Created by Monkbot
Last edited September 5, 2023
Talk
->WOSlinker
m remove tel link
m Enhanced content and organization
 
Line 1: Line 1:
{{Short description|Proposed monorail system for the city of Patna}}
{{Use dmy dates|date=June 2017}}
{{Use dmy dates|date=June 2017}}
{{Use Indian English|date=June 2017}}
{{Use Indian English|date=June 2017}}
Line 27: Line 28:
| map =  
| map =  
|alt=|caption=|area served=|line_number=|start=|end=|annual_ridership=|character=|map_state=}}
|alt=|caption=|area served=|line_number=|start=|end=|annual_ridership=|character=|map_state=}}
'''Patna Monorail''' is a proposed monorail system for the city of [[Patna]].<ref>{{cite web|url=http://english.samaylive.com/regional-news/bihar-news/676479852/mono-rail-for-patna-soon.html |title=Mono-Rail for Patna soon |publisher=Samaylive.com |date=2010-12-28 |access-date=2011-01-11}}</ref><ref>[http://www.monorails.org/tmspages/News.html Monorail News Briefs<!-- Bot generated title -->] {{webarchive|url=https://web.archive.org/web/20100613055508/http://monorails.org/tMspages/News.html |date=13 June 2010 }}</ref>
'''Patna Monorail''' was a proposed monorail system for the city of [[Patna]].<ref>{{cite web|url=http://english.samaylive.com/regional-news/bihar-news/676479852/mono-rail-for-patna-soon.html |title=Mono-Rail for Patna soon |publisher=Samaylive.com |date=2010-12-28 |access-date=2011-01-11}}</ref><ref>[http://www.monorails.org/tmspages/News.html Monorail News Briefs<!-- Bot generated title -->] {{webarchive|url=https://web.archive.org/web/20100613055508/http://monorails.org/tMspages/News.html |date=13 June 2010 }}</ref>


==Network==
==Network==
There are 4 lines proposed to be built. [[RITES]], the consultancy arm of [[Indian Railways]] has begun soil inspection as well as ground survey for the monorail network.<ref>[http://www.rediff.com/business/report/rites-begins-ground-survey-for-monorail-in-patna/20111021.htm RITES begins ground survey for monorail in Patna - Rediff.com Business<!-- Bot generated title -->]</ref><ref>[http://in.news.yahoo.com/monorail-ground-survey-tees-off-000000209.html Monorail ground survey tees off - Yahoo! News India<!-- Bot generated title -->]</ref>
There were 4 lines proposed to be built. [[RITES]], the consultancy arm of [[Indian Railways]] had begun soil inspection as well as ground survey for the monorail network.<ref>[http://www.rediff.com/business/report/rites-begins-ground-survey-for-monorail-in-patna/20111021.htm RITES begins ground survey for monorail in Patna - Rediff.com Business<!-- Bot generated title -->]</ref><ref>[http://in.news.yahoo.com/monorail-ground-survey-tees-off-000000209.html Monorail ground survey tees off - Yahoo! News India<!-- Bot generated title -->]</ref>


* [[Patna Junction]] to [[Gandhi Maidan]].
* [[Patna Junction]] to [[Gandhi Maidan]].
Line 38: Line 39:


==Project detail==
==Project detail==
The total estimated cost of the project is {{Indian Rupee}}2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna is 32&nbsp;km and in the first phase route length between 20&nbsp;km and 25&nbsp;km would be completed.<ref>{{cite news| url=http://www.telegraphindia.com/1111224/jsp/bihar/story_14922568.jsp | location=Calcutta, India | work=The Telegraph | title=Capital monorail project shifts gear | date=2011-12-24}}</ref>
The total estimated cost of the project was {{Indian Rupee}}2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna would be 32&nbsp;km and in the first phase route length between 20&nbsp;km and 25&nbsp;km was to be completed.<ref>{{cite news| url=http://www.telegraphindia.com/1111224/jsp/bihar/story_14922568.jsp | archive-url=https://archive.today/20120919080455/http://www.telegraphindia.com/1111224/jsp/bihar/story_14922568.jsp | url-status=dead | archive-date=19 September 2012 | location=Calcutta, India | work=The Telegraph | title=Capital monorail project shifts gear | date=2011-12-24}}</ref>


As of 2021 the project has not commenced.
{{As of|2021}} the project has not commenced.


==See also==
==See also==

Latest revision as of 23:41, 5 September 2023

Patna Monorail
Overview
LocalePatna, Bihar
Transit typestraddle-beam Monorail
Number of lines4 (planned)
Daily ridership32,000 (Estd.)
Operation
Began operationGovernment of Bihar preferred metro rail over mono rail
Train length4 coaches
Technical
System length32 kilometers (20 mi)
Electrification750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

Patna Monorail was a proposed monorail system for the city of Patna.[1][2]

Network[edit | edit source]

There were 4 lines proposed to be built. RITES, the consultancy arm of Indian Railways had begun soil inspection as well as ground survey for the monorail network.[3][4]

Project detail[edit | edit source]

The total estimated cost of the project was ₹2000-2500 Crore. The total length of the proposed 4 monorail corridors in Patna would be 32 km and in the first phase route length between 20 km and 25 km was to be completed.[5]

As of 2021 the project has not commenced.

See also[edit | edit source]

References[edit | edit source]

  1. ↑ "Mono-Rail for Patna soon". Samaylive.com. 28 December 2010. Retrieved 11 January 2011.
  2. ↑ Monorail News Briefs Archived 13 June 2010 at the Wayback Machine
  3. ↑ RITES begins ground survey for monorail in Patna - Rediff.com Business
  4. ↑ Monorail ground survey tees off - Yahoo! News India
  5. ↑ "Capital monorail project shifts gear". The Telegraph. Calcutta, India. 24 December 2011.{{cite news}}: CS1 maint: deprecated archival service (link)