Line 1: Line 1:
{{Short description|Metro line in Jaipur, India}}
{{Use dmy dates|date=December 2016}}
{{Use dmy dates|date=December 2016}}
{{more citations needed|date=August 2012}}
{{Infobox rail line
{{Infobox rail line
| color     = {{Delhi Metro color|Pink}}
| color = {{rcr|Jaipur Metro|Pink}}
| name       = Pink Line
| name = Pink Line
| type       = [[Rapid Transit]]
| type = [[Rapid Transit]]
| system     = [[Jaipur Metro]]
| system = {{ric|Jaipur Metro}} [[Jaipur Metro]]
| status     =  
| status =  
| locale     = [[Jaipur]], [[Rajasthan]], [[India]]  
| locale = [[Jaipur]], [[Rajasthan]], [[India]]
| start     = [[Mansarovar metro station|Mansarovar]] (West)
| start = [[Mansarovar metro station|Mansarovar]] (West)
| end       = [[Chandpole metro station|Chandpole]] (East)
| end = [[Badi Chaupar metro station|Badi Chaupar]] (East)
| stations   = 11
| stations = 11
| daily_ridership =  
| daily_ridership = 53,065 (July 2026)
| open       = 3 June 2015
| open = {{start date and age| 3 June 2015}}
| close     =  
| close =  
| owner     = Jaipur Metro Rail Corporation LTD.
| owner = Jaipur Metro Rail Corporation LTD.
| operator   =  
| operator = JMRC
| character = Elevated & Underground
| character = Elevated & Underground
| stock =  
| stock =  
| linelength_km = 11.97
| linelength_km = 11.97
| tracklength =  
| tracklength =  
| tracks     = 2
| tracks = 2
| gauge     = {{RailGauge|sg|allk=on}}  
| gauge = {{track gauge|sg|allk=on}}
| electrification = 25 kV, AC [[overhead line|Overhead catenary]]
| electrification = {{25 kV 50 Hz}} from [[overhead line|overhead catenary]]
| speed      =  
| speed_km/h = 80
| elevation =  
| elevation =  
| map       = {{Jaipur Metro Pink Line Route}}
| map = {{Jaipur Metro Pink Line Route}}
| map_state = collapsed
| map_state = collapsed
| image     = Jaipur 03-2016 34 Jaipur Metro.jpg
| image = Jaipur 03-2016 34 Jaipur Metro.jpg
| image_width = 260px
| image_width = 260px
}}
}}
The '''Pink Line''' of the [[Jaipur Metro]] is part of the [[rapid transit]] system in the city of [[Jaipur]], [[India]]. It is also called East-West Corridor of Jaipur.<ref>{{Cite web|last=|first=|date=16 July 2020|title=New Jaipur Metro Pink Line {{!}}Map{{!}}Route{{!}}Station{{!}}Fare 2020|url=https://metromap.in/jaipur-metro-pink-line-new-map-route-station/|url-status=live|archive-url=|archive-date=|access-date=2020-07-16|website=MetroMap.in|language=en-US}}</ref> It consists of 11 metro stations from [[Mansarovar metro station|Mansarovar]] in the West to [[Badi Chaupar metro station|Chaupar]] in the East. The line with a length of {{convert|11.97|km|mi|sp=us}} is mostly elevated and partially underground and has been laid to connect the oldest part of Jaipur to rest of it.
The '''Pink Line''' of the [[Jaipur Metro]] is part of the [[rapid transit]] system in the city of [[Jaipur]], [[India]]. It is also called East-West Corridor of Jaipur.<ref>{{Cite web|last=|first=|date=16 July 2020|title=New Jaipur Metro Pink Line {{!}}Map{{!}}Route{{!}}Station{{!}}Fare 2020|url=https://metromap.in/jaipur-metro-pink-line-new-map-route-station/|access-date=2020-07-16|website=MetroMap.in|language=en-US}}</ref> It consists of 11 metro stations from [[Mansarovar metro station|Mansarovar]] in the West to [[Badi Chaupar metro station|Badi Chaupar]] in the East. The line with a length of {{convert|11.97|km|mi|sp=us}} is mostly elevated and partially underground and has been laid to connect the oldest part of Jaipur to rest of it.


This is the Metro line that got flagged off on 3 June 2015, and has been named as Pink Line, as the line passes through the ''Pink City''.<ref name="brief-note">{{cite web |url=https://www.jaipurmetrorail.in/pdf/39Brief%20Note%20on%20the%20Project.pdf |title=Jaipur Metro A Brief Note on the Project |publisher=JMRC |page=2 |accessdate=2015-06-03 |url-status=dead |archiveurl=https://web.archive.org/web/20160304062922/https://www.jaipurmetrorail.in/pdf/39Brief%20Note%20on%20the%20Project.pdf |archivedate=4 March 2016 |df=dmy-all }}</ref>
This is the Metro line that got flagged off on 3 June 2015, and has been named as Pink Line, as the line passes through the ''Pink City''.<ref name="brief-note">{{cite web |url=https://www.jaipurmetrorail.in/pdf/39Brief%20Note%20on%20the%20Project.pdf |title=Jaipur Metro A Brief Note on the Project |publisher=JMRC |page=2 |accessdate=2015-06-03 |url-status=dead |archiveurl=https://web.archive.org/web/20160304062922/https://www.jaipurmetrorail.in/pdf/39Brief%20Note%20on%20the%20Project.pdf |archivedate=4 March 2016 |df=dmy-all }}</ref>


The Pink line has planned interchange with the [[Orange Line (Jaipur Metro)|Orange Line]] of the Jaipur Metro. it also connects Mansarovar, the Largest Colony of Asia with the [[Jaipur Junction railway station]] of the [[Indian Railways]] and [[Sindhi Camp|Sindhi Camp Bus Stand]].
The [[Pink Line (Jaipur Metro)|Pink Line]] connects the residential hub of [[Mansarovar, Jaipur|Mansarovar]] with major intermodal transit hubs and historic landmarks across the city. It links with the [[Indian Railways]] network at [[Railway Station metro station (Jaipur)|Railway Station metro station]], adjacent to [[Jaipur Junction railway station]], and integrates with regional bus services at [[Sindhi Camp]], where an interchange with the planned [[Orange Line (Jaipur Metro)|Orange Line]] is designed. On its eastern underground section, the corridor extends into the [[Walled City of Jaipur|UNESCO-listed Walled City]], terminating at [[Badi Chaupar metro station|Badi Chaupar]] to provide direct pedestrian access to major heritage destinations including the [[City Palace, Jaipur|City Palace]], [[Hawa Mahal]], the Old Town Hall, and [[Jantar Mantar, Jaipur|Jantar Mantar]].


==History==
==History==
Line 40: Line 40:
{|class="wikitable" style="text-align: center;"  
{|class="wikitable" style="text-align: center;"  
|-  
|-  
! colspan="6" style="background:#{{Delhi Metro color|Pink}};" | <span style="color:WHITE;">'''History'''</span>   
! colspan="6" style="background:#{{rcr|Jaipur Metro|Pink}};" | <span style="color:black;">History</span>   
|-
|-
! width="5%" |Name
! width="5%" |Name
! width="5%" |Extension date
! width="5%" |Opening date
! width="5%"  colspan="2"|Termini
! width="5%"  colspan="2"|Terminals
! width="10%" |Length
! width="10%" |Length
! width="5%" |Stations
! width="5%" |Stations
|-
|-
| Phase-I A<ref>{{Cite web|url=http://articles.economictimes.indiatimes.com/2012-07-16/news/32698550_1_jaipur-metro-first-phase-metro-train|title=Business News Today: Read Latest Business news, India Business News Live, Share Market & Economy News}}</ref> ||3 June 2015||[[Mansarovar metro station|Mansarovar]]||[[Chandpole metro station|Chandpole]]||{{convert|9.63|km|mi|sp=us}}||9
| Phase-I A<ref>{{Cite web|url=http://articles.economictimes.indiatimes.com/2012-07-16/news/32698550_1_jaipur-metro-first-phase-metro-train|archive-url=https://web.archive.org/web/20160305015307/http://articles.economictimes.indiatimes.com/2012-07-16/news/32698550_1_jaipur-metro-first-phase-metro-train|url-status=dead|archive-date=5 March 2016|title=Business News Today: Read Latest Business news, India Business News Live, Share Market & Economy News}}</ref> ||3 June 2015||[[Mansarovar metro station|Mansarovar]]||[[Chandpole metro station|Chandpole]]||{{convert|9.63|km|mi|sp=us}}||9
|-
|-
| Phase-I B ||23 September 2020<ref>{{cite web |last1=Jun 4 |first1=TNN {{!}} Updated |title=Work on Jaipur Metro 1B to start next year {{!}} Jaipur News - Times of India |url=https://timesofindia.indiatimes.com/city/jaipur/work-on-metro-1b-to-start-next-year/articleshow/69640673.cms |website=The Times of India |accessdate=10 August 2019 |language=en}}</ref> ||Chandpole||[[Badi Chaupar metro station|Badi Chaupar]]||{{convert|2.34|km|mi|sp=us}}||2
| Phase-I B ||23 September 2020<ref>{{cite news |last1=Jun 4 |first1=TNN {{!}} Updated |title=Work on Jaipur Metro 1B to start next year {{!}} Jaipur News - Times of India |url=https://timesofindia.indiatimes.com/city/jaipur/work-on-metro-1b-to-start-next-year/articleshow/69640673.cms |website=The Times of India |date=4 June 2019 |accessdate=10 August 2019 |language=en}}</ref> ||Chandpole||[[Badi Chaupar metro station|Badi Chaupar]]||{{convert|2.34|km|mi|sp=us}}||2
|-
|-
!Total|| ||Mansarovar||Badi Chaupar||{{convert|11.97|km|mi|sp=us}}||11
!Total|| ||Mansarovar||Badi Chaupar||{{convert|11.97|km|mi|sp=us}}||11
Line 58: Line 58:
{|class="wikitable" style="text-align: center;" width="65%"  
{|class="wikitable" style="text-align: center;" width="65%"  
|-  
|-  
! colspan="8" style="background:#{{Delhi Metro color|Pink}};" | <span style="color:BLACK;">'''Pink Line Stations'''</span>  
! colspan="8" style="background:#{{rcr|Jaipur Metro|Pink}};" | <span style="color:BLACK;">Pink Line stations</span>  
|-
|-
! width="1%"  rowspan="2"|#
! width="1%"  rowspan="2"|#
Line 70: Line 70:
! [[English language|English]]||[[Hindi]]
! [[English language|English]]||[[Hindi]]
|-
|-
|1||[[Mansarovar metro station|Mansarovar]]||मानसरोवर||0||June 3, 2015|||None||Elevated||{{coord|26.879531|75.749971|type:railwaystation_region:IN|format=dms}}
|1||Ajmer Road Chauraha||अजमेर रोड चौराहा||||December 2027|||None||Elevated||
|-
|-
|2||[[New Aatish Market metro station|New Aatish Market]]||नया आतिश मार्केट||1.454||June 3, 2015||None||Elevated||{{coord|26.880308|75.764602|type:railwaystation_region:IN|format=dms}}
|2||[[Mansarovar metro station|Mansarovar]]||मानसरोवर||0||June 3, 2015|||None||Elevated||{{coord|26.879531|75.749971|type:railwaystation_region:IN|format=dms}}
|-
|-
|3||[[Vivek Vihar metro station|Vivek Vihar]]||विवेक विहार||1.105||June 3, 2015||None||Elevated||{{coord|26.888952|75.768499|type:railwaystation_region:IN|format=dms}}
|3||[[New Aatish Market metro station|New Aatish Market]]||न्यू आतिश मार्केट||1.454||June 3, 2015||None||Elevated||{{coord|26.880308|75.764602|type:railwaystation_region:IN|format=dms}}
|-
|-
|4||[[Shyam Nagar metro station|Shyam Nagar]]||श्याम नगर||0.881||June 3, 2015||None||Elevated||{{coord|26.896650|75.770667|type:railwaystation_region:IN|format=dms}}
|4||[[Vivek Vihar metro station|Vivek Vihar]]||विवेक विहार||1.105||June 3, 2015||None||Elevated||{{coord|26.888952|75.768499|type:railwaystation_region:IN|format=dms}}
|-
|-
|5||[[Ram Nagar metro station|Ram Nagar]]||राम नगर||0.747||June 3, 2015||None||Elevated||{{coord|26.901944|75.774652|type:railwaystation_region:IN|format=dms}}
|5||[[Shyam Nagar metro station|Shyam Nagar]]||श्याम नगर||0.881||June 3, 2015||None||Elevated||{{coord|26.896650|75.770667|type:railwaystation_region:IN|format=dms}}
|-
|-
|6||[[Civil Lines metro station (Jaipur)|Civil Lines]]||सिविल लाइन्स||1.086||June 3, 2015||None||Elevated||{{coord|26.909585|75.781277|type:railwaystation_region:IN|format=dms}}
|6||[[Ram Nagar metro station|Ram Nagar]]||राम नगर||0.747||June 3, 2015||None||Elevated||{{coord|26.901944|75.774652|type:railwaystation_region:IN|format=dms}}
|-
|-
|7||[[Railway Station metro station|Railway Station]]||रेलवे स्टेशन||1.583||June 3, 2015||[[Jaipur Junction railway station]] <br />([[Indian Railways]])||Elevated||{{coord|26.918559|75.789903|type:railwaystation_region:IN|format=dms}}
|7||[[Civil Lines metro station (Jaipur)|Civil Lines]]||सिविल लाइन्स||1.086||June 3, 2015||None||Elevated||{{coord|26.909585|75.781277|type:railwaystation_region:IN|format=dms}}
|-
|-
|8||[[Sindhi Camp metro station|Sindhi Camp]]||सिन्धी कैंप||1.338||June 3, 2015||{{color box|#{{Jaipur Metro color|Orange}}; font-size:80%}} [[Orange Line (Jaipur Metro)|Orange Line (proposed)]], <br />[[Sindhi Camp|Sindhi Camp Bus Stand]]||Elevated||{{coord|26.922563|75.799747|type:railwaystation_region:IN|format=dms}}
|8||[[Railway Station metro station|Railway Station]]||रेलवे स्टेशन||1.583||June 3, 2015||{{ric|Indian Railways}} {{stnlnk|Jaipur Junction}}||Elevated||{{coord|26.918559|75.789903|type:railwaystation_region:IN|format=dms}}
|-
|-
|9||[[Chandpole metro station|Chandpole]]||चांदपोल||0.786||June 3, 2015||None||Underground||{{coord|26.926370|75.807456|type:railwaystation_region:IN|format=dms}}
|9||[[Sindhi Camp metro station|Sindhi Camp]]||सिन्धी कैंप||1.338||June 3, 2015||{{rcb|Jaipur Metro|Orange|croute}} (Proposed)<br />{{rint|bus}} [[Sindhi Camp]]||Elevated||{{coord|26.922563|75.799747|type:railwaystation_region:IN|format=dms}}
|-
|-
|10||[[Chhoti Chaupar metro station|Chhoti Chaupar]] ||छोटी चौपड़||1.221||September 23, 2020||None||Underground||26° 55.46"N
|10||[[Chandpole metro station|Chandpole]]||चाँदपोल ||0.786||June 3, 2015||None||Underground||{{coord|26.926370|75.807456|type:railwaystation_region:IN|format=dms}}
 
|-
75° 49.10"E
|11||[[Chhoti Chaupar metro station|Chhoti Chaupar]] ||छोटी चौपड़||1.221||September 23, 2020||None||Underground||{{coord|26.9246198|75.8184183|type:railwaystation_region:IN|format=dms}}
|-
|12||[[Badi Chaupar metro station|Badi Chaupar]] ||बड़ी चौपड़||0.853||September 23, 2020||None||Underground||{{coord|26.9229216|75.8268344|type:railwaystation_region:IN|format=dms}}
|-
|13
|Galtaji Gate
|गलताजी गेट
|TBD
|July 2028
|None
|Underground
|
|-
|-
|11||[[Badi Chaupar metro station|Badi Chaupar]] ||बड़ी चौपड़||0.853||September 23, 2020||None||Underground||26° 55.37"N
|14
 
|Transport Nagar
75° 49.61"E
|ट्रांसपोर्ट नगर
|TBA
|July 2028
|None
|Elevated
|
|-
|-
|}
|}
Line 103: Line 119:
''2) [[Badi Chaupar (Jaipur Metro)|Badi Chaupar]]''.
''2) [[Badi Chaupar (Jaipur Metro)|Badi Chaupar]]''.


The construction of the extension was delayed following the discovery of an ancient [[stepwell]].<ref name="indiatimes.com">{{cite web|url=http://timesofindia.indiatimes.com/city/jaipur/Metro-set-to-miss-2018-deadline/articleshow/55320997.cms|title=Metro set to miss 2018 deadline - Times of India|publisher=}}</ref>
The construction of the extension was delayed following the discovery of an ancient [[stepwell]].<ref name="indiatimes.com">{{cite news|url=http://timesofindia.indiatimes.com/city/jaipur/Metro-set-to-miss-2018-deadline/articleshow/55320997.cms|title=Metro set to miss 2018 deadline - Times of India|website=[[The Times of India]] |date=9 November 2016 |publisher=}}</ref>


==Phase-I C extension==
==Phase 1C extension==
For Phase 1C, Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar. For the same, the corporation has prepared a detailed project report (DPR) of Phase 1C by taking public suggestions. According to the DPR, the estimated project cost will be Rs 856 crore, including cost of land and taxes, The total length of the project will be 2.85km (2.26km Underground and 0.59km Elevated). This project is expected to be completed till March 2025 if the construction takes place. Once constructed, the estimated ridership between the entire stretch, Mansarovar to Transport Nagar, will be over 1.38 lakh till 2031.<ref>{{Cite web | url=https://timesofindia.indiatimes.com/city/jaipur/jmrc-plans-to-extend-badi-chaupar-corridor/articleshow/80606062.cms |title=JMRC plans to extend Badi Chaupar corridor| date= 31 January 2021}}</ref> The stations on this extension are:<br />
For Phase 1C, Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar. For the same, the corporation had prepared a detailed project report (DPR) of Phase 1C. According to the DPR, the estimated project cost was ₹856 crores, including cost of land and taxes. The total length of the project was supposed to be 2.85km (2.26km Underground and 0.59km Elevated). This project was expected to be completed till March 2025.<ref>{{Cite web | url=https://timesofindia.indiatimes.com/city/jaipur/jmrc-plans-to-extend-badi-chaupar-corridor/articleshow/80606062.cms |title=JMRC plans to extend Badi Chaupar corridor|website=[[The Times of India]] | date= 31 January 2021}}</ref>
 
In March 2025, the state government halted the initial alignment via Ramganj Chaupar to re-evaluate tunneling routes and conduct feasibility reviews.<ref>{{Cite news |last=Basu |first=Arpit |date=2025-03-08 |title=Metro Line 1C extension scrapped; Cong cries foul |url=https://timesofindia.indiatimes.com/city/jaipur/metro-line-1c-extension-scrapped-cong-cries-foul/articleshow/118809177.cms |url-status=live |archive-url=https://web.archive.org/web/20220925201930/https://timesofindia.indiatimes.com/city/jaipur/jmrc-plans-to-extend-badi-chaupar-corridor/articleshow/80606062.cms |archive-date=September 25, 2022 |access-date=2026-08-31 |work=The Times of India |issn=0971-8257}}</ref>
 
JMRC subsequently finalized a modified alignment that eliminated the Ramganj Chaupar station to minimize surface disruption within the [[Walled City of Jaipur]] [[UNESCO World Heritage Site]]. Under the revised plan, the corridor extends underground from Badi Chaupar to a new subterranean station at Galtaji Crossing on Delhi Road, before rising onto an elevated viaduct terminating at Transport Nagar. Construction resumed on 5 June 2025, with completion projected for July 2028.<ref>{{Cite news |last=Basu |first=Arpit |date=2026-06-19 |title=Jaipur metro rail corp proposes Galtaji station, drops Ramganj stop |url=https://timesofindia.indiatimes.com/city/jaipur/jaipur-metro-rail-corp-proposes-galtaji-station-drops-ramganj-stop/articleshow/131863157.cms |url-status=live |archive-url=https://web.archive.org/web/20260801021748/https://timesofindia.indiatimes.com/city/jaipur/jaipur-metro-rail-corp-proposes-galtaji-station-drops-ramganj-stop/articleshow/131863157.cms |archive-date=August 1, 2026 |access-date=2026-08-31 |work=The Times of India |issn=0971-8257}}</ref><ref>{{Cite web |title=Daily Progress Report : 1C |url=https://www.scribd.com/document/1051148441/JMRC-1C-DPR-08-06-26 |url-status=live |access-date=2026-08-31 |website=Scribd}}</ref>
 
<br>The stations on this extension are:<br />
''1) [[Badi Chaupar (Jaipur Metro)|Badi Chaupar]]''<br />
''1) [[Badi Chaupar (Jaipur Metro)|Badi Chaupar]]''<br />
''2) Ramganj Chaupar''<br />
''2) Galtaji Gate''<br />
''3) Transport Nagar'' <ref>{{Cite web | url=https://themetrorailguy.com/2021/02/01/jaipur-metro-publishes-phase-1c-phase-2-dprs-for-finalization/ |title=Jaipur Metro Publishes Phase 1C & Phase 2 DPRs for Finalization| date= 1 February 2021}}</ref>
''3) Transport Nagar'' <ref>{{Cite web | url=https://themetrorailguy.com/2021/02/01/jaipur-metro-publishes-phase-1c-phase-2-dprs-for-finalization/ |title=Jaipur Metro Publishes Phase 1C & Phase 2 DPRs for Finalization| date= 1 February 2021}}</ref>
=== Phase 1D ===
Under Phase 1D, the Jaipur Metro Rail Corporation (JMRC) is extending the [[Pink Line (Jaipur Metro)|Pink Line]] westward from Mansarovar to the 200 Feet Bypass on [[Ajmer Road]]. Prepared following public consultations, the Detailed Project Report (DPR) specifies a fully elevated corridor spanning {{convert|1.312|km|mi|abbr=on}}, featuring a single elevated terminal station at Ajmer Road along with a {{convert|0.357|km|mi|abbr=on}} loop line for train turnaround and operations.<ref>{{Cite web |last=Terra |first=Yash |title=SEZ Road & Ajmer Road, Jaipur: 2026–2031 Infrastructure Outlook |url=https://yashterra.co.in/blog/sez-road-ajmer-road-infrastructure-outlook-2026.html |url-status=live |archive-url=https://web.archive.org/web/20260831133426/https://yashterra.co.in/blog/sez-road-ajmer-road-infrastructure-outlook-2026.html |archive-date=August 31, 2026 |access-date=2026-08-31 |website=Yash Terra |language=en-IN}}</ref><ref>{{Cite web |title=Daily progress report |url=https://www.scribd.com/document/1051147502/11-06-2026-DPR |url-status=live |access-date=2026-08-31 |website=www.scribd.com}}</ref>


==See also==
==See also==

Latest revision as of 12:18, 28 September 2026

Pink Line
Overview
OwnerJaipur Metro Rail Corporation LTD.
LocaleJaipur, Rajasthan, India
TerminiMansarovar (West)
Badi Chaupar (East)
Stations11
Service
TypeRapid Transit
System Jaipur Metro
Operator(s)JMRC
Daily ridership53,065 (July 2026)
History
Opened3 June 2015; 11 years ago (3 June 2015)
Technical
Line length11.97 km (7.44 mi)
Number of tracks2
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationTemplate:25 kV 50 Hz from overhead catenary
Operating speed80 km/h (50 mph)
Route map

Ajmer Road Chauraha
Mansarovar
Mansarovar Depot
New Aatish Market
Gurjar Ki Thadi Underpass
Vivek Vihar
Shyam Nagar
Ram Nagar
Hawa Sadak
Civil Lines
Railway Station
Jaipur Junction railway station
Sindhi Camp
Sindhi Camp
Orange Line
(proposed)
Chandpole
Chhoti Chaupar
Badi Chaupar
Galtaji Gate
Transport Nagar

The Pink Line of the Jaipur Metro is part of the rapid transit system in the city of Jaipur, India. It is also called East-West Corridor of Jaipur.[1] It consists of 11 metro stations from Mansarovar in the West to Badi Chaupar in the East. The line with a length of 11.97 kilometers (7.44 mi) is mostly elevated and partially underground and has been laid to connect the oldest part of Jaipur to rest of it.

This is the Metro line that got flagged off on 3 June 2015, and has been named as Pink Line, as the line passes through the Pink City.[2]

The Pink Line connects the residential hub of Mansarovar with major intermodal transit hubs and historic landmarks across the city. It links with the Indian Railways network at Railway Station metro station, adjacent to Jaipur Junction railway station, and integrates with regional bus services at Sindhi Camp, where an interchange with the planned Orange Line is designed. On its eastern underground section, the corridor extends into the UNESCO-listed Walled City, terminating at Badi Chaupar to provide direct pedestrian access to major heritage destinations including the City Palace, Hawa Mahal, the Old Town Hall, and Jantar Mantar.

History[edit | edit source]

The following dates represent the dates the section opened to the public, not the private inauguration.

History
Name Opening date Terminals Length Stations
Phase-I A[3] 3 June 2015 Mansarovar Chandpole 9.63 kilometers (5.98 mi) 9
Phase-I B 23 September 2020[4] Chandpole Badi Chaupar 2.34 kilometers (1.45 mi) 2
Total Mansarovar Badi Chaupar 11.97 kilometers (7.44 mi) 11

Route[edit | edit source]

Pink Line stations
# Station Name Inter-station Distance (in km) Opening Connections Layout Coordinates
English Hindi
1 Ajmer Road Chauraha अजमेर रोड चौराहा December 2027 None Elevated
2 Mansarovar मानसरोवर 0 June 3, 2015 None Elevated 26°52′46″N 75°45′00″E / 26.879531°N 75.749971°E / 26.879531; 75.749971
3 New Aatish Market न्यू आतिश मार्केट 1.454 June 3, 2015 None Elevated 26°52′49″N 75°45′53″E / 26.880308°N 75.764602°E / 26.880308; 75.764602
4 Vivek Vihar विवेक विहार 1.105 June 3, 2015 None Elevated 26°53′20″N 75°46′07″E / 26.888952°N 75.768499°E / 26.888952; 75.768499
5 Shyam Nagar श्याम नगर 0.881 June 3, 2015 None Elevated 26°53′48″N 75°46′14″E / 26.896650°N 75.770667°E / 26.896650; 75.770667
6 Ram Nagar राम नगर 0.747 June 3, 2015 None Elevated 26°54′07″N 75°46′29″E / 26.901944°N 75.774652°E / 26.901944; 75.774652
7 Civil Lines सिविल लाइन्स 1.086 June 3, 2015 None Elevated 26°54′35″N 75°46′53″E / 26.909585°N 75.781277°E / 26.909585; 75.781277
8 Railway Station रेलवे स्टेशन 1.583 June 3, 2015 Jaipur Junction Elevated 26°55′07″N 75°47′24″E / 26.918559°N 75.789903°E / 26.918559; 75.789903
9 Sindhi Camp सिन्धी कैंप 1.338 June 3, 2015 Orange Line (Proposed)
Bus interchange Sindhi Camp
Elevated 26°55′21″N 75°47′59″E / 26.922563°N 75.799747°E / 26.922563; 75.799747
10 Chandpole चाँदपोल 0.786 June 3, 2015 None Underground 26°55′35″N 75°48′27″E / 26.926370°N 75.807456°E / 26.926370; 75.807456
11 Chhoti Chaupar छोटी चौपड़ 1.221 September 23, 2020 None Underground 26°55′29″N 75°49′06″E / 26.9246198°N 75.8184183°E / 26.9246198; 75.8184183
12 Badi Chaupar बड़ी चौपड़ 0.853 September 23, 2020 None Underground 26°55′23″N 75°49′37″E / 26.9229216°N 75.8268344°E / 26.9229216; 75.8268344
13 Galtaji Gate गलताजी गेट TBD July 2028 None Underground
14 Transport Nagar ट्रांसपोर्ट नगर TBA July 2028 None Elevated

Phase-I B extension[edit | edit source]

Under Phase-I B, the Pink Line was extended further East from Chandpole station by 2.349 km. Two additional stations got built to extend the line to Badi Chaupar. The stations on this extension are:
1) Chhoti Chaupar
2) Badi Chaupar.

The construction of the extension was delayed following the discovery of an ancient stepwell.[5]

Phase 1C extension[edit | edit source]

For Phase 1C, Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar. For the same, the corporation had prepared a detailed project report (DPR) of Phase 1C. According to the DPR, the estimated project cost was ₹856 crores, including cost of land and taxes. The total length of the project was supposed to be 2.85km (2.26km Underground and 0.59km Elevated). This project was expected to be completed till March 2025.[6]

In March 2025, the state government halted the initial alignment via Ramganj Chaupar to re-evaluate tunneling routes and conduct feasibility reviews.[7]

JMRC subsequently finalized a modified alignment that eliminated the Ramganj Chaupar station to minimize surface disruption within the Walled City of Jaipur UNESCO World Heritage Site. Under the revised plan, the corridor extends underground from Badi Chaupar to a new subterranean station at Galtaji Crossing on Delhi Road, before rising onto an elevated viaduct terminating at Transport Nagar. Construction resumed on 5 June 2025, with completion projected for July 2028.[8][9]


The stations on this extension are:
1) Badi Chaupar
2) Galtaji Gate
3) Transport Nagar [10]

Phase 1D[edit | edit source]

Under Phase 1D, the Jaipur Metro Rail Corporation (JMRC) is extending the Pink Line westward from Mansarovar to the 200 Feet Bypass on Ajmer Road. Prepared following public consultations, the Detailed Project Report (DPR) specifies a fully elevated corridor spanning 1.312 km (0.815 mi), featuring a single elevated terminal station at Ajmer Road along with a 0.357 km (0.222 mi) loop line for train turnaround and operations.[11][12]

See also[edit | edit source]

References[edit | edit source]

  1. ↑ "New Jaipur Metro Pink Line |Map|Route|Station|Fare 2020". MetroMap.in. 16 July 2020. Retrieved 16 July 2020.
  2. ↑ "Jaipur Metro A Brief Note on the Project" (PDF). JMRC. p. 2. Archived from the original (PDF) on 4 March 2016. Retrieved 3 June 2015.
  3. ↑ "Business News Today: Read Latest Business news, India Business News Live, Share Market & Economy News". Archived from the original on 5 March 2016.
  4. ↑ Jun 4, TNN | Updated (4 June 2019). "Work on Jaipur Metro 1B to start next year | Jaipur News - Times of India". The Times of India. Retrieved 10 August 2019. {{cite news}}: |first1= has generic name (help)CS1 maint: numeric names: authors list (link)
  5. ↑ "Metro set to miss 2018 deadline - Times of India". The Times of India. 9 November 2016.
  6. ↑ "JMRC plans to extend Badi Chaupar corridor". The Times of India. 31 January 2021.
  7. ↑ Basu, Arpit (8 March 2025). "Metro Line 1C extension scrapped; Cong cries foul". The Times of India. ISSN 0971-8257. Archived from the original on 25 September 2022. Retrieved 31 August 2026.
  8. ↑ Basu, Arpit (19 June 2026). "Jaipur metro rail corp proposes Galtaji station, drops Ramganj stop". The Times of India. ISSN 0971-8257. Archived from the original on 1 August 2026. Retrieved 31 August 2026.
  9. ↑ "Daily Progress Report : 1C". Scribd. Retrieved 31 August 2026.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "Jaipur Metro Publishes Phase 1C & Phase 2 DPRs for Finalization". 1 February 2021.
  11. ↑ Terra, Yash. "SEZ Road & Ajmer Road, Jaipur: 2026–2031 Infrastructure Outlook". Yash Terra. Archived from the original on 31 August 2026. Retrieved 31 August 2026.
  12. ↑ "Daily progress report". www.scribd.com. Retrieved 31 August 2026.{{cite web}}: CS1 maint: url-status (link)

External links[edit | edit source]

  • UrbanRail.Net — descriptions of all metro systems in the world, each with a schematic map showing all stations.
  • Metromap.in --- Descriptions of Metro Systems in India, With HD Route Map and Fare Details.