevated |
| 3 | ISBT | आई एस बी टी | Under construction | None | Elevated |
| 4 | RBS College | आर बी एस कॉलेज | Under construction | None | Underground |
| 5 | Raja Ki Mandi | राजा की मंडी | Under construction | Template:Ric Raja Ki Mandi | Underground |
| 6 | Agra College | आगरा कॉलेज | Under construction | Template:Rcb | Underground |
| 7 | Medical College | मेडिकल कॉलेज | Under construction | None | Underground |
| 8 | Mankameshwar | मनः कामेश्वर | 6 March 2024 | Template:Ric Agra Fort | Underground |
| 9 | Dr. Ambedkar Chowk | डॉ. अम्बेडकर चौक | 6 March 2024 | None | Underground |
| 10 | Taj Mahal | ताज महल | 6 March 2024 | None | Underground |
| 11 | Fatehabad Road | फतेहाबाद रोड | 6 March 2024 | None | Elevated |
| 12 | Shaheed Captain Shubham Gupta | शहीद कैप्टन शुभम गुप्ता | 6 March 2024 | None | Elevated |
| 13 | Taj East Gate | ताज ईस्ट गेट | 6 March 2024 | None | Elevated |
See also[edit | edit source]
- Agra
- Uttar Pradesh Metro Rail Corporation
- Uttar Pradesh State Road Transport Corporation
- List of rapid transit systems in India
- List of metro systems
References[edit | edit source]
